21-22 Hannigan SWPPP 2-6-2024 1
site plan
275 pages
Meeting: portal event 930 (no meeting page on file)
Agenda item: Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House
Site plan, 275 pages. Attached to agenda item: “Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Hannigan Site Plan 2-06-24
Steep Slope Application Letter 2-6-24
Extracted text
52 Upland Lane
Page iv
Table of Contents
1.0
Project Description
2.0
Stormwater Regulatory Requirements
2.1
Stormwater Impacts
2.2
Regulatory Obligation
2.2.1 USEPA/NYSDEC
2.2.2 Local Municipality
2.2.3 NYC DEP
3.0
Reducing Pollutant Impacts (update)
3.1
Sources of Impacts
3.2
Stormwater Management During Construction
3.3
Stormwater Management Post-Construction
4.0
Site Characteristics
4.1
Soils
4.2
Hydrology
5.0
Hydrologic Analysis
5.1
Pre-Development Condition
5.2
Post-Development Condition
6.0
Unified Stormwater Sizing Criteria
6.1
Extreme Flood (Qf)
7.0
Stormwater Management Practices Selection, Justification, and Design
8.0
Erosion and Sediment Control
9.0
Construction Sequence
10.0 Inspection and Reporting
11.0 Installation and Maintenance of Stormwater Management Practices
11.1 During Construction
11.2 After Construction
12.0 Owner / Contractor Responsibilities
12.1 Owner Certification Statement
12.2 Contractor Certification Statement
12.3 Retention of Records
13.0 Conclusion
List of Figures
1.1
Location Map
1.2
Vicinity Map
1.3
NYS OPRHP Historic Resource Map
4.1
Soil Map
52 Upland Lane
Page v
5.1
Pre-Development Conditions – Watershed Map
5.2
Post-Development Conditions – Watershed Map
Appendices
Appendix A List of Required Approvals and Applications
- Village of Croton-on-Hudson Site Plan Approval – approval pending
- Town of Pound Ridge Building Permit – approval pending;
Appendix B Regulatory Ordinances
- NYSCDEC General Permit No. GP -0-20-001
- Local Ordinance – Village of Croton on Hudson Chapter 196 of the
Town Code
- Local Ordinance – Town of Cortlandt Chapter 262 of the Town Code
Appendix C
- Owner/Operator Certification
- Contractor Certification
Appendix D Construction Sequence
Appendix E Soil Testing Data
Appendix F Hydrologic Analysis
Appendix G Hydraulic Storm Sewer Capacity Analysis
Appendix H SMP Selection
Appendix I Stormwater Management Practices Design:
- Subsurface Stormwater Management System Volume Calculations
Appendix J Standard and Specifications for Erosion and Sediment Control
Measures
Appendix K Sample Inspection Reports
Appendix L Schedule “B”
Appendix M Project Plans
52 Upland Lane
This project requires approval under Chapter 196, Stormwater, Drainage, Erosion
and Water Pollution Control, of the Village of Croton on Hudson Code. The project
also requires approval under Chapter 262, Stormwater Management and Erosion and
Sediment Control, of the Town of Cortlandt. Furthermore, the Code requires
compliance for projects with a land disturbance activity of 5,000 s.f. or more.
Therefore, the project must provide management of the 100-year storm event.
The technical standards providing guidance in the preparation of the E&SC and
SWPPP are the latest revisions of the following:
▪
“New York Standards & Specifications for Erosion and Sediment Control”
(NYSSESC) published by the Empire State Chapter of the Soil and Water
Conservation Society; and;
▪
“New York State Stormwater Management Design Manual” prepared by the
Center of Watershed Protection, for the NYS DEC;
▪
Village of Croton-on-Hudson – Village Code Chapter 196 Stormwater, Drainage,
Erosion and Water Pollution Control;
▪
Town of Cortlandt – Town Code Chapter 262 Stormwater Management and
Erosion and Sediment Control;
2.2.3 NYC DEP
This site is not located within the limits of the New York City Watershed. This
project is not required, therefore, to comply with Chapter 18 of the “Rules and
Regulations for the Protection from Contamination, Degradation, and Pollution of the
New York City Water Supply and its Sources.”
3.0
Reducing Pollutant Impacts
3.1
Sources of Impact
For this project, the potential for contamination of stormwater occurs both during
construction and after the completion of development. The goal to achieve reduced
impacts involves containment and treatment of the various pollutants.
The proposed project will require temporary sediment and erosion control
measures. The greatest source of pollutants during these phases is the potential of
soil erosion. The nature of the construction plan is to have exposed soils which can
erode and potentially discharge to sensitive areas. During construction, existing
vegetation is removed exposing soils. Also, stockpiling of soils takes place. These
conditions if not stabilized, are subject to erosion during rainfall events and wind
conditions. Sediment discharged to a wetland can destroy vegetation and habitat
affecting the function of the wetland. This degradation potential can be irreversible and
eliminate its function in the ecosystem. Increases in turbidity to open water bodies
such as streams, ponds, etc., are an additional environmental impact.
The implementation of proper erosion control measures and sediment
containment along with a planned construction sequence can minimize or eliminate
52 Upland Lane
these potential impacts. The selection and implementation of erosion and sediment
practices are described in a later section of this Report.
3.2
Stormwater Management During Construction
The Erosion and Sediment Control plan will be implemented during all phases
of construction until the completion of the project. This will minimize or eliminate the
potential short-term adverse impacts which may occur during construction. After
completion, the erosion and sediment control will become a maintenance plan to
ensure that permanent erosion and sediment controls continue to function and prevent
the transport of sediments.
The Erosion and Sediment Control plan includes the Sequence of Construction
and designed measures to be installed, operated and maintained during all aspects of
construction. The appropriate measures were selected and detailed in plan for
implementation by the site contractor. The main objective of the plan is to prevent
erosion from occurring by stabilization of the construction site where possible.
Sediment controls are to be used as a containment system to allow the removal of
sediment from runoff to the greatest extent possible before leaving the work site.
Control methods and standards utilized are provided in the NYSSESC.
Potential sources of destabilization of the site have been determined so that
proper measures will be used. The locations and methods designed for erosion and
sediment control measures change as the construction sequence progresses. The
priority is to stabilize disturbed areas subject to erosion and use containment and / or
filtering practices where sediment may concentrate. Some of the practices and
methods that will be used for this project are:
•
Minimization of open disturbance by use of stabilizers such as seed, mulch, and
erosion blankets, stone, etc. Areas not subject to construction traffic for
extended periods will be temporarily stabilized.
•
The work areas will be contained. Down grade perimeters will be lined with
barriers such as silt fence, diversions, berms, etc.
•
Where possible, clean stormwater will be diverted away or around the work site
to reduce the amount of runoff requiring treatment.
•
Sediment traps will be constructed where heavy concentrations of runoff may
accumulate.
•
Dust control measures will be maintained on-site such as water trucks.
•
Runoff will be prevented from gaining erosive velocities on long slopes. This
can be achieved with seed and mulch, erosion control blankets, curb dams and
multiple rows of silt fence.
•
Existing drainage structures will be protected from sediment-laden runoff.
•
Regular weekly inspections and reports, if required, will be filed with the
Operator by the Town.
Additional methods of practices may be employed dependent on the situation.
The NYSSESC consists of NYS DEC accepted and recommended practices. The
design requirements of temporary and permanent erosion and sediment control
practices of this Manual have been followed.
Prior to completion of the project, all permanent structural features will be
cleaned, restored, and re-vegetated as necessary. The erosion and sediment control
phase of the project is complete when all work is finished, and all areas are stabilized.
The post-construction Stormwater Management Inspection and Maintenance Agreement
52 Upland Lane
(Schedule “B” in Appendix L) will describe the long term inspection schedule, periodic
maintenance requirements, and the responsible party.
3.3
Stormwater Management Post-Construction
The post-construction design of the project must be included in the Stormwater
Pollution Prevention and Stormwater Management Plans to minimize or eliminate
potential long-term adverse impacts which might be caused by surface runoff from the
site. This will deal with the management of the stormwater upon completion and
operation of the site. The plan will be an analysis of all potential impacts due to
stormwater and the means of protecting adjoining water bodies.
The management plan begins with conceptual designs of the collection and
conveyance system and the proposed treatment practices. The treatment practices are
subject to different parameters and must be designed to best fit the site including
green infrastructure planning. Some of the limitations that may be encountered include
soil types and properties, depth to groundwater or bedrock, distance to structures, and
maintenance. A list of acceptable practices can be found in Chapters 3, 5, and 10 of
the NYS Stormwater Design Manual (SMDM). Chapter 3 states “The Practices on this
list are selected based on the following criteria:
1.
Can capture and treat the full water quality volume (WQV)
2.
Are capable of 80% TSS removal and 40% TP removal
3.
Have acceptable longevity in the field
4.
Have a pre-treatment mechanism.”
Green Infrastructure Practices include:
I.
Preservation of Natural Resources
II.
Reduction of Impervious Cover
III.
Runoff Reduction Techniques
The five broad groups of standard stormwater management practices are:
I.
Stormwater Ponds
II.
Stormwater Wetlands
III.
Infiltration Practices
IV.
Filtering Practices
V.
Open-channel Practices
These practices “are presumed to meet water quality requirements set forth in
this manual if designed in accordance with the sizing criteria presented in Chapter 4
and constructed in accordance with the performance criteria in Chapter 6."2
4.0
Site Characteristics
4.1
Soils
2 Pg. 3-7 NYS Stormwater Management Design Manual, January 2015.
52 Upland Lane
On-site soils were classified by using the USDA Natural Resources Conservation
Service (NRCS) Websoil survey for Westchester County, NY, see Figure 4.1 – Soil
Map.
The predominant soil type for this project is Chatfield-Charlton complex. This
soil is somewhat well-drained and its slopes range from 15 to 35 percent. The
Hydrologic classification of this soil is “B”. The erosion hazard level for these soils is
high as it contains very steep slopes. These soil properties are essential in the design
and proper construction management of the site. Independent soil tests were
performed, and the results are located in the Appendix E of this Report.
•
Charlton, fine sandy loam – Typically found as hills, ridges, or ground moraines,
3 to 8 percent slopes, well-drained soils – slight to moderate erosion hazard;
•
Charlton-Chatfield – Found as hills and ridges, 0 to 15 percent slops, well-
drained – slight to moderate erosion hazard.
Deep Test Soil Logs and soil percolation test data are included in Appendix E
of this Report. The locations of these deep soil tests are indicated on the
Construction Drawings. On-site soil investigation and knowledge of the soil groups
facilitated the selection of coefficient values used for the pre- and post-development
pollutant load scenarios. Additionally, curve numbers were determined for use in the
analysis.
4.2
Hydrology
The proposed improvements will not significantly change the surface runoff
patterns. Currently, the surface runoff pattern is in an east to west direction, toward
an existing natural swale formed at the north-northwestern side of the property. The
surface runoff pattern is a combination of sheet flow and concentrated flow. The
majority of the site to be developed consists of forested area and shrub. Flow starts
on the southeast section of the site by the existing stone walls delineating the
property. The flow then travels slightly diagonal in a northwest direction towards the
existing swale on the west, and then follows its course.
Under the proposed condition the general direction of the surface runoff will not
be altered. Almost the entire amount of surface runoff from the impervious areas will
be collected and attenuated. Since the land is currently vacant, the predeveloped
condition is being analyzed before any development. Therefore, there will be an
increase in the peak rate of runoff generated by the site for a given rainfall event.
This will be mitigated with stormwater management practices.
In the planning, design and construction of the development, stormwater will be
managed to minimize or eliminate potential off-site impacts. The proper
implementation of temporary sediment and erosion control measures are used to
achieve this goal. An Erosion and Sediment Control Plan has been established and
will be implemented during construction until the completion of the project. The
Erosion and Sediment Control Plan incorporates the sequence of construction and
designed measures to be installed, operated and maintained during all aspects of each
phase. The erosion and sediment controls are designed in accordance with the NYS
Standards and Specifications for Erosion and Sediment Control.
5.0
Hydrologic Analysis
52 Upland Lane
The method used to compute project runoff was the Soil Conservation Service
TR-55. The basis for the analysis was the Type III, 24-hour storm, for the 1- year, 2-
year, 5-year, 10-year, 25-year, 50-year, 100-year storm event. The rainfall depth for
the respective storm events are 2.8, 3.4, 4.3, 5.1, 6.5, 7.8 and 9.28. The runoff
coefficient “CN” and Time of Concentration for existing and post-development
conditions were computed using Standard TR-55 criteria.
5.1
Pre-Development Condition
As stated, the proposed site consists of a new 3-bedroom house and a
proposed driveway. Therefore, these will be the areas considered as impervious
surface for the site. The remainder will continue to be forested and serve as a buffer.
This project was analyzed in its pre-developed condition in order to understand current
drainage patterns. The contributing watersheds are shown on Figure 5.1 – Pre-
Development Watershed Map.
The Drainage Basin sizes, curve numbers and travel times used in the analysis
are summarized in the Table below:
Pre-Development Conditions Watershed Analysis Variables
Drainage Basin
Area
(acres)
Curve Number
CN
Travel Time, Tc
(hrs)
5.304
0.40
5.2
Post-Development Condition
A hydrologic analysis has been done for the site to determine the expected
runoff depth for each storm event. The results of this analysis were used to calculate
the subsurface stormwater detention chamber sizes required for this parcel. The
chamber units were sized to accommodate the 100-year storm event. The contributing
watersheds are shown on Figure 5.2 – Post-Development Watershed Map.
The hydrologic analysis assumes that full soil restoration as required in Chapter
5 (Table 5.3) of SMDM will be implemented. The areas of soil restoration will be
shown on the E&SC Plan if required.
A portion of the volume of runoff generated from the watersheds analyzed is
being infiltrated into the ground. Therefore, there is no increase in the peak rate of
runoff discharge or volume up to the 100-year 24-hour rainfall for the project.
The Drainage Basin sizes, curve numbers and travel times used in the analysis
are summarized in the Table below:
Post-Development Conditions Watershed Analysis Variables
Drainage Basin
Area
(acres)
Curve Number
CN
Travel Time, Tc
(hrs)
DA-1
3.889
0.30
DA-2
1.415
0.12
52 Upland Lane
6.0
Unified Stormwater Sizing Criteria
6.1
Flood Control Criteria
The purpose of the extreme flood analysis is to prevent flood damage from
large storm events by maintaining predevelopment 100-year flood plain boundaries and
protecting the integrity of stormwater management practices. The basis of the
analysis, as per Town code, is to maintain pre-development peak rates of runoff for
the 100-year, 24-hour storm event with proper stormwater management. Detailed
criteria can be found in Chapter 196 of the Village code.
A summary of peak discharge rates at each design point for the pre and post-
developed storm events analyzed for each drainage basin is summarized in the tables
below:
Design Point 1:
Storm Event
(year)
Pre-Developed
Peak Flow
(cfs)
Post-Developed
Peak Flow
(cfs)
Net Change of
Peak Flow
(cfs)
Percent
Reduction
0.35
0.15
0.20
-57.1%
1.10
0.89
0.21
-19.1%
2.59
2.32
0.27
-10.4%
4.28
3.96
0.32
-7.5%
7.41
7.06
0.35
-4.7%
10.64
9.81
0.83
-7.8%
14.76
13.07
1.69
-11.4%
As can be seen by the results, peak discharge rates are decreased for the 100-
year storm. Slight increases for some of the storm events are shown but they are
relatively insignificant and can be attributed to rounding errors in the analysis and are
well within acceptable ranges.
