croton.news
Independent, AI-assisted local reporting from public records
Croton-on-Hudson, New York · Saturday, October 3, 2026· Oct 3, 2026
Source-linked•Corrections welcomed
Documents › Board Of Trustees, 2026-04-08

Field CO 4 - Pullbox Modifications - Scope Approval

resolution 3 pages
From the meeting: Board Of Trustees — 2026-04-08 · our coverage →
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 4 related to the Van Cortlandt Manor Entrance Project at Historic Hudson Valley.
Resolution, 3 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 4 related to the Van Cortlandt Manor Entrance Project at Historic Hudson Valley.”
Retrieved 2026-09-29 from the village's meeting portal. View the original file ↗
Also attached to this agenda item: Resolution 76-2026 HHV Change Order 4
Colliers Engineering & Design Change Order Details PIN 8760.11| D033367 - Van Cortlandt Manor Description PIN 8760.11 Restoration of Van Cortlandt Manor Entrance Village of Croton-on-Hudson Westchester County   Prime Contractor Remus Industries, LLC 9 Old Albany Post Road Ossining, NY 10562 Change Order 4 Status Draft Date Created 04/03/2026 Type Field Change Order Summary FIeld CO#4 - Pullbox Modifications Change Order Description  - Pullbox size to be increased due to increase number of conduits to be installed - Replacement pullbox to deteriorated existing pullbox Awarded Project Amount $2,666,671.40 Authorized Project Amount $2,666,671.40 Change Order Amount $6,997.50 Change Order Details: PIN 8760.11| D033367 - Van Cortlandt Manor 04/07/2026 DRAFT Scope Approval Revised Project Amount $2,673,668.90 New Items Line Number Item ID Unit Quantity Unit Price Extension Section: 1 - Description 0910 950.01 DC 6,997.500 $1.000 $6,997.50 Material Cost Pullbox increase Reason: - Increase size of pullbox due to increase number of conduits to be installed - Replacement of existing pullbox due to deteriorated condition - See attached 1 item Total: $6,997.50 Change Order Details: PIN 8760.11| D033367 - Van Cortlandt Manor 04/07/2026 DRAFT _____________________________________        __________________                              Engineer                                                     Date   ______________________________________         __________________                             Contractor                                                    Date   ______________________________________         __________________                             Owner/Sponsor                                            Date   _____________________________________         __________________                   Responsible Local Official                                      Date   _____________________________________         __________________                         NYSDOT RLPL                                                Date Change Order Details: PIN 8760.11| D033367 - Van Cortlandt Manor 04/07/2026 DRAFT Signatures Below Constitute Approval of Scope for this Change Order. Payment and Quantity of Change Order to be verified in the field.

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.