croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
DocumentsZoning Board of Appeals, 2025-09-30

250930 Switch-Electric ZBA ALTERNATE PLAN Submission Package 9.29.25

agreement 8 pages
From the meeting: Zoning Board of Appeals — 2025-09-30 · our coverage →
Agenda item: OLD BUSINESS — Rob Luntz, architect, representative for John & Kerry Whelan of Switch Inc Electrical Contractors---25 North Riverside Avenue--Located in the C-1 R (A) Riverside Commercial District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 78.08 Block 3 Lots 63 & 64. Request for a rear yard variance from Village Zoning Code Section 230-35 for a proposed second story addition to an existing commercial building and for a variance request for a 2-year period to commence work from Village Zoning Code Section 230-164(E).
Agreement / contract, 8 pages. Attached to agenda item: “OLD BUSINESS — Rob Luntz, architect, representative for John & Kerry Whelan of Switch Inc Electrical Contractors---25 North Riverside Avenue--Located in the C-1 R (A) Riverside Commercial District and designated on the T”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 25 NRA Completed zba application Redacted 250701 Switch-Electric ZBA Submission Package
R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 EXISTING BUILDING AND BUILDABLE VOLUME A004 AERIAL VIEW OF EXISTING BUILDING AND BUILDABLE VOLUME (35' MAX. HEIGHT PER ZONING) N.T.S. R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 POTENTIAL BUILDING UTILIZING ALLOWABLE BUILDING VOLUME A019 ZBA REVIEW 09/30/2025 THREE-STORY BUILDING (35' MAX. HEIGHT PER ZONING) N.T.S. R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A020 ZBA REVIEW 09/30/2025 SITE PLAN SITE PLAN N.T.S. 30'-0" (REAR YARD SETBACK) 10'-0" (SIDE YARD SETBACK) NORTH ELEVATION VIEW FROM BANK STREET R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A021 ZBA REVIEW 09/30/2025 NORTH ELEVATION VIEW FROM BANK STREET N.T.S. NORTHWEST VIEW FROM CORNER R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A022 ZBA REVIEW 09/30/2025 NORTHWEST VIEW FROM THE CORNER OF BANK STREET AND NORTH RIVERSIDE AVE N.T.S. R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A023 ZBA REVIEW 09/30/2025 WEST ELEVATION VIEW FROM NORTH RIVERSIDE AVE WEST ELEVATION VIEW FROM NORTH RIVERSIDE AVE N.T.S. 35'-0" R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A024 ZBA REVIEW 09/30/2025 SOUTHWESTERN VIEW SOUTHWESTERN VIEW N.T.S. R E S 4 COPYRIGHT © RESOLUTION: 4 ARCHITECTURE. ALL RIGHTS RESERVED. 150 WEST 28TH STREET, SUITE 1902, NEW YORK, NY 10001 SCALE: DATE: 25 N RIVERSIDE AVE SWITCH-ELECTRIC RENOVATION 07/01/2025 NTS CROTON-ON-HUDSON, NY 10520 R E S O L U T I O N : 4 A R C H I T E C T U R E TEL: 212.675.9266 www.re4a.com FAX: 212.206.0944 RESOLUTION: 4 ARCHITECTURE ISSUE DATE: SET: ZBA SUBMISSION 07/01/2025 A025 ZBA REVIEW 09/30/2025 SOUTHERN ELEVATION SOUTHERN ELEVATION N.T.S.

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.