See Hydrologic Analysis (Appendix F) and Subsurface Detention Chamber
Design for input values and results.
7.0
Stormwater Management Practices Selection, Justification and Design
The stormwater management practices selection process detailed in Chapters 3
and 7 of the NYS Stormwater Management Design Manual was followed to help select
the practices chosen. These Chapters provide a series of matrices which allows
logical selection of treatment practices based on several factors. The factors are as
follows:
1.
Land Use;
2.
Physical Feasibility – location, slope, drainage area, groundwater table;
3.
Watershed / Regional Factors;
4.
Stormwater Management Capability
5.
Community and Environmental Factors.
52 Upland Lane
The matrices are provided in Appendix H of this Report. The matrices have
been commented on or redacted to show elimination criteria through this stepped
approach and eventual possible alternatives for treatment.
Infiltration – (I-3) NYS DEC SMDM:
Stormwater Infiltration Practices capture and temporarily store stormwater. The
stormwater is then infiltrated into the existing soil strata over an extended period of
time allowing recharge into the groundwater.
Pre-Treatment Volume
Required
Provided
If Fc for underlying soils is less than
2.0 in/hr minimum pre-treatment
volume of 25% is required.
N/A
If Fc for underlying soil greater than
2.0 in/hour, minimum pretreatment
volume of 50% is required
50%
If Fc for underlying soil greater than
5.0 in/hour,100% of WQv must be
pretreated
100%
Exit velocities from pretreatment
volume shall be non-erosive (3.5 to
5.0 fps) during the 2-year storm
event
Exit velocities are not a concern since there
are no significant surface discharges.
Treatment Volume
Required
Provided
Infiltration
practice
designed
to
exfiltrate entire WQv through floor of
practice (side walls not included in
sizing);
All criteria have been met. The subsurface
infiltration system has been designed to
exfiltrate the entire WQv and has been sized
based solely on the surface area of the
bottom.
Installation shall carefully follow the
construction sequence.
All criteria have been met. The surface
infiltration system has been designed to
exfiltrate the entire WQv and has been sized
based solely on the surface area of the
bottom.
The surface area of the infiltration
practice shall be sized based on
All criteria have been met. The surface
infiltration system has been designed to
exfiltrate the entire WQv and has been sized
52 Upland Lane
Ap = Vw / ndt
Ap = surface area (SF)
Vw = Water Quality Volume (cf)
n = porosity (one used since open
cavity)
dt = depth of practice
based solely on the surface area of the
bottom.
Landscaping:
Does not apply.
Provided
Infiltration practice shall never serve
as a temporary sediment trap
during construction.
This Erosion and Sediment Control Plan
includes separate locations for temporary
sediment traps which do not coincide with the
practice locations.
An observation well shall be
installed in every practice and shall
have lockable cap.
The subsurface stormwater management
system will have access manholes.
Direct access shall be provided to
the practice for maintenance and
rehabilitation.
Direct access and observation will be served
by a manhole cover.
See Routing Calculations in Appendix E and G for sizing calculations.
The selection of the treatment practice was based on evaluating the site to
determine what would best fit the conditions providing maximum benefits. The goal
was to select practices which would meet treatment and attenuation standards and
minimize the disturbance footprint. The selection of Stormwater Practices was based
on the surface and subsurface conditions of the site. In addition, the site design
concept is to create a natural and environmentally sensitive setting
In General:
•
Controls should be inspected periodically for the first few months after
construction and on a semi-annual basis thereafter. They should also be
inspected after major storm events (greater than 0.5 inches).
•
All stormwater controls shall be inspected and cleaned of any debris or
sediment.
•
Any erosion shall be repaired and stabilized with seeding and mulch or
stone.
52 Upland Lane
Please note that additional notes regarding maintenance activities are contained
on the project Construction Drawings and should be adhered to during and after
construction.
The selection and justification of green practices can be found in Appendix H of
this Report. The design of the practices can be found in Appendix I of this Report.
8.0
Erosion and Sediment Control
Erosion and sediment control practices were selected and designed in
accordance with the NYSSESC. The practices proposed for this project are described
below. Standard details and specifications are included in Appendix J as well as on
the Construction Plans. Initial locations of each practice are shown on the Plans as
construction progresses it may become necessary to repair, replace or relocate these
practices as conditions warrant.
Stabilized Construction Entrance:
This has been specified for the entrance of the driveway. The installation will
occur at the beginning of the project as described in the Suggested Construction
Sequence. It will be maintained so as to prevent the tracking of sediment off-site.
Silt / Sediment Fence and Haybales:
Silt fence and haybales have been specified to control and contain sediment
from leaving areas under disturbance to undisturbed areas. The fence shall be
installed as best as possible following the contours and will be spaced in accordance
with the NYSSESC. The fence will be inspected daily, repaired, and sediment
removed as necessary.
Soil Stockpile:
Areas are provided for temporary stockpiling of delivered soil material for the
construction. These areas will be contained with sediment fence to prevent the
movement of sediment. The stockpiles, if not active for more than seven (7) days,
will be seeded and mulched. The stockpile areas were placed to best suit the
proposed construction activity. The stockpile will be installed as described in the
Construction Sequence.
Storm Drain Inlet Protection:
The inlet protection is specified to provide a permeable barrier around drainage
inlets to reduce sediment content in runoff before entering the storm drain system.
Temporary and Permanent Vegetative Cover:
This stabilization measure may be temporary and in other cases permanent
vegetative cover is used. The vegetative cover specifications are based on the
NYSSESC Manual. On the Constructions Plans are notes, locations, and
specifications as to the vegetative cover requirements. In the notes, there are specific
situations and time constraints related to stabilization of disturbed areas. The
specifications give seed and fertilizer mixes as well as placement. Any disturbed area
52 Upland Lane
expected to remain exposed for more than seven (7) days shall receive temporary
vegetative cover.
Soil Restoration:
Soil restoration is a required practice for construction projects where soil
compaction occurs to soils which will be permanently vegetated. This compaction is
typically a result of heavy vehicle traffic, cutting or filling, and areas which may receive
heavy surcharges. This becomes more pronounced in soils with greater fines content
specifically when wet. These actions can change soil properties which affect its ability
to drain or absorb surface water and will also affect the survivability of vegetation. In
order to maintain the integrity of the stormwater management plan these areas must
receive soil restoration.
This project has soils which fall in the hydrologic soil group HSG “B.”
Therefore, for most instances, soil restorations are required for the development areas
subject to permanent vegetation. Soil restoration can be done by tilling or aerating the
soil to a depth of 12-inches. In heavy traffic areas, 3-inches of compost shall be
placed over the compacted areas prior to the tilling. After the restoration, a 3/8” metal
bar should be able to be hand pushed into the soil. Areas within the drip-line of trees
should not be tilled.
Rock Outlet Protection:
Rock outlet protection is specified at discharge points of pipes and channels to
reduce depth, velocity, and the energy of water to avoid downstream erosion. Specific
usage for this project is discharge of the infiltration chambers. The sizing criteria used
is from the NYSSESC Manual.
Level Spreader:
Level spreaders have been specified in two locations to convert concentrated
flow into sheet flow. The level spreader uniformly discharges flow to prevent erosive
conditions of stabilized areas. Both level spreaders are placed after a rock outlet
protection leading to a swale. The flow spreaders will direct the flow to the
southeastern section of the site towards Upper Shad Road. The proposed level
spreaders will avoid concentrating the flow; therefore, mimicking the existing condition.
The level spreader is designed based on the criteria presented in the NYSSESC
Manual. In both cases, the level spreader is over-designed. The design flow for each
falls within the 0-10 cfs range. Prior to entering the level spreader, rock outlet
protection will be provided.
Other Controls:
Waste Disposal:
Solid, sanitary and toxic waste must be disposed of in a proper manner in
accordance with applicable local, state and federal regulations. It is prohibited to burn,
bury or pour out onto ground or into the storm sewers any solvents, paints, stains,
gasoline, diesel fuel, used motor oil, hydraulic fluid, anti-freeze, cement curing
compounds, or other toxic or hazardous wastes. The Contractor shall be responsible
for disposal of all waste off site.
Concrete Truck Washout:
52 Upland Lane
Wash out of cement trucks should occur in a designated diked area where the
washings can be collected and disposed of properly when they harden.
Dust Control:
Generation of dust shall be minimized by limiting the extent of exposed soils
and re-establishing vegetative cover in these areas as soon as possible. Additional
and/or temporary methods to minimize dust may include wetting, mulching, spray
adhesives, stone covering and wind barriers.
Stabilization:
The Contractor shall initiate stabilization measures as soon as practicable in
portions of the site where construction activities have temporarily or permanently
ceased, but in no case more than seven (7) days after the construction activity in that
portion of the site has temporarily or permanently ceased. This requirement does not
apply in the following instance:
Where the initiation of stabilization measures by the 7th day after construction activity
temporarily or permanently ceased is precluded by snow cover or frozen ground
conditions, stabilization measures shall be initiated as soon as practicable.
All areas not designated as buildings, roads, driveways, parking lots, walks, or
aprons shall be established as lawn or vegetative areas. Permanent planting and
vegetation shall be provided per approved the landscaping plan.
9.0
Construction Sequence
A key objective of the SWPPP is to reduce erosion and sedimentation
potentials for the project. As a means to accomplish this, a suggested construction
sequence was developed to assist the developer with incorporating, into the project,
various controls designed to reduce such potentials. The sequence considers the
performance of development activities in a phased approach, in conjunction with the
installation, construction and monitoring of erosion and sedimentation control devices
prior to and during construction.
Appendix D contains the project specific Suggested Construction Sequence.
Essentially, the sequence has been broken down into various activities designed to
ensure that certain erosion/sedimentation controls are in place, prior to and during
construction, in recognition of site development.
Prior to any construction activities, the Owner, Engineer and any Contactors to
perform land-disturbing activities shall meet to review this SWPPP to ensure a
thorough understanding of its contents and overall intent. Certifications to this effect
shall be signed by the Owner and Contractor. Certifications are provided on the
Construction Plans and in Appendix C.
The Responsible Party during and after Construction is as follows:
52 Upland Lane
Adee Dubray
WD Excavation & Contracting
411 Yorktown Road
Croton-on-Hudson, NY 10520
Phone: (914) 271-5726
10.0 Inspection and Reporting
Unless notified by the NYSDEC, the Owner or Operator shall have a qualified
inspector conduct site inspections in accordance with the Permit requirements; for a
site with on-going soil disturbance activities, a qualified inspector shall conduct a site
inspection at least once every seven (7) calendar days. If a project has received prior
written approval by the NYSDEC for the disturbance of greater than five (5) acres of
soils at any one time, the inspection frequency shall be increased to a minimum of
two (2) per seven (7) calendar day period separated by two (2) calendar days for as
long as the five (5) acre threshold is exceeded. The qualified inspector, as defined in
SPEDES General Permit guidelines, shall prepare an inspection report subsequent to
each and every inspection. At a minimum, the inspection report shall include and/or
address the following:
1.
Date and time of inspection.
2.
Name and title of person(s) performing inspection.
3.
A description of the weather and soil conditions (e.g. dry, wet, saturated)
at the time of inspection.
4.
A description of the condition of the runoff at all points of discharge from
the construction site. This shall include identification of any discharges
of sediment from the construction site. Include discharges from
conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland flow.
5.
A description of the condition of all natural surface waterbodies located
within, or immediately, adjacent to, the property boundaries of the
construction site which receive runoff from disturbed areas. This shall
include identification of any discharges of sediment to the surface
waterbody.
6.
Identification of all erosion and sediment control practices that need
repair or maintenance.
7.
Identification of all erosion and sediment control practice that were not
installed properly or are not functioning as designed and need to be
reinstalled or replaced.
8.
Description and sketch of areas that are disturbed at the time of the
inspection and areas that have been stabilized (temporary and/or final)
since the last inspection.
52 Upland Lane
9.
Current phase of construction of all post-construction stormwater
management practices and identification of all construction that is not in
conformance with the SWPPP and technical standards.
10.
Corrective action(s) that must be taken to install, repair, replace or
maintain erosion and sediment control practices; and to correct
deficiencies identified with the construction of the post-construction
stormwater management practices.
11.
Digital photographs, with date stamp, that clearly show the condition of
all practices that have been identified as needing correction actions. The
qualified inspector shall also take digital photographs, with date stamp,
that clearly show the condition of the practice(s) after the corrective
action has been completed.
Within one business day of the completion of an inspection, the qualified
inspector shall notify the Owner or Operator and appropriate Contractor (or
Subcontractor) of any corrective actions that need to be taken. The Contractor (or
Subcontractor) shall begin implementing the corrective action within one business day
of this notification and shall complete the corrective actions in a reasonable time
frame. All inspection reports shall be signed by the qualified inspector. A sample
inspection report is included in Appendix K.
The Owner or Operator shall maintain a record of all inspection reports in a site
log book until all disturbed areas have achieved final stabilization and the N.O.T. has
been submitted to the DEC. The site log book shall be maintained on site and be
made available to the permitting authority upon request.
Prior to filing of the Notice of Termination or the end of permit term, the Owner
or Operator shall have the qualified professional perform a final site inspection. The
qualified professional shall be provided with a certified final as-built survey. The
survey shall locate and provide detailed information for the permanent stormwater
facilities. The information provided shall include and not be limited to the following:
rim and invert elevations of all structures, outlets, weirs, etc.; pipe material and sizes;
basin dimensions, elevations and topography; and any other pertinent information
specific to the stormwater practice constructed.
Upon final review of the as-built survey and completed site improvements, the
qualified professional shall certify that the site has undergone final stabilization using
either vegetative or structural stabilization methods and that all temporary erosion and
sediment controls (such as silt fencing) not needed for long-term erosion control have
been removed.
The qualified professional shall then complete the Notice of Termination (NOT)
to be signed by the Owner. The NOT with the required supporting documentation
shall be submitted to the MS4 for signature of approval which will then be forwarded
to the NYS DEC.
52 Upland Lane
11.0 Installation and Maintenance of Stormwater Management Practices
11.1 During Construction
The Contractor shall be responsible for the installation and maintenance of all
temporary erosion control measures. The Contractor shall also be responsible for the
installation of permanent control measures. The Operator shall be responsible for the
maintenance of all permanent control measures.
All temporary erosion control measures installed on the project site shall be
observed and maintained to ensure that they are operating as intended as follows:
1.
Temporary measures will be inspected by the trained Contractor daily. Any
necessary repairs, replacements, or upgrades will be made immediately.
2.
Accumulated sediments will be removed as required to keep the measures
functional. In the case of silt fencing and haybales (if applicable), remove
deposits where accumulations reach half the height of the fence or bale. In the
case of sediment basins, remove deposits whenever their capacity has been
reduced by fifty percent (50%) from the design capacity.
