TO: Bryan Healy, Village Manager
FROM: Friends of Croton Parks
DATE: October 29, 2026
SUBJECT: Budget Breakdown Request: Regional Resilience Grant Application for
Gouveia Parkland Accessibility Trail & Native Plantings
DEADLINE: November 10, 2026
Dear Bryan Healy and Members of the Board of Trustees,
As we prepare our application for the upcoming Regional Resilience Grant to fund the
interior parkland accessibility trail and native planting initiatives at Gouveia Park, we are
finalizing our project budget. Based on the initial concept developed with our landscape
architect, we are seeking specific financial estimates from the Village to ensure our
application reflects accurate project costs and municipal contributions.
Our application will request $60,000 for the interior trail and $25,000 for native
plantings. While the original concept estimate for the interior trail was $50,000, our
updated plan includes outdoor sculpture pads and platforms to feature works donated or
loaned by local artists.
To align with the grant guidelines (a sample worksheet is included with this memo), our
financial packet requires line-item estimates across four key categories:
1. Personnel (Department of Public Works & Village Staff): Estimated labor
hours, hourly rates, or projected in-kind/municipal contributions for DPW staff
involved in site prep, trail clearing, or installation support.
2. Outside Consultants & Contractors: Projected costs for ongoing landscape
architecture services, specialized contractors, or site engineering required for trail
construction, bridge placement, or habitat installation.
3. Project Expenses: Estimated costs for materials and equipment (e.g., native
plants, seed mixtures, trail gravel/woodchips, sculpture pads, signage, bridges)
and printing/production (e.g., educational markers, site maps).
4. Outreach & Community Engagement: Projected costs for community
workshops, volunteer workday supplies, promotional materials, or launch events.
To ensure we have sufficient time to compile the final submission packet, we kindly
request that these budget estimates be provided by Monday, November 10, 2026.
If useful, I am available to meet briefly or talk through these line items alongside the
DPW supervisor or finance director at your convenience.
Thank you for your continued partnership and support in making Gouveia Park a vibrant
sanctuary for our community.
Judith Lewis
Co-Chair
Friends of Croton Parks
Friendsofcrotonparks@gmail.com
914-582-0708