V of Croton on Hudson BRIDGE NY Proposal Letter 9A Culvert
resolution
2 pages
Meeting: portal event 915 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider accepting a proposal from C.T. Male Associates of Latham, NY to prepare an application for funding to replace a culvert on State Route 9A through the BRIDGE NY program in an amount not to exceed $5,800.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider accepting a proposal from C.T. Male Associates of Latham, NY to prepare an application for funding to replace a culvert on State Route 9A through the BRIDGE NY program in an amount not to ”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
CT Male Short Form Contract V of Croton-on-Hudson...
December 20th Resolution 273-2023 CT Male
Extracted text
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 Century Hill Drive, Latham, NY 12110
518.786.7400
FAX 518.786.7299
www.ctmale.com
Civil Engineering Environmental Services Survey Services Land Services Architecture
Energy & Building Systems Services Electrical Engineering
December 11, 2023
Mr. Bryan Healy, Village Manager
Village of Croton-on-Hudson
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501
RE:
PROPOSAL
2023-2024 Bridge NY Funding Application Preparation – Route 9A Culvert
Dear Bryan:
C.T. Male Associates Engineering, Surveying, Architecture, Landscape Architecture &
Geology, D.P.C. (C.T. Male) appreciates the opportunity to submit our proposal to
prepare a Bridge NY funding application for replacement of a culvert on State Route 9A,
which was in place prior to the early 1970s and is believed to be the Village’s
responsibility for maintenance and/or reconstruction.
We have summarized the anticipated tasks to prepare the Bridge NY Application for this
potential culvert replacement project, consistent with NYSDOT guidelines:
Review Existing Culvert Information:
C.T. Male will conduct a review of prior and recent technical information about the
culvert project site to update existing conditions information and photograph
documentation to verify the severity of the culvert and need for its replacement.
Resource information may include but not be limited to existing base mapping, any prior
design and repair studies, and local inspection and maintenance reports and related
correspondence or other records.
Prepare and Submit the Bridge NY Application:
We will complete all documentation required for the Bridge NY Application with an
anticipated deadline of January 19, 2024, including a detailed cost estimate, project
schedule, site location maps, SEQR/NEPA environmental review documentation,
compilation of recent inspection reports, including an on-site inspection, and narratives
about the most recent documented deficiencies and any related flooding and drainage
issues, along with evaluation of current right of way needs and a possible hydraulic
analysis to scope the expected size of the replacement culvert structure.
C.T. MALE ASSOCIATES
December 11, 2023
Mr. Bryan Healy, Village Manager
Page - 2
We will prepare the 2024 Bridge NY Application as outlined above for the Route 9A
Culvert including a site visit by a licensed Engineer to assess current conditions and
prepare supporting inspection and hydraulic information, for a lump sum of $5,800,
including all expenses and two bound copies of the Application after submission.
We appreciate the opportunity to submit this Proposal and look forward to working with
you and Frank. Should you have any questions regarding this Letter or the attached
Contract Agreement, please feel free to contact me at (518) 390-0944 or through Email as
provided below.
C.T. MALE ASSOCIATES
Jim Thatcher
Manager, Community Development
j.thatcher@ctmale.com