Resolution 295-2025 HMB Bridge Consultant Agreement
resolution
1 page
From the meeting:
Board Of Trustees — 2025-12-17
· our coverage →
Agenda item: Consent Agenda — Resolutions — Consider authorizing the Village Manager to execute the Consultant Agreement with Tectonic Engineering for the Half Moon Bay Bridge Reconstruction Project.
Resolution, 1 page. Attached to agenda item: “Consent Agenda — Resolutions — Consider authorizing the Village Manager to execute the Consultant Agreement with Tectonic Engineering for the Half Moon Bay Bridge Reconstruction Project.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Consultant Agreement - Tectonic
Resolution 29-2024 Half Moon Bay Bridge Consulting Services
Scope of Services - Halfmoon Bridge Tectonic R1
Extracted text
On motion of TRUSTEE -, seconded by TRUSTEE -, the following resolution was
adopted by the Board of Trustees of the Village of Croton-on-Hudson, New York
with the following vote:
Resolution #295-2025
WHEREAS, the Village of Croton-on-Hudson assumed the ownership of and
maintenance requirements for the Half Moon Bay Bridge over the Metro-North
Railroad tracks in 1996; and
WHEREAS, in order to address past safety issues and the proper maintenance of the
bridge, the Village is moving ahead with the rehabilitation and reconstruction of the
Half Moon Bay Bridge; and
WHEREAS, on February 7, 2024, the Village Board of Trustees adopted Resolution
29-2024 to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut,
to provide consulting and engineering design services for the project; and
WHEREAS, the New York State Dept. of Transportation requires the Village and
Tectonic to enter into a formal consultant agreement,
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes
the Village Manager to execute the Consultant Agreement with Tectonic Engineering.
Dated: December 17, 2025
Machine-extracted for search and reference — the original PDF is the authoritative version.