3.
All erosion of the silt fence will be repaired immediately with compacted backfill
materials.
4.
Disturbed areas, stockpile areas, areas used for storage of materials that are
exposed to precipitation shall be inspected for evidence of, or the potential for,
pollutants entering the drainage system or downstream.
5.
Where discharge locations or points are accessible, they shall be inspected to
ascertain whether erosion control measures are effective in preventing significant
impacts to receiving waters.
6.
Locations where vehicles enter or exit the site shall be inspected for evidence
of off-site sediment tracking.
7.
The permanent storm drainage system shall be inspected and cleaned of all
sediment prior to completion of project.
52 Upland Lane
11.2 After Construction
The long-term operation and maintenance of the stormwater management
system will be the responsibility of the Owner. The following is the proposed
Inspection and Maintenance Schedule:
Control to be
Inspected
Inspection
Frequency
Maintenance
Threshold Criteria
Maintenance
Procedure
Drain Inlets
Quarterly
3"+ accumulated
sediment
Remove debris and
sediment annually.
Swales and
Channels
Semi-Annually
Debris and leaves
and
Sediment at 5%
Remove debris and
sediment
semi-annually
Subsurface
Infiltration
Bi-annually
Debris and leaves
and
Sediment at 5%
Remove debris and
sediment
Recommended Maintenance Access:
Subsurface Infiltration Chamber
Access through manhole cover. Pump down permanent water volume. Vacuum
sediment and debris.
Drain Inlets:
Access through grate structure and remove debris and sediment with hand tools
or vacuum truck.
In General:
•
Controls should be inspected periodically for the first few months after
construction and on a semi-annual basis thereafter. They should also be
inspected after major storm events (greater than 0.5 inches).
•
All stormwater controls shall be inspected and cleaned of any debris or
sediment.
•
Any erosion shall be repaired and stabilized with seeding and mulch or stone.
•
Maintenance and access shall comply with all local, State and Federal safety
codes and guidelines.
Please note that additional notes regarding maintenance activities are contained
on the project Construction Drawings and should be adhered to during and after
construction.
12.0 Owner / Contractor Responsibilities
12.1 Owner / Operator Certification Statement
52 Upland Lane
The ________________ is the Owner/Operator of the project for the purpose of
this Permit (see Appendix A). The Owner must sign a copy of the Owner’s
Certification Statement before construction commences (see Appendix C).
12.2 Contractor Certification Statement
The Owner is responsible for ensuring all Contractors and Subcontractors
associated with site work construction activities identified within this SWPPP agree to
implement applicable provisions of the SWPPP and sign a copy of the Contractor
Certification Statement (see Appendix C) before construction commences.
In addition, the Owner/Operator is responsible to make sure that all Contractors
and Subcontractors shall identify at least one person representing the Company at the
site will be responsible for implementation of the SWPPP. This person will be known
as the Trained Contractor and will have the required 4-hour Certification. This
Certification is available through the NYS DEC. The listing of courses can be found
at the NYS DEC Website.
12.3 Retention of Records
The Owner shall retain a copy of the most current SWPPP at the construction
site from the date construction is initiated at the site until the date of construction at
the site is completed and the N.O.T. has been filed.
Once work is completed, the Owner shall submit to the NYSDEC a Notice of
Termination (see Appendix A).
The Owner shall retain copies of the N.O.I, N.O.T., Acknowledgement Letter,
MS4 SWPPP Acceptance Form, SWPPP and all reports required by the General
Permit for a period of five (5) years from the date that the site achieves final
stabilization unless the NYSDEC specifies another time period in writing
52 Upland Lane
13.0 Conclusion
The Stormwater Management Plan has been established for this project in
accordance with the requirements of NYS DEC GP-0-20-001 and the Town Code of
Pound Ridge. This plan will effectively control stormwater generated by this project
during and after construction. The management of the stormwater is based on
controlling increases in peak runoff. The design of the stormwater management
system will accommodate storm flows up to the 100-year storm. Overall, it would
improve even the existing conditions.
The final design of the project will detail the proposed practices and will
establish the method with which they will be constructed. The detail will include
layout, grading, plantings, outlet structures, and any other component as required for
the design based on the Erosion and Sediment Control established in this Report.
These will be part of the project Construction Drawings. The Sequence of
Construction and required maintenance will also be set forth as part of the final
construction plan. The full Construction Plan shall be considered part of the
Stormwater Management Plan or Stormwater Pollution Prevention Plan.
The effectiveness of the stormwater practices selected in design will be insured
by implementing a maintenance plan. The maintenance plan details specific activities,
safeguards and provisions to be monitored and performed by specified frequencies.
By adhering to the maintenance plan, optimum performance of the stormwater
practices can be expected.
Based on the results of the analysis and recommended maintenance practices
for the collection and treatment system, the proposed stormwater control designs will
provide maximum control efficiency, high effectiveness for removal of pollutants of
concern, and the best attainable post-development pollutant loading scenario.
In conclusion, the Stormwater Management Plan will not create negative
downstream impacts as a result of this project.
Joseph C. Riina, P.E
April 7, 2022
52 Upland Lane
FIGURES
THOMAS W. HANNIGAN
Town of Cortlandt
FIG 1.1 LOCATION MAP
11/1/2021
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USGS 7.5 Minute Series Topographis Quadrangle Map(1:2,000 scale) for Cortlandt, Westchester County, New York
PROJECT LOCATION
THOMAS W. HANNIGAN
Town of Cortlandt
FIG 1.2 VICINITY MAP
11/1/2021
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USGS 7.5 Minute Series Topographis Quadrangle Map(1:2,000 scale) for Cortlandt, Westchester County, New York
PROJECT LOCATION
THOMAS W. HANNIGAN
Town of Cortlandt
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
PROJECT LOCATION
11/1/2021
Westchester County, New York
Land Planners
Civil Engineers
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
FIG 1.3 NYS OPRHP Historic Resource Map
NOTE:
1. Map Source: Cultural Resource Information System (CRIS)
FIG 4.1 SOILS MAP
11/1/2021
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USDA National Resources Conservation Service, National Cooperative Soil Survey, Web Soil Survey Map.
FIG 4.1 SOILS MAP
11/1/2021
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USDA National Resources Conservation Service, National Cooperative Soil Survey, Web Soil Survey Map.
FIG 4.1 SOILS MAP
11/1/2021
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USDA National Resources Conservation Service, National Cooperative Soil Survey, Web Soil Survey Map.
FIG 4.1 SOILS MAP
11/1/2021
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
Land Planners
Civil Engineers
COPYRIGHT © 2021 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
DATE:
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
251 F Underhill Avenue Yorktown Heights, NY 10598
NOTE:
1. Map Source: USDA National Resources Conservation Service, National Cooperative Soil Survey, Web Soil Survey Map.
S 50° 11' 25" W
50.00'
S 78° 32' 10" E
345.74'
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
N 70° 33' 00" E
225.18'
S 39° 30' 00" W
38.39'
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
S 51
S 46° 55' 05" W
100.35'
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
N 35° 08' 00" W
576.36'
N 39° 34' 40" E
32.77'
N 50° 14' 20" E
77.45'
S 77° 00' 40" E
67.06'
N 45° 00' 00" W
50.00'
S 70° 00' 00" W
52.92'
32.00'
N 78° 32' 10" W
28.21'
230.72'
54.81'
35.64'
30'
S 58° 50' 10" W
100.35'
S 63° 35
S 62° 06' 30" W
50.00'
158.89
6.5'
TOWN OF CORTLANDT
VILLAGE OF
CROTON-ON-HUDSON
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
W
DRAINAGE AREA 1
TOTAL AREA: 5.30 AC
DESIGN POINT
A
B
Tc
PREPARED FOR
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
Civil Engineers
251 F Underhill Avenue Yorktown Heights, NY 10598
Land Planners
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
FIG 5.1 PRE DEVELOPMENT CONDITION WATERSHED
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 FIGURES 4-4-22.DW
DATE: 4/7/2022
S 50° 11' 25" W
50.00'
S 78° 32' 10" E
345.74'
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
N 70° 33' 00" E
225.18'
S 39° 30' 00" W
38.39'
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
S 51
S 46° 55' 05" W
100.35'
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
N 35° 08' 00" W
576.36'
N 39° 34' 40" E
32.77'
N 50° 14' 20" E
77.45'
S 77° 00' 40" E
67.06'
N 45° 00' 00" W
50.00'
S 70° 00' 00" W
52.92'
32.00'
N 78° 32' 10" W
28.21'
230.72'
54.81'
35.64'
30'
S 58° 50' 10" W
100.35'
S 63° 35
S 62° 06' 30" W
50.00'
158.89
6.5'
TOWN OF CORTLANDT
VILLAGE OF
CROTON-ON-HUDSON
PT#6
DT#6
PT#5
DT#5
PT#4
DT#4
TP-3
IT-3
TP-4
IT-4
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
W
50'
50'
50'
50'
50'
50'
50'
50'
50'
50'
50'
50'
DRAINAGE AREA 1
TOTAL AREA: 3.89 AC
IMPERVIOUS AREA: 0.50 AC
DRAINAGE AREA 2
TOTAL AREA: 1.42 AC
IMPERVIOUS AREA: 0.0 AC
A
B
C
Tc
A
B
C
D
E
F
G
H
Tc
PREPARED FOR
www.sitedesignconsultants.com
(914) 962-4488 - Fax (914) 962-7386
Civil Engineers
251 F Underhill Avenue Yorktown Heights, NY 10598
Land Planners
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
FIG 5.1 PRE DEVELOPMENT CONDITION WATERSHED
THOMAS W. HANNIGAN
Town of Cortlandt
Westchester County, New York
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 FIGURES 4-4-22.DW
DATE: 4/5/2022
52 Upland Lane
APPENDIX A
List of Required Approvals and Applications:
Village of Croton-on-Hudson Approval – approval pending
Town of Cortlandt Approval – approval pending
Village of Croton-on-Hudson Building Permit – approval pending
Town of Cortlandt Building Permit – approval pending
52 Upland Lane
APPENDIX B
Regulatory Ordinances:
NYS DEC General Permit No. GP-0-20-001
Local Ordinance
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
1/23
A.
B.
C.
D.
E.
F.
G.
H.
Friday, November 5, 2021
Chapter 196. Stormwater, Drainage, Erosion and Water
Pollution Control
[HISTORY: Adopted by the Board of Trustees of the Village of Croton-on-Hudson 7-16-2007 by L.L.
No. 3-2007. Amendments noted where applicable.]
GENERAL REFERENCES
Environmental compliance — See Ch. 115.
Environmental quality review — See Ch. 116.
Excavation, filling and topsoil removal — See Ch. 120.
Flood damage prevention — See Ch. 129.
Professional fees — See Ch. 178.
Steep slopes — See Ch. 195.
Trees — See Ch. 208.
Wetlands — See Ch. 227.
Zoning — See Ch. 230.
Article I. Stormwater Management and Erosion and
Sediment Control
§ 196-1. Legislative findings.
It is hereby determined that:
Land development activities and associated increases in site impervious cover often alter the
hydrologic response of local watersheds and increase stormwater runoff rates and volumes,
flooding, stream channel erosion, or sediment transport and deposition.
This stormwater runoff contributes to increased quantities of water-borne pollutants, including
siltation of aquatic habitat for fish and other desirable species.
Clearing, grading, excavating, soil disturbance or placement of fill during construction tends to
increase soil erosion and add to the loss of native vegetation necessary for terrestrial and aquatic
habitat.
Improper design, maintenance and construction of stormwater management practices can
increase the velocity of stormwater runoff, thereby increasing stream bank erosion and
sedimentation.
Impervious surfaces allow less water to percolate into the soil, thereby decreasing groundwater
recharge and stream baseflow.
Substantial economic losses can result from these adverse impacts on the waters of the Village.
Stormwater runoff, soil erosion and nonpoint source pollution can be controlled and minimized
through the regulation of stormwater runoff from land development activities.
The regulation of stormwater runoff discharges from land development activities in order to control
and minimize increases in stormwater runoff rates and volumes, soil erosion, stream channel
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
2/23
I.
A.
B.
C.
D.
E.
F.
A.
B.
(1)
C.
erosion, and nonpoint source pollution associated with stormwater runoff is in the public interest
and will minimize threats to public health and safety.
Regulation of land development activities by means of performance standards governing
stormwater management and site design will produce development compatible with the natural
functions of a particular site or an entire watershed and thereby mitigate the adverse effects of
erosion and sedimentation from development.
§ 196-2. Purpose and objectives.
The purpose of this article is to establish minimum stormwater management requirements and controls
to protect and safeguard the general health, safety, and welfare of the public residing within this
jurisdiction and to address the legislative findings in § 196-1 hereof. This article seeks to meet those
purposes by achieving the following objectives:
Meet the requirements of minimum measures 4 and 5 of the SPDES General Permit for
Stormwater Discharges from Municipal Separate Stormwater Sewer Systems (MS4 SPDES No.
NYR20A370), Permit No. GP-02-02 or as amended or revised.
Require land development activities to conform to the substantive requirements of the NYS
Department of Environmental Conservation State Pollutant Discharge Elimination System
(SPDES) General Permit for Construction Activities GP-02-01 or as amended or revised.
Minimize increases in the rate of stormwater runoff from land development activities in order to
reduce flooding, siltation, increases in stream temperature, and streambank erosion and maintain
the integrity of stream channels.
Minimize increases in pollution caused by stormwater runoff from land development activities
which would otherwise degrade local water quality.
Minimize the total annual volume of stormwater runoff which flows from any specific site during
and following development to the maximum extent practicable.
Reduce stormwater runoff rates and volumes, soil erosion and nonpoint source pollution,
wherever possible, through stormwater management practices and ensure that these
management practices are properly maintained and eliminate threats to public safety.
§ 196-3. Applicability.
All land development activities, including but not limited to land development activities subject to
review and approval by the Village Board, Planning Board, Zoning Board of Appeals, or Village
Engineer of the Village under subdivision, site plan, special permit, steep slope, wetland, tree
removal permit and/or other land use or environmental permit regulations, shall be reviewed
subject to the standards contained in this article.
It shall be unlawful for any person to engage in a land development activity, other than an exempt
activity as defined in § 196-4, in the absence of a stormwater pollution prevention plan (SWPPP)
approved by the Stormwater Management Officer or other approving authority as specified in
§ 196-3C.
The Stormwater Management Officer shall accept, review and be the approving authority for all
stormwater pollution prevention plans, except as follows:
The Board of Trustees shall be the approving authority for any application involving property
that is also the subject of a pending special permit or other land use or environmental permit
application before that Board in accordance with the provisions of the Village Code.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
3/23
(2)
(3)
(1)
(2)
(3)
D.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
The Planning Board shall be the approving authority for any application involving property that
is also the subject of a pending site plan, subdivision, special permit, steep slope, wetland,
tree removal or other land use or environmental permit application before that Board in
accordance with the provisions of the Village Code.
The Zoning Board of Appeals shall be the approving authority for any application involving
property that is also the subject of a pending special permit or other land use or
environmental permit application before that Board in accordance with the provisions of the
Village Code.
