croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
DocumentsPlanning Board, 2025-09-16

Cover Leter 9.9.25 1

site plan 2 pages
From the meeting: Planning Board — 2025-09-16
Agenda item: New Business — Croton Riverside, LLC - 25 South Riverside Ave. (78.8-5-43) - Amended Site Plan for Three-Story Multi-Family Building
Site plan, 2 pages. Attached to agenda item: “New Business — Croton Riverside, LLC - 25 South Riverside Ave. (78.8-5-43) - Amended Site Plan for Three-Story Multi-Family Building”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: A-200 AS-101 Landscape Plan Plant Photos Redacted Application 25 SRA
Kory Salomone ksalomone@zarin-steinmetz.com Also admitted in CT Phone: (914) 682-7800 Direct: (914) 220-9804 www.zarin-steinmetz.com 81 Main Street, Suite 415 White Plains, New York 10601 September 9, 2025 Sent Via Email Chairman Robert Luntz and Members of the Planning Board Village of Croton-on-Hudson 1 Van Wyck Street Croton-on-Hudson, NY 10520 Re: Site Plan Amendment 25 South Riverside Avenue Dear Chairman Luntz and Members of the Planning Board: As you will recall, I represent Croton Riverside, LLC, in connection with the project located at 25 South Riverside Avenue. In January 2021 we received Board of Trustees Special Permit Approval and Site Plan Approval from your Board to construct a three (3) story multi-family building at the site. As you may have observed, Croton Riverside has commenced construction and anticipates project completion in the 4th quarter of 2025. As part of our ongoing efforts to improve the aesthetics and operational efficiency of the building we are pleased to submit the following plans: 1. Architectural Site Plan 2. Landscape Plan 3. Plant Photos The above-referenced plans include the following changes: 1. Modification of the retaining wall geometry at the rear of the building to create a more open space at ground level, particularly at the south side to allow easier maintenance access. 2. Modification of the retaining wall geometry at the north end of the property to create a softer curve and capture uphill storm water runoff. 3. Elimination of the large concrete ADA ramp and switchback along front of the building from the main entrance to the north parking lot, and replacement with an ADA lift and typical stairwell allowing for a softer front and larger planting area along the north end of the building. Village of Croton-on-Hudson Planning Board 25 South Riverside Avenue September 9, 2025 | Page 2 4937-6485-5399, v. 1 4. Addition of a stairwell landing outside the building’s south stair tower and associated walkway directly out to Riverside Avenue to accommodate DPW access and maintenance of storm and sanitary sewer manholes at the south property boundary. We respectfully ask that this matter be placed on the Planning Board’s September 16th meeting agenda for a review of the proposed modifications. If you have any questions or concerns, please don’t hesitate to contact me. ZARIN & STEINMETZ LLP By: Kory Salomone

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.