Village Engineer Memo 2015
site plan
1 page
Scanned/OCR — text may contain errors
From the meeting:
Planning Board — 2026-11-24
· our coverage →
Agenda item: Old Business — MAF Realty (Mark Franzoso) 74 Grand Street (78.8-6-59) -- Request for extension of Minor Site Plan Approval
Site plan, 1 page. Attached to agenda item: “Old Business — MAF Realty (Mark Franzoso) 74 Grand Street (78.8-6-59) -- Request for extension of Minor Site Plan Approval” (Text recovered by OCR — may contain errors.)
Retrieved 2026-11-24 from the original source.
View the original file ↗
Also attached to this agenda item:
2024 Two Year Extension Approval
74 Grand St minor site plan extension No 7 Nov 2026
74 Grand Street Original Resolution
74 Grand Street and Floor Plan and Rendering
74 and 78 Grand Street memo 11-19-2026
All Minutes for MAF Grand Street Extensions
All Previous Resolutions MAF Grand St
Approved Site Plans 74 Grand St
FINAL PB Minutes 10.01.24 2
Extracted text
Village of Croton-on-Hudson
ENGINEERS OFFICE
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street, 2nd floor
Croton-on-Hudson, NY 10520-2501
Mayor
Leo A.W. Wiegman
Trustees
Ann H. Gallelli
Maria Slippen
Andrew Levitt
Brian Pugh
Village Manager
Janine King
Village Treasurer
Sandra Bullock
Village Engineer/Building Inspector
Daniel O’Connor, P.E.
Asst. Building Inspector/Assessor
Joseph Sperber
Fire Inspector
Peter Anfiteatro
MEMORANDUM
Date: 12/8/15
To: Planning Board Chairman Luntz and Board Members
From: Daniel O’Connor
Subject: 74, 78 and 88 Grand Street – Minor site Plan Applications
The application materials for the above reference properties have been reviewed and comments are as follows.
1. Retaining walls over 6.5’ in height are classified as accessory structures under the Zoning Code and are therefore required to be 5’ minimum from the property, be located in the side or rear yards and not project closer to the street than the primary structure. Portions of the retaining walls on the plans exceed the 6.5’ height and are not in compliance with the Zoning regulations. It the height of the walls and not reduced to comply with the Zoning Code a variance from the ZBA will be required.
2. Provide details for driveway aprons..
3. The plans should include notes for the sequence of construction.
4. It is recommended that the storm water system overflow lines for 74 and 78 Grand Street be installed in the same trench to minimize disturbance.
5. A cross lot easement is required to be granted over 74 Grand Street for the benefit of 78 Grand Street. The easement should be reviewed by the Village attorney and Village engineer and a copy of the filed easement shall be submitted to the Village Engineer prior to the issuance a certificate of occupancy for 74 Grand St. or a building permit for 78 Grand Street.
6. The storm water overflow for 88 Grand Street shows it being discharged onto the adjacent lower property. Additional information is needed as to how this pipe will terminate and the potential impacts to the adjacent downhill property.
7. Additional details and notes need to be provided on the plans for: storm water system pipes (material and diameters and min. slopes), yard drains and grates, , storm water system elevations, and storm water manhole and frame and cover.
8. Street trees and others being saved need to be protected with fencing and possible truck protection details of both should be included on the plans
9. Safety fencing should be considered on the high portions of the retaining walls in the front of the houses.
cc: File
Tel: 914-271-4783
www.crotononhudson-ny.gov
Fax: 914-271-3790
Machine-extracted for search and reference — the original file is the authoritative version.