PIN8760.11 Award Letter DBE-20251209
resolution
2 pages
From the meeting:
Board Of Trustees — 2025-12-17
· our coverage →
Agenda item: Proposed Resolutions — Consider awarding Bid No. 16-2025 for the Van Cortlandt Manor Entrance Project at Historic Hudson Valley to Remus Industries of Ossining, New York.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider awarding Bid No. 16-2025 for the Van Cortlandt Manor Entrance Project at Historic Hudson Valley to Remus Industries of Ossining, New York.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Bid Sheet
Resolution 300-2025 VCM Project
Extracted text
Dec 09, 2025
Bryan Healy, Village Manager
Village of Croton-On-Hudson
1 Van Wyck Street
Croton-On-Hudson, NY 10520
RE: PIN 8760.11 VANCORTLANDT MANOR ENTRANCE
IMPROVEMENTS, CROTON-ON-HUDSON, WESTCHESTER
COUNTY AWARD CONCURRENCE
Dear Mr. Bryan:
We have reviewed the contract award documentation package submitted by email on December 02,
2025 and the Certification of Bidding and Award submitted to the Local Projects Unit. Documentation
of the construction contract bidding and award process is complete and satisfactory, therefore, the
Department concurs with your recommendation to award.
Once available, please forward a copy of the official project award letter to the Local Projects
Unit.
Please be reminded of the emphasis placed on Disadvantaged Business Enterprise (DBE) utilization
and the documentation thereof. The utilization of DBEs per the project’s assigned DBE goal and the
approved utilization plan are an important part of the construction contract. Per Section 105-21 of
NYSDOT Standard Specifications, the contractor shall use the current version of the Department
approved civil rights reporting software on all contracts. That reporting software is Equitable Business
Opportunity Solution (EBO).
Also, during construction the oversight, management and inspection of the project should be
performed in accordance with the contract documents, the approved Construction Management Plan
and Chapter 15 of the Local Projects Manual. Special note should be made of Section 15.4.2
regarding Change Orders. The Local Projects Unit, Office of Construction and/or FHWA may visit the
project site during construction to monitor progress and compliance with key federal requirements.
Prior to commencing work a pre-construction meeting must be held to discuss Federal requirements
which must be met during the construction phase. Attendees at this meeting shall include
representatives from the contractor, inspection team, Local Projects Unit and your office.
Please contact Tarek Elmenayar at (845)431-5871or tarek.elmenayar@dot.ny.gov and Barbara
Mattice at (315)317-1189 or barbara.mattice@dot.ny.gov (to schedule this pre-construction meeting.
Orietta V. Trocard, P.E.
Regional Local Projects Liaison
BY:
Tarek Elmenayar
Regional Construction Local Projects Liaison