The approving authority may:
Review the plans;
Upon approval by the Village Board, engage the services of a registered professional
engineer to review the plans, specifications and related documents at a cost not to exceed a
fee schedule established by said governing board; or
Accept the certification of a licensed professional that the plans conform to the requirements
of this article.
§ 196-4. Exemptions.
The following activities shall be exempt from review under this article:
Agricultural activity as defined in this article.
Silvicultural activity, except that landing areas and log haul roads are subject to this article.
Repairs and routine property maintenance activities that disturb less than 5,000 square feet and
maintain the original line and grade.
Repairs and routine maintenance to any stormwater management practice or facility deemed
necessary by the Stormwater Management Officer.
Land development activities for which a building permit has been approved and is still in effect on
or before the effective date of this article.
Cemetery graves.
Installation of a fence, sign, telephone, and electric poles and other kinds of posts or poles.
Emergency activity immediately necessary to protect life, property or natural resources.
Activities of an individual engaging in home gardening by growing flowers, vegetables and other
plants primarily for use by that person and his or her family.
Landscaping and horticultural activities that disturb less than 5,000 square feet in connection with
an existing noncommercial structure.
§ 196-5. Definitions.
Whenever used in this article, the following terms will have meanings set forth below:
AGRICULTURAL ACTIVITY
The activity of an active farm, including grazing and watering livestock, irrigating crops, harvesting
crops, using land for growing agricultural products, and cutting timber for sale, but shall not include
the operation of a dude ranch or similar operation, or the construction of new structures
associated with agricultural activities.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
4/23
APPLICANT
Any individual or individuals, firm, partnership, association, corporation, company, organization or
other legal entity of any kind, including municipal corporations, governmental agencies or
subdivisions thereof, filing an application for a land development activity or minor land disturbance
activity subject to the provisions of this article.
The term "building" as defined in § 230-4 of the Village Code now or as hereafter amended.
CHANNEL
A natural or artificial watercourse with a definite bed and banks that conducts continuously or
periodically flowing water.
CLEARING
Any activity that removes the vegetative surface cover.
DEDICATION
The deliberate appropriation of property by its owner for general public use.
DEPARTMENT or NYSDEC
The New York State Department of Environmental Conservation.
DESIGN MANUAL
The New York State Stormwater Management Design Manual, most recent version, including
applicable updates, that serves as the official guide for stormwater management principles,
methods and practices.
DEVELOPER
A person who undertakes land development activities.
EROSION CONTROL MANUAL
The most recent version of the New York Standards and Specifications for Erosion and Sediment
Control Manual, commonly known as the "Blue Book."
GRADING
Excavation or fill of material, including the resulting conditions therefrom.
IMPERVIOUS COVER
Those surfaces, improvements and structures that cannot effectively infiltrate rainfall, snow melt
and water (e.g., building rooftops, pavement, sidewalks, driveways, etc.).
INDUSTRIAL STORMWATER PERMIT
A State Pollutant Discharge Elimination System permit issued to a commercial industry or group of
industries which regulates the pollutant levels associated with industrial stormwater discharges or
specifies on-site pollution control strategies.
INFILTRATION
The process of percolating stormwater into the subsoil.
LAND DEVELOPMENT ACTIVITY
Any construction activity including clearing, grubbing, grading, excavating, soil disturbance or
placement of fill that results in land disturbance of equal to or greater than 5,000 square feet in
area.
LANDOWNER
The legal or beneficial owner of land, including those holding the right to purchase or lease the
land, or any other person holding proprietary rights in the land.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
5/23
MAINTENANCE AGREEMENT
A legally recorded document that acts as a property deed restriction, and which provides for long-
term maintenance of stormwater management practices.
NONPOINT SOURCE POLLUTION
Pollution from any source other than from any discernible, confined, and discrete conveyances,
and shall include, but not be limited to, pollutants from agricultural, silvicultural, mining,
construction, subsurface disposal and urban runoff sources.
PERSON
Any individual or individuals, firm, partnership, association, corporation, company, organization or
other legal entity of any kind, including municipal corporations, governmental agencies or
subdivisions thereof.
PHASING
Clearing a parcel of land in distinct pieces or parts, with the stabilization of each piece completed
before the clearing of the next.
POLLUTANT OF CONCERN
Sediment or a water quality measurement that addresses sediment (such as total suspended
solids, turbidity or siltation) and any other pollutant that has been identified as a cause of
impairment of any water body that will receive a discharge from the land development activity.
PROJECT
Land development activity or minor land disturbance activity as those terms are defined and/or
used in this article.
RAINFALL DRAINAGE CHANNELS
Those existing interconnected networks of depressed contours and enlargements thereto which,
by virtue of their location, convey surface water runoff from its source to its ultimate points of
discharge.
RECHARGE
The replenishment of underground water reserves.
SEDIMENT CONTROL
Measures that prevent eroded sediment from leaving the site.
SILVICULTURAL
Of or relating to the management and care of forests.
SPDES GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES GP-02-01
A permit under the New York State Pollutant Discharge Elimination System (SPDES) issued to
developers of construction activities to regulate disturbance of one or more acres of land.
SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM MUNICIPAL SEPARATE
STORMWATER SEWER SYSTEMS GP-02-02
A permit under the New York State Pollutant Discharge Elimination System (SPDES) issued to
municipalities to regulate discharges from municipal separate storm sewers for compliance with
EPA-established water quality standards and/or to specify stormwater control standards.
STABILIZATION
The use of practices that prevent exposed soil from eroding.
STOP-WORK ORDER
An order issued by the duly authorized municipal authority which requires that all land
development activity and other construction activity on a site be stopped.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
6/23
A.
STORMWATER
Rainwater, surface runoff, snowmelt and drainage.
The use of structural or nonstructural practices that are designed to reduce stormwater runoff and
mitigate its adverse impacts on property, natural resources and the environment.
STORMWATER MANAGEMENT FACILITY
One or a series of stormwater management practices installed, stabilized and operating for the
purpose of controlling stormwater runoff.
STORMWATER MANAGEMENT OFFICER (SMO)
The Village Engineer and his or her designees, and/or such other Village officers or employees as
designated by the Village Manager.
STORMWATER MANAGEMENT PRACTICES (SMP)
Measures, either structural or nonstructural, that are determined to be the most effective, practical
means of preventing flood damage and preventing or reducing point source or nonpoint source
pollution inputs to stormwater runoff and water bodies.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
A plan for controlling stormwater runoff and pollutants from a site during and after construction
activities.
STORMWATER RUNOFF
Flow on the surface of the ground, resulting from precipitation.
SURFACE WATERS OF THE STATE OF NEW YORK
Lakes, bays, sounds, ponds, impounding reservoirs, springs, wells, rivers, streams, creeks,
estuaries, marshes, inlets, canals, the Atlantic Ocean within the territorial seas of the State of New
York and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
public or private (except those private waters that do not combine or effect a junction with natural
surface or underground waters), which are wholly or partially within or bordering the state or within
its jurisdiction. Storm sewers and waste treatment systems, including treatment ponds or lagoons
which also meet the criteria of this definition, are not waters of the state. This exclusion applies
only to man-made bodies of water which neither were originally created in waters of the state
(such as a disposal area in wetlands) nor resulted from impoundment of waters of the state.
VILLAGE
The Village of Croton-on-Hudson, New York.
VILLAGE ENGINEER
The person employed as a Village Engineer of the Village of Croton-on-Hudson, or his or her
designee.
WATERCOURSE
The term "watercourse" as defined in § 227-3 of the Village Code now or as hereafter amended.
WETLAND
The term "wetland" as defined in § 227-3 of the Village Code now or as hereafter amended.
§ 196-6. Stormwater pollution prevention plans.
No application for approval of a land development activity shall be reviewed until the appropriate
approving authority has received a stormwater pollution prevention plan (SWPPP) prepared in
accordance with the requirements of this article.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
7/23
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
B. All SWPPPs shall provide the following background information, erosion and sediment control,
and stormwater management measures relating to stormwater quantity:
Background information about the scope of the project, including location, type and size of
project.
Site map/construction drawing(s) for the project, including a general location map. At a
minimum, the site map shall show the total site area; all improvements; areas of disturbance;
areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface
water(s); wetlands and drainage patterns that could be affected by the construction activity;
existing and final slopes; locations of off-site material, waste, borrow or equipment storage
areas; and location(s) of the stormwater discharge(s). The site map shall be at a scale no
smaller than one inch equals 50 feet.
Description of the soil(s) present at the site and soil test results, if requested.
Construction phasing plan describing the intended sequence of construction activities,
including clearing and grubbing, excavation and grading, utility and infrastructure installation
and any other activity at the site that results in soil disturbance. Not more than two acres shall
be disturbed at any one time; provided, however, the approval authority may opt to increase
the amount of land that may be exposed at any one time pursuant to an approved SWPPP.
Description of the pollution prevention measures that will be used to control construction
materials, chemicals and debris from becoming a pollutant source in stormwater runoff.
Description of construction and waste materials expected to be stored on-site with updates as
appropriate, and a description of controls to reduce pollutants from these materials, including
storage practices to minimize exposure of the materials to stormwater, and spill-prevention
and response.
Temporary and permanent structural and vegetative measures to be used for soil stabilization,
runoff control and sediment control for each stage of the project from initial land clearing and
grubbing to project close-out.
A site map/construction drawing(s) specifying the location(s), size(s) and length(s) of each
erosion and sediment control practice.
Dimensions, material specifications and installation details for all erosion and sediment
control practices, including the siting and sizing of any temporary sediment basins.
Temporary practices that will be converted to permanent control measures.
Implementation schedule for staging temporary erosion and sediment control practices,
including the timing of initial placement and duration that each practice will remain in place
until the site is stabilized.
Maintenance schedule to ensure continuous and effective operation of the erosion and
sediment control practice.
Name(s) of the receiving water(s) and NYSDEC classification(s), if applicable.
Delineation of SWPPP implementation responsibilities for each part of the site.
Description of structural practices designed to divert flows from exposed soils, store flows, or
otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the
degree attainable.
Any existing data that describes the stormwater runoff at the site.
An acknowledgement by the landowner granting to the Village and other agencies having
jurisdiction the right to enter the property at reasonable times and in a reasonable manner for
the purpose of inspection.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
8/23
(18)
(19)
(20)
(21)
(22)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
C.
D.
E.
F.
Description of each postconstruction stormwater management practice, including but not
limited
to
dimensions,
material
specifications,
and
installation
details
for
each
postconstruction stormwater management practice.
Site map/construction drawing(s) showing the specific location(s) and size(s) of each
postconstruction stormwater management practice.
Hydrologic and hydraulic analysis for all structural components of the stormwater
management system for the applicable design storms, as per the manual specified in § 196-
8A(1) herein.
Comparison of postdevelopment stormwater runoff conditions with pre-development
conditions.
Maintenance schedule to ensure continuous and effective operation of each postconstruction
stormwater management practice.
In addition to the information requirements of § 196-6B, SWPPPs for land development activities
disturbing one or more acres, whether or not these land development activities involve discharging
a pollutant of concern to either an impaired water identified on the Department's 303(d) list of
impaired waters or a total maximum daily load (TMDL) designated watershed for which pollutants
in stormwater have been identified as a source of the impairment, must provide the following water
quality controls (poststormwater construction controls):
Description of each postconstruction stormwater management quality practice.
Site map/construction drawing(s) showing the specific location(s) and size(s) of each
postconstruction stormwater management quality practice.
Hydrologic and hydraulic analysis for all structural components of the stormwater
management quality system for the applicable design storms, as per the manual specified in
§ 196-8A(1) herein.
Dimensions, material specifications and installation details for each postconstruction
stormwater management quality practice.
Maintenance schedule to ensure continuous and effective operation of each postconstruction
stormwater management quality practice.
Maintenance easement(s), where required, to ensure access to all stormwater management
practices at the site for the purpose of inspection and repair. Easements shall be recorded
and shall remain in effect with transfer of title to the property.
Inspection and maintenance agreement recorded and binding on all subsequent landowners
served by the on-site stormwater management measures in accordance with § 196-9 of this
article.
The SWPPP shall be prepared by a landscape architect, certified professional in erosion and
sediment control, professional engineer, or other professional(s) deemed acceptable by the
NYSDEC and must be signed by the professional preparing the plan, who shall certify that the
design of all stormwater management practices meets the requirements in this article.
The applicant shall assure that all other applicable environmental permits have been or will be
acquired for the land development activity prior to approval of the final stormwater design plan.
Each contractor and subcontractor identified in the SWPPP and/or any successor or substitute
contractor or subcontractor who will be involved in soil disturbance and/or stormwater
management practice installation shall sign and date a copy of the following certification statement
before undertaking any land development activity: "I certify under penalty of law that I understand
and agree to comply with the terms and conditions of the stormwater pollution prevention plan. I
also understand that it is unlawful for any person to cause or contribute to a violation of water
quality standards." Copies of these statements shall be delivered to the SMO.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
9/23
(1)
(2)
(3)
G.
A.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
B.
The certification must include the name and title of the person providing the signature,
address and telephone number of the contracting firm; the address (or other identifying
description) of the site; and the date the certification is made.
The certification statement(s) shall become part of the SWPPP for the land development
activity.
The certification shall contain proof that each contractor who will be involved in a land
development activity has obtained training and/or certification in proper erosion and
sedimentation control practices. Such certification shall become part of the SWPPP for the
land development activity and shall be retained on-site.
A copy of the SWPPP shall be retained at the site of the land development activity during
construction from the date of initiation of construction activities to the date of final stabilization.
§ 196-7. Stormwater management and erosion and sediment
control for minor land disturbance activities.
All activities which require a building, land use or environmental permit and involve 400 square
feet or more of land disturbance but which do not meet the defined size threshold in § 196-5,
Definitions, for a land development activity, or any disturbance within 20 feet of a rainfall drainage
channel, are subject to the review and approval of the Stormwater Management Officer.
An application for approval of such a minor land disturbance activity, as specified in Subsection A
above, shall include, except as may be waived by the SMO, the following background information,
erosion and sediment controls, and stormwater management practices. Such activity is subject to
the performance and design criteria in § 196-8A herein, and the application shall show that there
will be no net increase in the rate of runoff resulting from the project for the ten-year storm event.
Background information about the scope of the project, including location, type and size of
project.
Site map/construction drawing(s) for the project, including a general location map. At a
minimum, the site map shall show the total site area; all improvements; areas of disturbance;
areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface
water(s); wetlands and drainage patterns that could be affected by the construction activity;
existing and final slopes; locations of off-site material, waste, borrow or equipment storage
areas; and location(s) of the stormwater discharge(s). The site map shall be at a scale no
smaller than one inch equals 50 feet.
Description of the soil(s) present at the site and soil test results, if requested.
Construction phasing plan describing the intended sequence of construction activities,
including clearing and grubbing, excavation and grading, utility and infrastructure installation
and any other activity at the site that results in soil disturbance.
Temporary and permanent structural and vegetative measures to be used for soil stabilization,
runoff control and sediment control for the project from initial land clearing and grubbing to
project close-out.
A site map/construction drawing(s) specifying the location(s), size(s) and length(s) of each
erosion and sediment control practice.
