25 South Riverside Ave. 2025
site plan
1 page
From the meeting:
Planning Board — 2025-10-07
· our coverage →
Agenda item: Public Hearing — Croton Riverside, LLC - 25 South Riverside Ave. (78.8-5-43) - Amended Site Plan for Three-Story Multi-Family Building
Site plan, 1 page. Attached to agenda item: “Public Hearing — Croton Riverside, LLC - 25 South Riverside Ave. (78.8-5-43) - Amended Site Plan for Three-Story Multi-Family Building”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
A-200
AS-101
Cover Leter 9.9.25 1
Croton Riverside Wall Calculations Rev2
Croton Riverside Wall Drawings Rev2
Landscape COLOR REVISED 9252025
Neighbor Letter
Plant Photos
Redacted Application 25 SRA
Extracted text
WHEREAS, the Planning Board held a public hearing on an Amended Site Plan application on
Tuesday, October 6, 2025 and, submitted by Croton Riverside LLC, hereafter known as “the
Applicant,” for property located at 21-27 South Riverside Avenue (also referred to as “25 South
Riverside Avenue”) in the Riverside Transition C-1R(B) Zoning District and designated on the Tax
Map of the Village of Croton-on-Hudson as Section 78.8 Block 5 Lot 43, and
WHEREAS, this amended site plan application was submitted to get approval for modifications of
the retaining wall geometry and the elimination of the large concrete ADA ramp to be replaced with
an ADA lift at this three-story, multi-family apartment building located at 25 South Riverside
Avenue and; and
WHEREAS, this proposal is considered a Type II Action under the State Environmental Quality
Review Act (SEQRA); therefore, no Negative Declaration is required; and
WHEREAS, all conditions from the Site Plan approval for a new three-story, multi-family
apartment building and associated parking for this applicant issued on September 28, 2021 remain
in effect; and
NOW, THEREFORE BE IT RESOLVED, that the Amended Site Plan application as shown on
plans A-200 “Building Elevations,” and AS-101, entitled “Architectural Site Plan,” last revised on
September 2, 2025, prepared by Design Development Architects of White Plains, and “Riverside
Apartments Landscape Plan, prepared by William Harris Einhorn, RLA of F Capparelli Landscape
Design, last revised on August 9th, 2025 be approved subject to the following conditions:
1) That the improvements agreed upon in the neighbor agreement are detailed on the
plans.
2) Certification for the new wall will be required before a certificate of occupancy is
issued.
The Planning Board of the Village of
Croton-on-Hudson, New York
Rob Luntz, Chairperson
John Ghegan
Geoffrey Haynes
Steve Krisky
Eva Thaddeus
Motion to approve by , seconded by , and carried by a vote of to .
Resolution accepted at the meeting held on October 7th, 2025.
Machine-extracted for search and reference — the original PDF is the authoritative version.