croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Monday, August 17, 2026· Aug 17, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2026-03-25

Water Tank study - memo to the board

resolution 1 page
From the meeting: Board Of Trustees — 2026-03-25 · our coverage →
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal for the assessment of the Upper North Highland Water Storage Tank from USG Water Solutions in the amount of $4,800.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal for the assessment of the Upper North Highland Water Storage Tank from USG Water Solutions in the amount of $4,800.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Resolution 64-2026 Water Tank RFP
To: From: Frank Balbi, P.E., Superintendent of Public Works Date: March 10, 2026 Re: Assessment of Existing Water Storage Tank - RFP # 20-2025 Recently, the Village advertised a Request for Proposal for qualified firms to evaluate and make recommendations for the repairs, improvements, or replacement of the Upper North Highland Water Storage Tank. The Village owns, operates and maintains the existing tank, and due to its age a thorough inspection and review of the structures is needed. The goal for the tank improvements, repairs or replacement is to provide the Village with a facility that can feasibly meet all applicable current codes and standards as well as operational needs. The RFP described the minimum required scope of services, the consultant selection process, and the minimum information to be included in the Proposal. On October 30, 2025, the Village of Croton-on-Hudson advertised a Request for Proposals for the Assessment of Existing Water Tank (Bid # 20-2025). On December 10, 2025, a total of five proposals were received and publicly read. The following results were returned: Bid Results: Bidder Bid Amount 1. USG Water $ 4,800.00 2. D&B Engineers $ 21,500.00 3. H2M $ 33,970.00 4. Thorton Tomasetti $ 211,200.00 5. ATiS LLC. $ 12,100.00 The water department met with USG Water during the bid period, and we’ve had subsequent conversations with them since. We believe they have a firm understanding for the scope of work, and their references and past projects line up with our proposed work. I recommend approving USG Water’s proposal for the water tank assessment in the amount of $4,800.00. Funding for this contract is included in the Capital Budget account H8340.2106.22399. Mayor Brian Pugh Trustees Len Simon Nora Nicholson Stacey Nachtaler Maria Slippen Village Manager Bryan T. Healy Treasurer Genette Toone Village Clerk Pauline DiSanto Village of Croton-on-Hudson New York Stanley H. Kellerhouse Municipal Building One Van Wyck Street Croton-on-Hudson, NY 10520-2501

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.