Dimensions, material specifications and installation details for all erosion and sediment
control practices.
Implementation schedule for staging temporary erosion and sediment control practices,
including the timing of initial placement and duration that each practice will remain in place
until the site is stabilized.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
10/23
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(1)
(2)
A.
B.
C.
Maintenance schedule to ensure continuous and effective operation of the erosion and
sediment control practice.
Name(s) of the receiving water(s) and NYSDEC classification(s), if applicable.
Any existing data that describes the stormwater runoff at the site.
An acknowledgement by the landowner granting to the Village and other agencies having
jurisdiction the right to enter the property at reasonable times and in a reasonable manner for
the purpose of inspection.
Description of each postconstruction stormwater management practice, including but not
limited to dimensions, material specifications and installation details for each postconstruction
stormwater management practice.
Site map/construction drawing(s) showing the specific location(s) and size(s) of each
postconstruction stormwater management practice.
Hydrologic and hydraulic analysis for all structural components of the stormwater
management system for the applicable design storm.
Comparison of post-development stormwater runoff conditions with predevelopment
conditions.
§ 196-8. Performance and design criteria for stormwater
management and erosion and sediment control.
All land development activities shall be subject to the following performance and design criteria:
For the purpose of this article, the following documents shall serve as the official guides and
specifications for stormwater management. Stormwater management practices that are designed
and constructed in accordance with these technical documents shall be presumed to meet the
standards imposed by this article chapter. Copies of the two manuals are on file in the office of the
Stormwater Management Officer. (NOTE: The New York State technical guidance documents may
be ordered from The Department. An order form as well as downloadable versions of the Manuals
are
available
on
the
Internet
at:
http://www.dec.state.ny.us/website/dow/toolbox/escstandards/index.html
or
http://www.dos.state.ny.us/lgss/stormwaterpub/index.html.)
The New York State Stormwater Management Design Manual (New York State Department of
Environmental Conservation, most recent version including applicable updates or its
successors, hereafter referred to as the "Design Manual").
New York Standards and Specifications for Erosion and Sediment Control (Empire State
Chapter of the Soil and Water Conservation Society, 2005, most recent version, including
applicable updates, or its successors, hereafter referred to as the "Erosion Control Manual").
Where stormwater management practices are not in accordance with technical standards, the
owner, applicant or developer must demonstrate equivalence to the technical standards as set
forth in § 196-8, and the SWPPP shall be prepared by a certified professional in erosion and
sediment control, professional engineer or other professional(s) deemed acceptable by the
NYSDEC.
No land development activity shall cause an increase in turbidity that will result in substantial
visible contrast to natural conditions in surface waters of the State of New York.
§ 196-9. Maintenance, inspection and repair of stormwater
facilities.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
11/23
A.
B.
C.
(1)
(2)
(3)
(4)
D.
E.
A.
The owner, applicant or developer of the land development activity shall at all times properly
operate and maintain all facilities and systems of treatment and control (and related
appurtenances) which are installed or used by the owner, applicant or developer to achieve
compliance with the conditions of this article. Sediment shall be removed from sediment traps or
sediment ponds whenever their design capacity has been reduced by 50%, and placed in an
acceptable location and properly stabilized.
The owner, applicant, developer or its representative shall be on site at all times when
construction or grading activity takes place and shall maintain the effectiveness of all erosion and
sediment control practices. Inspections shall be conducted and inspection reports shall be
completed by a landscape architect, certified professional in erosion and sediment control,
professional engineer or other professional(s) deemed acceptable by the NYSDEC every seven
days and within 24 hours of any storm event producing 0.5 inch of precipitation or more. The
reports shall be maintained in a site log book and transmitted to the SMO within two business
days of the date of the inspection.
Prior to the issuance of any approval that has a permanent stormwater management facility as
one of the requirements, other than one serving an individual single-family residence, the owner,
applicant or developer must execute an easement that shall be binding on all subsequent
landowners served by the permanent stormwater management facility. The easement shall be in a
form acceptable to the Village Attorney and shall provide for access to the facility at reasonable
times for periodic inspection by the Village to ensure that the facility is maintained in proper
working condition to meet design standards and any other provisions established by this article.
The easement shall be recorded by the grantor in the office of the County Clerk after approval by
the Village Attorney.
The owner or operator of permanent stormwater management practices installed in accordance
with this article shall operate and maintain the stormwater management practices to achieve the
goals of this article. Proper operation and maintenance also includes, as a minimum, the following:
A preventive/corrective maintenance program for all facilities and systems of treatment and
control (or related appurtenances) which are installed or used by the owner or operator to
achieve the goals of this article.
Written procedures for operation and maintenance and training new maintenance personnel.
Discharges from the SMPs shall not exceed design criteria or cause or contribute to water
quality standard violations in accordance with § 196-8C.
If required by the SMO, an annual report shall be submitted to the SMO within 30 calendar
days of the end of the calendar year.
Prior to the issuance of any final plan approval, the owner, applicant or developer must execute a
formal maintenance agreement for permanent stormwater management facilities, other than those
serving an individual single-family residence, binding on all subsequent landowners. The
maintenance agreement shall be in a form acceptable to the Village Attorney and shall be
recorded in the office of the County Clerk as a deed restriction on the property. The Village of
Croton-on-Hudson, in lieu of a maintenance agreement, at its sole discretion may accept
dedication of any existing or future permanent stormwater management facility, provided such
facility meets all the requirements of this article and includes adequate and perpetual access and
sufficient area, by easement or otherwise, for inspection and regular maintenance.
§ 196-10. Construction inspection, administration and
maintenance.
The Stormwater Management Officer may require such inspections as are necessary to determine
compliance with this article and may either approve that portion of the work completed or notify the
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
12/23
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(1)
(2)
B.
C.
D.
applicant wherein the work fails to comply with the requirements of this article and the stormwater
pollution prevention plan (SWPPP) as approved.
To obtain inspections, the applicant shall notify Village enforcement officials at least 48 hours
before any of the following as required by the Stormwater Management Officer:
Start of construction;
Installation of sediment and erosion control measures;
Completion of site clearing;
Completion of rough grading;
Installation of constructed stormwater improvements;
Completion of final grading;
Close of the construction season;
Completion of final landscaping; and
Successful establishment of landscaping in public areas.
If any violations are found, the owner, applicant and/or developer shall be notified in writing of
the nature of the violation and the required corrective actions. No further work shall be
conducted except for site stabilization until any violations are corrected and all work
previously completed has received approval by the Stormwater Management Officer.
It shall be the primary responsibility of the property owner(s) and the successor property owner(s)
to perform all necessary inspections, maintenance, report submissions, adjustments, repair,
replacement and reconstruction of the stormwater management facilities. Required inspections
shall be conducted and reports prepared by a certified professional in erosion and sediment
control, a professional engineer or other professional(s) deemed acceptable by the NYSDEC. If, at
any time, the Stormwater Management Officer determines that necessary inspections, reports,
maintenance, repairs, adjustments, replacements or reconstructions have not been properly
performed, notice of such determination shall be given to the property owner(s) of the property or
properties upon which the stormwater facility or facilities are situated and shall provide a
reasonable period under the circumstances to cure such improper performance. If the property
owner(s) fails to timely correct any and all deficiencies as provided in the notice, the Village may
undertake to perform any such work or work that it finds, in its sole judgment, as necessary to
preserve the stormwater management functions or stormwater management practices (SMPs), at
the cost and expense of the property owner(s) and the successor property owner(s). Copies of all
bills, statements and invoices substantiating such costs, including costs of consultants, shall be
included with written notice of same. In the event that all such costs and expenses are not paid
within 30 days of issuance of statements for this work, the total cost of such work shall constitute a
lien against the property or properties upon which the stormwater management facilities are
situated, which shall be levied and collected in the same manner as Village real estate taxes or in
such manner otherwise provided by law. The property owner(s) and the successor property
owner(s) shall be personally liable for the payment of all such costs, including costs of collection
and reasonable attorney's fees. Where multiple lots are involved, each lot shall individually and
separately bear its equal share of such costs.
Except for activities regulated under § 196-7 herein, all applicants are required to submit "as built"
plans for any stormwater management practices located on-site after final construction is
completed. The plan must show the final design specifications for all stormwater management
facilities and must be certified by a New York State licensed land surveyor or professional
engineer.
Inspection programs may be established on any reasonable basis, including, but not limited to:
routine inspections; random inspections; inspections based upon complaints or other notice of
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
13/23
E.
F.
A.
B.
C.
(1)
(2)
A.
possible violations; inspection of drainage basins or areas identified as higher than typical sources
of sediment or other contaminants or pollutants; inspections of businesses or industries of a type
associated with higher than usual discharges of contaminants or pollutants or with discharges of a
type which are more likely than the typical discharge to cause violations of state or federal water
or sediment quality standards or the SPDES stormwater permit; and joint inspections with other
agencies inspecting under environmental or safety laws. Inspections may include, but are not
limited to: reviewing maintenance and repair records; sampling discharges, surface water,
groundwater, and material or water in drainage control facilities; and evaluating the condition of
drainage control facilities and other stormwater management practices.
The Stormwater Management Officer may require monitoring and reporting from entities subject to
this article as are necessary to determine compliance with this article.
When any new stormwater management facility is installed on private property or when any new
connection is made between private property and the public stormwater system, the landowner
shall grant to the Village and other agencies having jurisdiction the right to enter the property at
reasonable times and in a reasonable manner for the purpose of inspection.
§ 196-11. Performance guarantee.
In order to ensure the full and faithful completion of all land development activities related to
compliance with all conditions set forth by the Village in its approval of the stormwater pollution
prevention plan, the Village may require the owner, applicant or developer to provide, prior to
construction, a performance bond, cash escrow, or irrevocable letter of credit from an appropriate
financial or surety institution which guarantees satisfactory completion of the project and names
the Village as the beneficiary. The security shall be in an amount to be determined by the Village
based on submission of final design plans, with reference to actual construction and landscaping
costs. The performance guarantee shall remain in force until the surety is released from liability by
the Village, provided that such period shall not be less than one year from the date of final
acceptance or such other certification that the facility(ies) has been constructed in accordance
with the approved plans and specifications and that a one-year inspection has been conducted
and the facilities have been found to be acceptable to the Village. Per-annum interest on cash
escrow deposits shall be reinvested in the account until the surety is released from liability.
Where stormwater management and erosion and sediment control facilities are to be operated
and maintained by the developer or by a corporation that owns or manages a commercial or
industrial facility, the developer, prior to construction, may be required to provide the Village with
an irrevocable letter of credit from an approved financial institution or surety to ensure proper
operation and maintenance of all stormwater management and erosion control facilities both
during and after construction based upon the advice of the SMO. If the developer or landowner
fails to properly operate and maintain stormwater management and erosion and sediment control
facilities, the Village may draw upon the account to cover the costs of proper operation and
maintenance, including engineering and inspection costs.
Entities subject to this article shall maintain records demonstrating compliance with this article.
§ 196-12. Enforcement; penalties for offenses.
When the SMO determines that a land development activity is not being carried out in accordance
with any requirement of this article, or that any provision of this article is not being complied with,
the SMO may issue a written notice of violation to the landowner, applicant, contractor and/or
developer. The notice of violation shall contain:
The name and address of the landowner, contractor, developer or applicant;
The address, when available, or a description of the building, structure or land upon which the
violation is occurring;
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
14/23
(3)
(4)
(5)
B.
C.
D.
E.
F.
G.
H.
A statement specifying the nature of the violation;
A description of the remedial measures necessary to cure the violation and a time schedule
for the completion of such remedial action; and
A statement of the penalty or penalties that shall or may be assessed against the person to
whom the notice of violation is directed.
If the notice of violation is not complied with within the time provided in the notice, the SMO may
request the Village Attorney to institute the appropriate proceedings at law or in equity to
prosecute, restrain, correct or abate such violation and for other attendant remedial measures.
The SMO may issue a stop-work order for violations of this article. Persons receiving a stop-work
order shall be required to halt all land development activities and other construction activities on
the site, except those activities, approved by the SMO, that address the violations leading to the
stop-work order. The stop-work order shall be in effect until the SMO confirms that the violation
has been satisfactorily addressed. Failure to address a stop-work order in a timely manner may
result in civil, criminal, or monetary penalties in accordance with the enforcement measures
authorized in this article.
Issuance of a stop-work order by the SMO shall be as provided in Chapter 86 of the Village Code.
A stop-work order may be appealed by filing a written notice of appeal with the Planning Board not
later than 30 days after service of the stop-work order upon the applicant. A hearing shall be
scheduled by the Planning Board within 20 days of receipt of request for a hearing. After the close
of the hearing, the Planning Board may confirm, modify or cancel the stop-work order.
Any violation of this article may be restrained by injunction or otherwise abated in a manner
provided by this article.
Any person who violates the provisions of this article shall be guilty of an offense punishable by a
fine not less than $500 nor more than $1,000 or imprisonment for a period not to exceed six
months, or both, for conviction of a first offense; for conviction of a second offense, both of which
were committed within a period of five years, punishable by a fine not less than $1,000 nor more
than $1,500 or imprisonment for a period not to exceed six months, or both; and upon conviction
for a third or subsequent offense, all of which were committed within a period of five years,
punishable by a fine not less than $1,500 nor more than $2,000 or imprisonment for a period not
to exceed six months, or both. However, for the purposes of conferring jurisdiction upon courts
and judicial officers generally, violations of this article shall be deemed misdemeanors, and for
such purpose only all provisions of law relating to misdemeanors shall apply to such violations.
Each week's continued violation shall constitute a separate additional violation.
In addition to any penalty provided herein or by law, any person in violation of this article may be
required to restore land to its undisturbed condition and/or mitigate on-site and off-site damage
from stormwater runoff, sediment or pollutants resulting from the violator's activities. In the event
that restoration is not undertaken within a reasonable time after notice, the SMO may take
necessary corrective action, the cost of which shall become a lien upon the property until paid.
Under exigent circumstances, if any building or land development activity, minor land disturbance
activity or permanent stormwater management facility is installed, conducted or operated in
violation of this article, the Stormwater Management Officer may prevent the occupancy of said
building or land, including the withholding of a certificate of occupancy. It shall be the obligation of
the property owner to remediate the violation, at which time the Stormwater Management Officer
shall further consider allowing occupancy of the building or land.
§ 196-13. Fees for services.
Application fees established by resolution of the Village Board of Trustees shall be submitted with the
application. In addition, in accordance with the provisions of Chapter 178 of the Village Code, any
person undertaking land development activities regulated by this article shall reimburse the Village for
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
15/23
A.
(1)
(2)
(3)
(4)
(5)
B.
the cost of professional services incurred by the Village for the review of SWPPPs and for the
performance of inspections and/or maintenance activities as provided in this article. The Village may
establish escrow accounts for these purposes as provided in Chapter 178 of the Village Code.
Article II. Illegal Discharges and Illicit Connections to
Separate Storm Sewer System
§ 196-14. Purpose and objectives.
