croton.news
Croton-on-Hudson, NY · Tuesday, November 24, 2026· Nov 24, 2026 Independent, AI-assisted local reporting from public records Source-linked·Corrections welcomed
Documents › Planning Board, 2026-11-24

Village Engineer Memo 2015

site plan 1 page Scanned/OCR — text may contain errors
From the meeting: Planning Board — 2026-11-24 · our coverage →
Agenda item: Old Business — MAF Realty (Mark Franzoso) 74 Grand Street (78.8-6-59) -- Request for extension of Minor Site Plan Approval
Site plan, 1 page. Attached to agenda item: “Old Business — MAF Realty (Mark Franzoso) 74 Grand Street (78.8-6-59) -- Request for extension of Minor Site Plan Approval” (Text recovered by OCR — may contain errors.)
Retrieved 2026-11-24 from the original source. View the original file ↗
Also attached to this agenda item: 2024 Two Year Extension Approval 74 Grand St minor site plan extension No 7 Nov 2026 74 Grand Street Original Resolution 74 Grand Street and Floor Plan and Rendering 74 and 78 Grand Street memo 11-19-2026 All Minutes for MAF Grand Street Extensions All Previous Resolutions MAF Grand St Approved Site Plans 74 Grand St FINAL PB Minutes 10.01.24 2
Village of Croton-on-Hudson ENGINEERS OFFICE Stanley H. Kellerhouse Municipal Building One Van Wyck Street, 2nd floor Croton-on-Hudson, NY 10520-2501 Mayor Leo A.W. Wiegman Trustees Ann H. Gallelli Maria Slippen Andrew Levitt Brian Pugh Village Manager Janine King Village Treasurer Sandra Bullock Village Engineer/Building Inspector Daniel O’Connor, P.E. Asst. Building Inspector/Assessor Joseph Sperber Fire Inspector Peter Anfiteatro MEMORANDUM Date: 12/8/15 To: Planning Board Chairman Luntz and Board Members From: Daniel O’Connor Subject: 74, 78 and 88 Grand Street – Minor site Plan Applications The application materials for the above reference properties have been reviewed and comments are as follows. 1. Retaining walls over 6.5’ in height are classified as accessory structures under the Zoning Code and are therefore required to be 5’ minimum from the property, be located in the side or rear yards and not project closer to the street than the primary structure. Portions of the retaining walls on the plans exceed the 6.5’ height and are not in compliance with the Zoning regulations. It the height of the walls and not reduced to comply with the Zoning Code a variance from the ZBA will be required. 2. Provide details for driveway aprons.. 3. The plans should include notes for the sequence of construction. 4. It is recommended that the storm water system overflow lines for 74 and 78 Grand Street be installed in the same trench to minimize disturbance. 5. A cross lot easement is required to be granted over 74 Grand Street for the benefit of 78 Grand Street. The easement should be reviewed by the Village attorney and Village engineer and a copy of the filed easement shall be submitted to the Village Engineer prior to the issuance a certificate of occupancy for 74 Grand St. or a building permit for 78 Grand Street. 6. The storm water overflow for 88 Grand Street shows it being discharged onto the adjacent lower property. Additional information is needed as to how this pipe will terminate and the potential impacts to the adjacent downhill property. 7. Additional details and notes need to be provided on the plans for: storm water system pipes (material and diameters and min. slopes), yard drains and grates, , storm water system elevations, and storm water manhole and frame and cover. 8. Street trees and others being saved need to be protected with fencing and possible truck protection details of both should be included on the plans 9. Safety fencing should be considered on the high portions of the retaining walls in the front of the houses. cc: File Tel: 914-271-4783 www.crotononhudson-ny.gov Fax: 914-271-3790

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.