County Planning Board - Battery Energy Storage Systems
local law
1 page
Meeting: portal event 927 (no meeting page on file)
Agenda item: Public Hearings — Public Hearing on Local Law Introductory No. 22 of 2023 to amend Chapter 230, Zoning, of the Village Code to update the provisions related to solar energy systems and establish provisions related to battery energy storage systems.
Local law, 1 page. Attached to agenda item: “Public Hearings — Public Hearing on Local Law Introductory No. 22 of 2023 to amend Chapter 230, Zoning, of the Village Code to update the provisions related to solar energy systems and establish provisions related to bat”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Croton-on-Hudson Conservation Advisory...
DRAFT 1 - Local Law Introductory No. 22 of 2023
DRAFT 2 - Local Law Introductory No. 22 of 2023...
December 20th Resolution 270-2023 LL Intro 22 of 2023...
EAF I Solar
Full EAF - Part 1
January 24th Resolution 11-2024 LL Intro 22 of 2023...
Local Law Solar CAF
Memo to Village Board from Planning Board - Local Law 22-2023
Model-Battery-Energy-Storage-Systems-Law
Updated Memo from WAC to VB Local Law 22
Extracted text
Pursuant to Section 239 L, M and N of the General Municipal Law and
Section 277.61 of the County Administrative Code
George Latimer
County Executive
432 Michaelian Office Building
148 Martine Avenue
White Plains, New York 10601
Telephone: (914) 995-4400
Website: westchestergov.com
February 7, 2024
Paula DiSanto, Village Clerk
Village of Croton-on-Hudson
One Van Wyck Street
Croton-on-Hudson, New York 10520-2501
County Planning Board Referral File CRO 24-001B – Battery Energy Storage Systems
Zoning Text Amendment
Dear Ms. DiSanto:
The Westchester County Planning Board has received a revised local law to amend the text of the Croton-
on-Hudson Zoning Ordinance to establish regulations regarding the construction of Battery Energy
Storage Systems (BESS). Two tiers of BESS systems would be established. Tier One would include
installations of 600 kWh and lower, and would not require site plan approval. Tier Two would include
larger installations and would require Special Use and Site Plan review, and would only be permitted
within the RA-40, RA-60, C-2 and LI zones. The updated proposal also includes revisions to the solar
energy system portion of the Code, including canopy-mounted systems over parking lots as a Tier 1 solar
system, regulating Tier 3 systems to under one acre, and creating a new Tier 4 for systems larger than
one acre.
We previously reviewed this matter under the provisions of Section 239 L, M and N of the General
Municipal Law and Section 277.61 of the County Administrative Code and responded with a letter dated
January 8, 2024. We thank the Village for providing this clarification of the proposed law, and continue
to commend the Village for considering the adoption of regulations permitting and guiding the
development of BESS installations and solar energy systems.
Please inform us of the Village’s decision so that we can make it a part of the record.
Thank you for calling this matter to our attention.
By:
Blanca P. Lopez
Commissioner
BPL/MV
Machine-extracted for search and reference — the original PDF is the authoritative version.