The purpose of this article is to provide for the health, safety, and general welfare of the citizens of
the Village of Croton-on-Hudson through the regulation of nonstormwater discharges to the
municipal separate storm sewer system (MS4) to the maximum extent practicable as required by
federal and state law. This article establishes methods for controlling the introduction of pollutants
or excess flow into the MS4 in order to comply with requirements of the SPDES General Permit for
Municipal Separate Storm Sewer Systems.
The objectives of this article are:
To meet the requirements of the SPDES General Permit for Stormwater Discharges from
MS4s, Permit No. GP-02-02 or as amended or revised;
To regulate the contribution of pollutants to the MS4 since such systems are not designed to
accept, process or discharge nonstormwater wastes;
To prohibit illegal discharges and illicit connections to the MS4;
To establish legal authority to carry out all inspection, surveillance and monitoring procedures
necessary to ensure compliance with this article; and
To promote public awareness of the adverse environmental impacts involved in the improper
discharge of trash, yard waste, lawn chemicals, pet waste, wastewater, grease, oil, petroleum
products, cleaning products, paint products, hazardous waste, sediment and other pollutants
into the MS4.
§ 196-15. Definitions.
Whenever used in this article, the following terms will have meanings set forth below:
BEST MANAGEMENT PRACTICES (BMPs)
Schedules of activities, prohibitions of practices, general good housekeeping practices, pollution
prevention and educational practices, maintenance procedures, and other management practices
to prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving
waters, or stormwater conveyance systems. BMPs also include treatment practices, operating
procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or
drainage from raw materials storage.
CLEAN WATER ACT
The Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent
amendments thereto.
DESIGN PROFESSIONAL
A New York State licensed professional engineer or architect.
EPA
The United States Environmental Protection Agency.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
16/23
A.
B.
A.
B.
C.
D.
HAZARDOUS MATERIALS
Any material, including any substance, waste, or combination thereof, which because of its
quantity, concentration, or physical, chemical, or infectious characteristics may cause, or
significantly contribute to, a substantial present or potential hazard to human health, safety,
property, or the environment when improperly treated, stored, transported, disposed of, or
otherwise managed.
ILLEGAL DISCHARGE
Any direct or indirect nonstormwater discharge to the MS4, except as exempted in § 196-18A of
this article.
ILLICIT CONNECTIONS
Any drain or conveyance, whether on the surface or subsurface, which allows an illegal discharge
to enter the MS4, including, but not limited to:
Any conveyances which allow any nonstormwater discharge, including but not limited to
treated or untreated sewage, process wastewater, and wash water, to enter the MS4 and any
connections to the storm drain system from indoor drains and sinks, regardless of whether
said drain or connection had been previously allowed, permitted or approved by an authorized
enforcement agency; or
Any drain or conveyance connected from a commercial or industrial land use to the MS4
which has not been documented in plans, maps or equivalent records and approved by an
authorized enforcement agency.
INDIVIDUAL SEWAGE TREATMENT SYSTEM
A facility serving one or more parcels of land or residential households, or a private, commercial or
institutional facility, that treats sewage or other liquid wastes for discharge into the groundwaters of
New York State, except where a permit for such a facility is required under the applicable
provisions of Article 17 of the Environmental Conservation Law.
MS4
The Municipal separate storm sewer system.
MUNICIPAL SEPARATE STORM SEWER SYSTEM
A conveyance or system of conveyances (including roads with drainage systems, municipal
streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains):
Owned or operated by the Village of Croton-on-Hudson;
Designed or used for collecting or conveying stormwater;
Which is not a combined sewer; and
Which is not part of a publicly owned treatment works (POTW) as defined at 40 CFR 122.2.
NONSTORMWATER DISCHARGE
Any discharge to the MS4 that is not composed entirely of stormwater.
NYSDEC
The New York State Department of Environmental Conservation.
PERSON
Any individual or individuals, firm, partnership, association, corporation, company, organization or
other legal entity of any kind, including municipal corporations, governmental agencies or
subdivisions thereof.
POLLUTANT
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
17/23
A.
B.
C.
D.
Dredged spoil, filter backwash, solid waste, incinerator residue, treated or untreated sewage,
garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials,
heat, wrecked or discarded equipment, rock, sand and industrial, municipal, agricultural waste and
ballast discharged into water, which may cause or might reasonably be expected to cause
pollution of the waters of the state in contravention of the standards.
POLLUTANT OF CONCERN
Sediment or a water quality measurement that addresses sediment (such as total suspended
solids, turbidity or siltation) and any other pollutant that has been identified as a cause of
impairment of any water body that will receive a discharge from the land development activity.
PREMISES
Any building, lot, parcel of land, or portion of land, whether improved or unimproved, including
adjacent sidewalks and parking strips.
SPECIAL CONDITIONS
DISCHARGE COMPLIANCE WITH WATER QUALITY STANDARDS
The condition that applies where the Village has been notified by the NYSDEC that the
discharge of stormwater authorized under its MS4 permit may have caused or has the
reasonable potential to cause or contribute to the violation of an applicable water quality
standard. Under this condition, the Village must take all necessary actions to ensure future
discharges do not cause or contribute to a violation of water quality standards.
LISTED WATERS
TERS — The condition in the Village's MS4 permit that applies where the MS4 discharges to
a 303(d) listed water. Under this condition, the stormwater management program must ensure
no increase of the listed pollutant of concern to the 303(d) listed water.
TOTAL MAXIMUM DAILY LOAD (TMDL) STRATEGY
The condition in the Village's MS4 permit where a TMDL including requirements for control of
stormwater discharges has been approved by the EPA for a water body or watershed into
which the MS4 discharges. If the discharge from the MS4 did not meet the TMDL stormwater
allocations prior to September 10, 2003, the Village was required to modify its stormwater
management program to ensure that reduction of the pollutant of concern specified in the
TMDL is achieved.
THE CONDITION IN THE VILLAGE'S MS4 PERMIT THAT APPLIES IF A TMDL IS
APPROVED IN THE FUTURE BY THE EPA FOR ANY WATER BODY OR WATERSHED
INTO WHICH AN MS4 DISCHARGES
Under this condition, the Village must review the applicable TMDL to see if it includes
requirements for control of stormwater discharges. If an MS4 is not meeting the TMDL
stormwater allocations, the Village must, within six months of the TMDL's approval, modify its
stormwater management program to ensure that reduction of the pollutant of concern
specified in the TMDL is achieved.
STATE POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) STORMWATER DISCHARGE
PERMIT
A permit issued by the NYSDEC that authorizes the discharge of pollutants to waters of the state.
STORMWATER
Rainwater, surface runoff, snowmelt and drainage.
STORMWATER MANAGEMENT OFFICER (SMO)
The Village Engineer and his or her designees, and/or such other Village officers or employees as
designated by the Village Manager. The Westchester County Department of Health presently is
and shall continue to be the enforcement authority for the design, repair, replacement and
operation of individual sewage treatment systems within the MS4.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
18/23
(1)
(2)
A.
303(d) LIST
A list of all surface waters in the state for which beneficial uses of the water (drinking, recreation,
aquatic habitat, and industrial use) are impaired by pollutants, prepared periodically by the DEC as
required by Section 303(d) of the Clean Water Act. 303(d) listed waters are estuaries, lakes and
streams that fall short of state surface water quality standards and are not expected to improve
within the next two years.
TOTAL MAXIMUM DAILY LOAD (TMDL)
The maximum amount of a pollutant to be allowed to be released into a water body so as not to
impair uses of the water, allocated among the sources of that pollutant.
VILLAGE
The Village of Croton-on-Hudson, New York.
WASTEWATER
Water that is not stormwater, is contaminated with pollutants and is or will be discarded.
§ 196-16. Applicability.
This article shall apply to all water entering the MS4 generated on any developed and undeveloped
lands unless explicitly exempted by an authorized enforcement agency.
§ 196-17. Administration and enforcement.
The Stormwater Management Officer(s) shall administer, implement and enforce the provisions of this
article. Such powers granted or duties imposed upon the SMO(s) may be delegated by the SMO(s) as
may be authorized by the Village Manager.
§ 196-18. Prohibition of illegal discharges and illicit connections;
exceptions.
Prohibition of illegal discharges. No person shall discharge or cause to be discharged into the
MS4 any materials other than stormwater except as provided in § 196-18A. The commencement,
conduct or continuance of any illegal discharge to the MS4 is prohibited except as described as
follows:
The following discharges are exempt from discharge prohibitions established by this article,
unless the NYSDEC or the Village Board of Trustees by resolution has determined them to be
substantial contributors of pollutants: water line flushing or other potable water sources,
landscape irrigation or lawn watering, existing diverted stream flows, rising groundwater,
uncontaminated groundwater infiltration to storm drains, uncontaminated pumped
groundwater, foundation or footing drains, crawl space or basement sump pumps, air
conditioning condensate, irrigation water, springs, water from individual residential car
washing, natural riparian habitat or wetland flows, dechlorinated swimming pool discharges,
residential street wash water, water from fire-fighting activities, and any other water source
not containing pollutants.
Discharges approved in writing by the SMO to protect life or property from imminent harm or
damage, provided that such approval shall not be construed to constitute compliance with
other applicable laws and requirements, and further provided that such discharges may be
permitted for a specified time period and under such conditions as the SMO may deem
appropriate to protect such life and property while reasonably maintaining the purpose and
intent of this article.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
19/23
(3)
(4)
(1)
(2)
(3)
B.
(1)
(2)
A.
B.
(1)
(2)
(3)
A.
B.
Dye testing in compliance with applicable state and local laws is a allowable discharge, but
requires a verbal notification to the SMO at least 24 hours prior to the time of the test.
The prohibition shall not apply to any discharge permitted under a SPDES permit, waiver, or
waste discharge order issued to the discharger and administered under the authority of the
NYSDEC, provided that the discharger is in full compliance with all requirements of the
permit, waiver, or order and other applicable laws and regulations, and provided that written
approval has been granted for any discharge to the MS4.
Prohibition of illicit connections.
The construction, use, maintenance or continued existence of illicit connections to the MS4 is
prohibited.
This prohibition expressly includes, without limitation, illicit connections made in the past,
regardless of whether the connection was permissible under law or practices applicable or
prevailing at the time of connection.
A person is considered to be in violation of this article if the person connects a line conveying
sewage or any other wastewater discharge to the Village's MS4, or allows such a connection
to continue.
§ 196-19. Prohibition against activities contaminating stormwater.
Activities that are subject to the requirements of this section include:
Activities that cause or contribute to a violation of the Village's MS4 SPDES permit.
Activities that cause or contribute to the Village being subject to the special conditions as
defined in § 196-15, Definitions, of this article.
Upon notification to a person that he or she is engaged in activities that cause or contribute to
violations of the Village's MS4 SPDES permit authorization, that person shall take all reasonable
actions to correct such activities such that he or she no longer causes or contributes to violations
of the Village's MS4 SPDES permit authorization.
§ 196-20. Use of best management practices required.
Where the SMO has identified illegal discharges as defined in § 196-15 or activities contaminating
stormwater as defined in § 196-19, the Village may require implementation of best management
practices (BMPs) to control those illegal discharges and activities.
The owner or operator of a commercial or industrial establishment shall provide, at its own
expense, reasonable protection from accidental discharge of prohibited materials or other
wastes into the MS4 through the use of structural and nonstructural BMPs.
Any person responsible for a property or premises, which is, or may be, the source of an
illegal discharge as defined in § 196-15 or an activity contaminating stormwater as defined in
§ 196-19 may be required to implement, at said person's expense, additional structural and
nonstructural BMPs to reduce or eliminate the source of pollutant(s) to the MS4.
Compliance with all terms and conditions of a valid SPDES permit authorizing the discharge
of stormwater associated with industrial activity, to the extent practicable, shall be deemed
compliance with the provisions of this section.
Every person owning property through which a watercourse passes, or such person's lessee, shall
keep and maintain that part of the watercourse within the property free of trash, debris and other
obstacles that would pollute, contaminate or significantly retard the flow of water through the
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
20/23
A.
B.
A.
(1)
(2)
(3)
B.
watercourse. In addition, the owner or lessee shall maintain existing privately owned structures
within or adjacent to a watercourse, so that such structures will not become a hazard to the use,
function or physical integrity of the watercourse.
§ 196-21. Suspension of access to MS4.
The SMO may, without prior notice, suspend MS4 discharge access to a person when such
suspension is necessary to stop an actual or threatened discharge which presents or may present
imminent and substantial danger to the environment, to the health or welfare of persons, or to the
MS4. The SMO shall notify the person of such suspension within a reasonable time thereafter, in
writing, including the reasons for the suspension. If the violator fails to comply with a suspension
order issued in an emergency, the SMO may take such steps as deemed necessary to prevent or
minimize damage to the MS4 or to minimize danger to persons.
Suspension due to the detection of illegal discharge. Any person discharging to the Village's MS4
in violation of this article may have his or her MS4 access terminated if such termination would
abate or reduce an illegal discharge. The SMO will notify a violator in writing of the proposed
termination of its MS4 access and the reasons therefor. The violator may petition the SMO for a
reconsideration. Access may be granted by the SMO, with or without conditions, if he/she finds
that the illegal discharge has ceased and the discharger has taken steps to prevent its recurrence.
Access may be denied if the SMO determines in writing that the illegal discharge has not ceased
or is likely to recur. A person commits an offense if the person reinstates MS4 access to premises
terminated pursuant to this section, without the prior approval of the SMO.
§ 196-22. Industrial or construction activity discharges.
Any person subject to an industrial or construction activity SPDES stormwater discharge permit shall
comply with all provisions of such permit. Proof of compliance with said permit may be required in a
form acceptable to the Village prior to the allowing of discharges to the MS4. All reports submitted to
the NYSDEC as required by the SPDES permit shall also be contemporaneously transmitted to the
SMO.
§ 196-23. Access to property; inspection; monitoring of
discharges.
Applicability. This section applies to all facilities that the SMO must inspect to enforce any
provision of this article, or whenever the authorized enforcement agency has cause to believe that
there exists, or potentially exists, in or upon any premises any condition which constitutes a
violation of this article.
Access to facilities.
The SMO shall be permitted to enter and inspect facilities subject to regulation under this
article as often as may be necessary to determine compliance with this article. If a discharger
has security measures in force which require proper identification and clearance before entry
into its premises, the discharger shall make the necessary arrangements to allow access to
the SMO.
Facility operators shall allow the SMO ready access to all parts of the premises for the
purposes of inspection, sampling, examination and copying of records as may be required to
implement this article.
The Village shall have the right to set up on any facility subject to this article such devices as
are necessary in the opinion of the SMO to conduct monitoring and/or sampling of the
facility's stormwater discharge or conduct other testing as deemed necessary by the SMO.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
21/23
(4)
(5)
(6)
(1)
(2)
(3)
(4)
(5)
A.
B.
The Village has the right to require the facilities subject to this article to install monitoring
equipment as is reasonably necessary to determine compliance with this article. The facility's
sampling and monitoring equipment shall be maintained at all times in a safe and proper
operating condition by the discharger at its own expense. All devices used to measure
stormwater flow and quality shall be calibrated to ensure their accuracy.
Unreasonable delays in allowing the Village access to a facility subject to this article is a
violation of this article. A person who is the operator of a facility subject to this article commits
an offense if the person denies the Village reasonable access to the facility for the purpose of
conducting any activity authorized or required by this article.
If the SMO has been refused access to any part of the premises from which stormwater is
discharged, and he/she is able to demonstrate probable cause to believe that there may be a
violation of this article, or that there is a need to inspect and/or sample as part of a routine
inspection and sampling program designed to verify compliance with this article or any order
issued hereunder, then the SMO may seek issuance of a search warrant from any court of
competent jurisdiction.
§ 196-24. Notification of spills.
Notwithstanding other requirements of this article, as soon as any person responsible for a facility or
operation, or responsible for emergency response for a facility or operation, has information of any
known or suspected release of materials which is resulting or may result in illegal discharges or
pollutants discharging into the MS4, said person shall take all necessary steps to ensure the discovery,
containment, and cleanup of such release. In the event of such a release of hazardous materials, said
person shall immediately notify emergency response agencies of the occurrence via emergency
dispatch services. In the event of a release of nonhazardous materials, said person shall notify the
Village in person or by telephone or facsimile no later than the next business day. Notifications in
person or by telephone shall be confirmed by written notice addressed and mailed to the Village within
three business days of the telephone notice. If the discharge of prohibited materials emanates from a
commercial or industrial establishment, the owner or operator of such establishment shall also retain
an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records
shall be retained for at least three years. Appropriate state and federal agencies shall also be notified
as per applicable regulations.
§ 196-25. Enforcement; penalties for offenses.
Notice of violation. When the SMO finds that a person has violated a prohibition or failed to meet a
requirement of this article, the SMO may order compliance by written notice of violation to the
responsible person. Such notice may require, without limitation:
The elimination of illicit connections or illegal discharges;
That violating discharges, practices, or operations shall cease and desist;
The abatement or remediation of stormwater pollution or contamination hazards and the
restoration of any affected property;
The performance of monitoring, analyses, and reporting; and
The implementation of source control or treatment BMPs.
If abatement of a violation and/or restoration of affected property is required, the notice shall set
forth a deadline within which such remediation or restoration must be completed. Said notice shall
further advise that, should the violator fail to remediate or restore within the established deadline,
the work will be done by the Village or a contractor designated by the Village and the expense
thereof shall be charged to the violator.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
22/23
C.
D.
E.
F.
If the violation has not been corrected pursuant to the requirements set forth in the notice of
violation, then the SMO shall request the owner's permission for access to the subject private
property to take any and all measures reasonably necessary to abate the violation and/or restore
the property.
If refused access to the subject private property, the SMO may seek a warrant in a court of
competent jurisdiction to be authorized to enter upon the property to determine whether a violation
has occurred and remains unabated. Upon determination that a violation has occurred and
remains unabated, the SMO may seek a court order to take any and all measures reasonably
necessary to abate the violation and/or restore the property. The cost of implementing and
maintaining such measures shall be the sole responsibility of the discharger.
Within 30 days after abatement of the violation by or under authorization of the SMO, the owner of
the property will be notified of the cost of abatement, including administrative costs. The property
owner may file a written protest with the Village Board of Trustees objecting to the amount of the
assessment within 10 days of receipt of said notice. If the amount due is not paid within 30 days
after the disposition of any protests or the expiration of the time to file an appeal, whichever is
earlier, the charges shall become a lien on the property for the amount of the assessment to be
collected in the same manner as real estate taxes.
Any person who violates the provisions of this article shall be guilty of a offense punishable by a
fine not less than $500 nor more than $1,000 or imprisonment for a period not to exceed six
months, or both; for conviction of a second offense, both of which were committed within a period
of five years, punishable by a fine not less than $1,000 nor more than $1,500 or imprisonment for
a period not to exceed six months, or both; and upon conviction for a third or subsequent offense,
all of which were committed within a period of five years, punishable by a fine not less than $1,500
nor more than $2,000 or imprisonment for a period not to exceed six months, or both. However, for
the purposes of conferring jurisdiction upon courts and judicial officers generally, violations of this
article shall be deemed misdemeanors, and for such purpose only all provisions of law relating to
misdemeanors shall apply to such violations. Each week's continued violation shall constitute a
separate additional violation.
§ 196-26. Injunctive relief.
It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements
of this article. If a person has violated or continues to violate the provisions of this article, the SMO may
request the Village Attorney to petition for a preliminary or permanent injunction restraining the person
from activities which would create further violations or compelling the person to perform abatement or
remediation of the violation.
§ 196-27. Violations deemed public nuisance.
In addition to the enforcement processes and penalties provided, any condition caused or permitted to
exist in violation of any of the provisions of this article is a threat to public health, safety, and welfare,
and is declared and deemed a nuisance, and may be summarily abated or restored at the violator's
expense, and/or a civil action to abate, enjoin, or otherwise compel the cessation of such nuisance
may be taken.
§ 196-28. Remedies not exclusive.
The remedies listed in this article are not exclusive of any other remedies available under any
applicable federal, state or local law and it is within the discretion of the authorized enforcement
agency to seek cumulative remedies.
11/5/21, 4:21 PM
Village of Croton-on-Hudson, NY Ecode360
https://ecode360.com/print/CR0035?guid=9143578&children=true
23/23
§ 196-29. Severability.
If any provision of this chapter or of any article, section, subsection, paragraph, subdivision or clause of
this chapter shall be judged invalid for any reason by a court of competent jurisdiction, such order or
judgment shall not affect or invalidate the remainder of any article, section, subsection, paragraph,
subdivision or clause of this chapter.
Select Language ▼
Chapter 262
STORMWATER MANAGEMENT AND EROSION AND SEDIMENT
CONTROL
GENERAL REFERENCES
Excavations and topsoil removal — See Ch. 157.
Flood damage prevention — See Ch. 175.
Freshwater wetlands, water bodies and watercourses — See
Ch. 179.
Sludge and hazardous materials — See Ch. 253.
Steep slopes — See Ch. 259.
Storm sewers — See Ch. 263.
Subdivision of land — See Ch. 265.
Diversion of watercourses — See Ch. 301.
Zoning — See Ch. 307.
§ 262-1. Intent.
In accordance with the Municipal Home Rule Law of the State of New York, the Town
of Cortlandt has the authority to enact local laws for the purpose of promoting the health,
safety or general welfare of the Town and for the protection and enhancement of its
physical environment. With this purpose in mind, these regulations are enacted with the
intent of providing stormwater, erosion and sediment control practices within the Town
of Cortlandt. It is also the intent of this chapter to promote the public purposes identified
in this section by providing for the protection, preservation, and proper maintenance
of stormwater facilities and preventing or minimizing erosion due to flooding and
stormwater runoff.
§ 262-2. Definitions.
As used in this chapter, the following terms shall have the meanings indicated:
APPLICANT — A property owner or agent of a property owner who has filed an
application for a land development activity.
APPROVING AUTHORITY — The Town Board, Zoning Board of Appeals, Planning
Board or the Director of the Department of Technical Services or his designee.
BEST MANAGEMENT PRACTICES (BMPs) — A practice or combination of
practices that is the most effective and practicable (including technological, economic
and institutional considerations) means of controlling point or nonpoint source pollutants
at levels compatible with environmental quality goals.
BUILDING — Any structure, either temporary or permanent, having walls and a roof,
designed for the shelter of any person, animal, or property, and occupying more than 100
square feet of area.
CHANNEL — A natural or artificial watercourse with a definite bed and banks that
conducts continuously or periodically flowing water.
CLEARING — Any activity that removes the vegetative surface cover.
262:1
DEDICATION — The deliberate appropriation of property by its owner for general
public use.
DEPARTMENT — The New York State Department of Environmental Conservation.
DESIGN MANUAL — The New York State Stormwater Design Manual, most recent
version, including applicable updates that serves as the official guide for stormwater
management principles, methods and practices.
DEVELOPER — A person who undertakes land development activities.
EROSION CONTROL MANUAL — The most recent version of the New York
Standards and Specifications for Erosion and Sediment Control manual, commonly
known as the "Blue Book."
GRADING — Excavation or fill of material, including the resulting conditions thereof.
IMPERVIOUS COVER — Those surfaces, improvements and structures that cannot
effectively infiltrate rainfall, snowmelt and water (e.g., building rooftops, pavement,
sidewalks, driveways, etc.).
INDUSTRIAL STORMWATER PERMIT — A State Pollutant Discharge Elimination
System permit issued to a commercial industry or group of industries which regulates
the pollutant levels associated with industrial stormwater discharges or specifies on-site
pollution control strategies.
INFILTRATION — The process of percolating stormwater into the subsoil.
LAND DEVELOPMENT ACTIVITY — Construction activity including clearing,
grading, excavating, soil disturbance or placement of fill that results in land disturbance
of equal to or greater than one acre, or activities disturbing less than one acre of total land
area that is part of a larger common plan of development or sale, even though multiple
separate and distinct land development activities may take place at different times on
different schedules.
LANDOWNER — The legal or beneficial owner of land, including those holding the
right to purchase or lease the land, or any other person holding proprietary rights in the
land.
MAINTENANCE AGREEMENT — A legally recorded document or a municipally
formed drainage district that acts as a property deed restriction, and which provides for
long-term maintenance of stormwater management practices.
NONPOINT SOURCE POLLUTION — Pollution from any source other than from any
discernible, confined, and discrete conveyances, and shall include, but not be limited to,
pollutants from agricultural, silvicultural, mining, construction, subsurface disposal and
urban runoff sources.
PHASING — Clearing a parcel of land in distinct pieces or parts, with the stabilization
of each piece completed before the clearing of the next.
POLLUTANT OF CONCERN — Sediment or a water quality measurement that
addresses sediment (such as total suspended solids, turbidity or siltation) and any other
pollutant that has been identified as a cause of impairment of any water body that will
receive a discharge from the land development activity.
PROJECT — Land development activity.
§ 262-2
CORTLANDT CODE
§ 262-2
262:2
RECHARGE — The replenishment of underground water reserves.
SEDIMENT CONTROL — Measures that prevent eroded sediment from leaving the
area of disturbance.
SENSITIVE AREAS — Cold-water fisheries, shellfish beds, swimming beaches,
groundwater recharge areas, water supply reservoirs, habitats for threatened, endangered
or special concern species.
SPDES GENERAL PERMIT FOR CONSTRUCTION ACTIVITIES GP-02-01 — A
permit under the New York State Pollutant Discharge Elimination System (SPDES)
issued to developers of construction activities to regulate disturbance of one or more
acres of land.
SPDES
GENERAL
PERMIT
FOR
STORMWATER
DISCHARGES
FROM
MUNICIPAL SEPARATE STORMWATER SEWER SYSTEMS GP-02-02 — A
permit under the New York State Pollutant Discharge Elimination System (SPDES)
issued to municipalities to regulate discharges from municipal separate storm sewers for
compliance with EPA-established water quality standards and/or to specify stormwater
control standards.
STABILIZATION — The use of practices that prevent exposed soil from eroding.
STOP-WORK ORDER — An order issued which requires that all construction activity
on a site be stopped.
STORMWATER — Rainwater, surface runoff, snowmelt and drainage.
STORMWATER HOTSPOT — A land use or activity that generates higher
concentrations of hydrocarbons, trace metals or toxicants than are found in typical
stormwater runoff, based on monitoring studies.
STORMWATER MANAGEMENT — The use of structural or nonstructural practices
that are designed to reduce stormwater runoff and mitigate its adverse impacts on
property, natural resources and the environment.
STORMWATER MANAGEMENT FACILITY — One or a series of stormwater
management practices installed, stabilized and operating for the purpose of controlling
stormwater runoff.
STORMWATER MANAGEMENT OFFICER (SMO) — The Director of the
Department of Technical Services or his/her designee.
STORMWATER
MANAGEMENT
PRACTICES
(SMPS)
—
Measures,
either
structural or nonstructural, that are determined to be the most effective, practical means
of preventing flood damage and preventing or reducing point source or nonpoint source
pollution inputs to stormwater runoff and water bodies.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) — A plan for
controlling stormwater runoff and pollutants from a site during and after construction
activities.
STORMWATER RUNOFF — Flow on the surface of the ground, resulting from
precipitation.
SURFACE WATERS OF THE STATE OF NEW YORK — Lakes, bays, sounds, ponds,
impounding reservoirs, springs, wells, rivers, streams, creeks, estuaries, marshes, inlets,
§ 262-2
STORMWATER MANAGEMENT AND EROSION AND
§ 262-2
262:3
canals, the Atlantic Ocean within the territorial seas of the State of New York and all
other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, public
or private (except those private waters that do not combine or effect a junction with
natural surface or underground waters), which are wholly or partially within or bordering
the state or within its jurisdiction. Storm sewers and waste treatment systems, including
treatment ponds or lagoons which also meet the criteria of this definition, are not waters
of the state. This exclusion applies only to man-made bodies of water which neither were
originally created in waters of the state (such as a disposal area in wetlands) nor resulted
from impoundment of waters of the state.
WETLAND(S) — An area that is regulated by the Department or by other local laws
and ordinances of the Town of Cortlandt. See also Chapter 179, Freshwater Wetlands,
Water Bodies and Watercourses.
WATERCOURSE — A permanent or intermittent stream or other body of water, either
natural or man-made, which gathers or carries surface water.
WATERWAY — A channel that directs surface runoff to a watercourse or to the public
storm drain.
§ 262-3. Findings of fact.
It is hereby determined that:
A.
Land development activities and associated increases in site impervious cover often
alter the hydrologic response of local watersheds and increase stormwater runoff
rates and volumes, flooding, stream channel erosion, or sediment transport and
deposition.
B.
This stormwater runoff contributes to increased quantities of water-borne
pollutants, including siltation of aquatic habitat for fish and other desirable species.
C.
Clearing and grading during construction tends to increase soil erosion and add to
the loss of native vegetation necessary for terrestrial and aquatic habitat.
D.
Improper design and construction of stormwater management practices can
increase the velocity of stormwater runoff, thereby increasing stream bank erosion
and sedimentation.
E.
Impervious surfaces allow less water to percolate into the soil, thereby decreasing
groundwater recharge and stream baseflow.
F.
Substantial economic losses can result from these adverse impacts on the waters of
the municipality.
G.
Stormwater runoff, soil erosion and nonpoint source pollution can be controlled and
minimized through the regulation of stormwater runoff from land development
activities.
H.
The regulation of stormwater runoff discharges from land development activities in
order to control and minimize increases in stormwater runoff rates and volumes,
soil erosion, stream channel erosion, and nonpoint source pollution associated with
stormwater runoff is in the public interest and will minimize threats to public health
and safety.
§ 262-2
CORTLANDT CODE
§ 262-3
262:4
§ 262-4. Purpose.
The purpose of this chapter is to establish minimum stormwater management
requirements and controls to protect and safeguard the general health, safety, and welfare
of the public residing within this jurisdiction and to address the findings of fact in
§ 262-3 hereof. This chapter seeks to meet those purposes by achieving the following
objectives:
§ 262-5. Applicability.
I.
Regulation of land development activities by means of performance standards
governing stormwater management and site design will produce development
compatible with the natural functions of a particular site or an entire watershed and
thereby
mitigate
the
adverse
effects
of
erosion
and
sedimentation
from
development.
A.
Meet the requirements of minimum measures 4 and 5 of the SPDES General Permit
for Stormwater Discharges from Municipal Separate Stormwater Sewer Systems
(MS4s), Permit No. GP-02-02, when adopted or as amended or revised;
B.
Require land development activities to conform to the substantive requirements of
the NYS Department of Environmental Conservation State Pollutant Discharge
Elimination System (SPDES) General Permit for Construction Activities GP-02-01,
or as amended or revised;
C.
Minimize increases in stormwater runoff from land development activities in order
to reduce flooding, siltation, increases in stream temperature, and stream bank
erosion and maintain the integrity of stream channels;
D.
Minimize increases in pollution caused by stormwater runoff from land
development activities which would otherwise degrade local water quality;
E.
Minimize the total annual volume of stormwater runoff which flows from any
specific site during and following development to the maximum extent practicable;
and
F.
Reduce stormwater runoff rates and volumes, soil erosion and nonpoint source
pollution, wherever possible, through stormwater management practices and ensure
that these management practices are properly maintained and eliminate threats to
public safety.
A.
This chapter shall be applicable to all land development activities as defined in this
chapter.
B.
The municipality shall designate the Director of the Department of Technical
Services or his designee to act as Stormwater Management Officer. The Stormwater
Management Officer shall accept and review all stormwater pollution prevention
plans and forward such plans to the applicable municipal board. The Stormwater
Management Officer may (1) review the plans, (2) or engage the services of a
registered professional engineer to review the plans, specifications and related
documents, to be paid for by the applicant.
§ 262-3
STORMWATER MANAGEMENT AND EROSION AND
§ 262-5
262:5
§ 262-6. Exemptions.
The following activities may be exempt from review under this chapter:
§ 262-7. Stormwater pollution prevention plans.
C.
All land development activities subject to review and approval by an approving
authority (Town Board, Planning Board, Zoning Board of Appeals, DOTS
Director) in the Town of Cortlandt shall be reviewed subject to the standards
contained in this chapter.
A.
Agricultural activity as defined in this chapter.
B.
Routine maintenance activities that disturb fewer than five acres and are performed
to maintain the original line and grade, hydraulic capacity or original purpose of a
facility.
C.
Repairs to any stormwater management practice or facility deemed necessary by
the Stormwater Management Officer.
D.
Any part of a subdivision if a plat for the subdivision has been approved by the
approving authority on or before the effective date of this chapter.
E.
Land development activities for which a building permit has been approved on or
before the effective date of this chapter.
F.
Installation of fence, sign, telephone, and electric poles and other kinds of posts or
poles.
G.
Emergency activity immediately necessary to protect life, property or natural
resources.
H.
Activities of an individual engaging in home gardening by growing flowers,
vegetable and other plants primarily for use by that person and his or her family.
I.
Landscaping and horticultural activities in connection with an existing structure.
A.
Required. No application for approval of a land development activity shall be
finalized until the approving authority has received a stormwater pollution
prevention plan (SWPPP) when required, and prepared in accordance with the
specifications in this chapter.
B.
Contents.
(1)
All SWPPPs shall provide the following background information and erosion
and sediment controls:
(a)
Background information about the scope of the project, including
location, type and size of project.
(b)
Site map/construction drawing(s) for the project, including a general
location map. At a minimum, the site map should show the total site area;
all improvements; areas of disturbance; areas that will not be disturbed;
existing vegetation; on-site and adjacent off-site surface water(s);
§ 262-5
CORTLANDT CODE
§ 262-7
262:6
wetlands and drainage patterns that could be affected by the construction
activity; existing and final slopes; locations of off-site material, waste,
borrow or equipment storage areas; and location(s) of the stormwater
discharge(s). The site map should be at a scale no smaller than one inch
equals 100 feet.
(c)
Description of the soil(s) present at the site.
(d)
phasing
plan
describing
the
intended
sequence
of
construction activities, including clearing and grubbing, excavation and
grading, utility and infrastructure installation and any other activity at the
site that results in soil disturbance. Consistent with the New York
Standards and Specifications for Erosion and Sediment Control (Erosion
Control Manual), not more than five acres shall be disturbed at any one
time unless pursuant to an approved SWPPP.
(e)
Description of the pollution prevention measures that will be used to
control litter, construction chemicals and construction debris from
becoming a pollutant source in stormwater runoff.
(f)
Description of construction and waste materials expected to be stored on-
site with updates as appropriate, and a description of controls to reduce
pollutants from these materials, including storage practices to minimize
exposure of the materials to stormwater, and spill prevention and
response.
(g)
Temporary and permanent structural and vegetative measures to be used
for soil stabilization, runoff control and sediment control for each stage
of the project, from initial land clearing and grubbing to project close-out.
(h)
A site map/construction drawing(s) specifying the location(s), size(s) and
length(s) of each erosion and sediment control practice.
(i)
Dimensions, material specifications and installation details for all erosion
and sediment control practices, including the siting and sizing of any
temporary sediment basins.
(j)
Temporary practices that will be converted to permanent control
measures.
(k)
Implementation schedule for staging temporary erosion and sediment
control practices, including the timing of initial placement and duration
that each practice should remain in place.
(l)
Maintenance schedule to ensure continuous and effective operation of the
erosion and sediment control practice.
(m) Name(s) of the receiving water(s).
(n)
Delineation of SWPPP implementation responsibilities for each part of
the site.
(o)
Description of structural practices designed to divert flows from exposed
§ 262-7
STORMWATER MANAGEMENT AND EROSION AND
§ 262-7
262:7
soils, store flows, or otherwise limit runoff and the discharge of pollutants
from exposed areas of the site to the degree attainable.
(p)
Any existing data that describes the stormwater runoff at the site.
(2)
Conditions A, B and C.
(a)
Land development activities meeting Condition A, B or C below shall
also include water quantity and water quality controls (postconstruction
stormwater runoff controls) as set forth below as applicable:
[1]
Condition A: stormwater runoff from land development activities
discharging a pollutant of concern to either an impaired water
identified on the Department's 303(d) list of impaired waters or a
total maximum daily load (TMDL) designated watershed for which
pollutants in stormwater have been identified as a source of the
impairment.
[2]
Condition B: stormwater runoff from land development activities
disturbing five or more acres.
[3]
Condition
C:
stormwater
runoff
from
construction
activity
disturbing between one acre and five acres of land during the course
of the project, exclusive of the construction of single-family
residences and construction activities at agricultural properties.
(b)
SWPPP requirements for Conditions A, B and C:
[1]
All information in Subsection B(1).
[2]
Description of each postconstruction stormwater management
practice.
[3]
Site map/construction drawing(s) showing the specific location(s)
and size(s) of each postconstruction stormwater management
practice.
[4]
Hydrologic and hydraulic analysis for all structural components of
the stormwater management system for the applicable design
storms.
[5]
Comparison of postdevelopment stormwater runoff conditions with
predevelopment conditions.
[6]
Dimensions, material specifications and installation details for each
postconstruction stormwater management practice.
[7]
Maintenance schedule to ensure continuous and effective operation
of each postconstruction stormwater management practice.
[8]
easements
to
ensure
access
to
all
stormwater
management practices at the site for the purpose of inspection and
repair. Easements shall be recorded on the plan and shall remain in
effect with transfer of title to the property.
§ 262-7
CORTLANDT CODE
§ 262-7
262:8
§ 262-8. Performance and design criteria.
All land development activities shall be subject to the following performance and design
criteria:
[9]
Inspection and maintenance agreement binding on all subsequent
landowners served by the on-site stormwater management measures
in accordance with § 262-9 of this chapter.
C.
Plan certification. The SWPPP shall be prepared by a landscape architect, certified
professional or professional engineer and must be signed by the professional
preparing the plan, who shall certify that the design of all stormwater management
practices meets the requirements in this chapter.
D.
Other environmental permits. The applicant shall assure that all other applicable
environmental permits have been or will be acquired for the land development
activity prior to approval of the final stormwater design plan.
E.
Contractor certification.
(1)
Each contractor and subcontractor identified in the SWPPP who will be
involved
in soil
disturbance
and/or stormwater
management
practice
installation shall sign and date a copy of the following certification statement
before undertaking any land development activity: "I certify under penalty of
law that I understand and agree to comply with the terms and conditions of the
Stormwater Pollution Prevention Plan. I also understand that it is unlawful for
any person to cause or contribute to a violation of water quality standards."
(2)
The certification must include the name and title of the person providing the
signature; address and telephone number of the contracting firm; the address
(or other identifying description) of the site; and the date the certification is
made.
(3)
The certification statement(s) shall become part of the SWPPP for the land
development activity.
F.
A copy of the SWPPP shall be retained at the site of the land development activity
during construction, from the date of initiation of construction activities to the date
of final stabilization.
A.
Technical standards. For the purpose of this chapter, the following documents shall
serve as the official guides and specifications for stormwater management.
Stormwater management practices that are designed and constructed in accordance
with these technical documents shall be presumed to meet the standards imposed
by this chapter:
(1)
The New York State Stormwater Management Design Manual (New York
State Department of Environmental Conservation, most current version or its
successor, hereafter referred to as the "Design Manual").
(2)
New York Standards and Specifications for Erosion and Sediment Control
(Empire State Chapter of the Soil and Water Conservation Society, 2004, most
current version or its successor, hereafter referred to as the "Erosion Control
§ 262-7
STORMWATER MANAGEMENT AND EROSION AND
§ 262-8
262:9
§ 262-9. Maintenance and repair of stormwater facilities.
Manual").
(3)
Best management practices if established by resolution of the Town Board,
which may be updated from time to time.
B.
Water quality standards. No land development activity shall cause an increase in
turbidity that will result in visible contrast to natural conditions in surface waters of
the State of New York.
A.
Maintenance during construction.
(1)
The applicant or developer of the land development activity shall at all times
properly operate and maintain all facilities and systems of treatment and
control (and related appurtenances) which are installed or used by the
applicant or developer to achieve compliance with the conditions of this
chapter. Sediment shall be removed from sediment traps or sediment ponds
whenever their design capacity has been reduced by 50%.
(2)
The applicant or developer or their representative shall be on site at all times
when construction or grading activity takes place and shall inspect and
document the effectiveness of all erosion and sediment control practices.
Inspection reports shall be completed every seven days and within 24 hours of
any storm event producing 0.5 inch of precipitation or more. The reports shall
be delivered to the Stormwater Management Officer and also copied to the site
log book.
B.
Maintenance easement(s). Prior to the issuance of any approval that has a
stormwater management facility as one of the requirements, the applicant or
developer must execute a maintenance easement agreement or petition the Town
Board for the establishment of a drainage district which shall be binding on all
subsequent landowners served by the stormwater management facility. The
easement or district shall provide for access to the facility at reasonable times for
periodic inspection by the approving authority of the Town of Cortlandt to ensure
that the facility is maintained in proper working condition to meet design standards
and any other provisions established by this chapter. The easement shall be
recorded in the office of the County Clerk after approval by the Town Attorney for
the Town of Cortlandt.
C.
Maintenance after construction. The owner or operator of permanent stormwater
management practices installed in accordance with this chapter shall be operated
and maintained to achieve the goals of this chapter. Proper operation and
maintenance also includes, as a minimum, the following:
(1)
A preventive/corrective maintenance program for all critical facilities and
systems of treatment and control (or related appurtenances) which are installed
or used by the owner or operator to achieve the goals of this chapter.
(2)
Written procedures for operation and maintenance and training new
maintenance personnel.
§ 262-8
CORTLANDT CODE
§ 262-9
262:10
§ 262-10. Erosion and sediment control.
Measures for the control of erosion and sedimentation shall be undertaken consistent
with the most current version of the Westchester County Soil and Water Conservation
District's Best Management Practices Manual for Erosion and Sediment Control and
New York State Guidelines for Urban Erosion and Sediment Control, as amended, or
their equivalents satisfactory to the approval authority.
§ 262-11. Construction inspections.
(3)
Discharges from the SMPs shall not exceed design criteria or cause or
contribute to water quality standard violations in accordance with Subsection
B.
D.
Maintenance agreements. The Town of Cortlandt shall approve a formal
maintenance agreement for stormwater management facilities binding on all
subsequent landowners and recorded in the office of the County Clerk as a deed
restriction on the property prior to final plan approval. The maintenance agreement
shall be consistent with the terms and conditions as set forth by the Town Attorney
and the Director of Technical Services. The Town of Cortlandt, in lieu of a
maintenance agreement, at its sole discretion may establish a drainage district to
accept dedication of any existing or future stormwater management facility,
provided such facility meets all the requirements of this chapter and includes
adequate and perpetual access and sufficient area, by easement or otherwise, for
inspection and regular maintenance.
A.
Erosion and sediment control inspection.
(1)
The Town of Cortlandt Stormwater Management Officer may require such
inspections as necessary to determine compliance with this chapter and may
either approve that portion of the work completed or notify the applicant
wherein the work fails to comply with the requirements of this chapter and the
stormwater pollution prevention plan (SWPPP) as approved. To obtain
inspections, the applicant shall notify Town of Cortlandt enforcement official
at least 48 hours before any of the following as required by the Stormwater
Management Officer:
(a)
Start of construction.
(b)
Installation of sediment and erosion control measures.
(c)
Completion of site clearing.
(d)
Completion of rough grading.
(e)
Completion of final grading.
(f)
Close of the construction season.
(g)
Completion of final landscaping.
(h)
Successful establishment of landscaping in public areas.
§ 262-9
STORMWATER MANAGEMENT AND EROSION AND
§ 262-11
262:11
§ 262-12. Performance guarantees; recordkeeping.
(2)
If any violations are found, the applicant and developer shall be notified in
writing of the nature of the violation and the required corrective actions. No
further work shall be conducted, except for site stabilization, until any
violations are corrected and all work previously completed has received
approval by the Stormwater Management Officer.
B.
Stormwater management practice inspections. The applicant is responsible for
compliance.
The
SMO
shall
conduct
periodic
inspections
of
stormwater
management practices (SMPs). All applicants are required to submit "as built" plans
for any stormwater management practices located on-site after final construction is
completed. The plan must show the final design specifications for all stormwater
management facilities and must be certified by a professional engineer.
C.
Inspection of stormwater facilities after project completion.
(1)
Inspection programs shall be established on any reasonable basis, including,
but not limited to: routine inspections; random inspections; inspections based
upon complaints or other notice of possible violations; inspection of drainage
basins or areas identified as higher than typical sources of sediment or other
contaminants or pollutants; inspections of businesses or industries of a type
associated with higher than usual discharges of contaminants or pollutants or
with discharges of a type which are more likely than the typical discharge to
cause violations of state or federal water or sediment quality standards or the
SPDES stormwater permit; and joint inspections with other agencies
inspecting under environmental or safety laws.
(2)
Inspections may include, but are not limited to: reviewing maintenance and
repair records; sampling discharges, surface water, groundwater, and material
or water in drainage control facilities; and evaluating the condition of drainage
control facilities and other stormwater management practices.
D.
Submission of reports. The Town of Cortlandt Stormwater Management Officer
may require monitoring and reporting from entities subject to this chapter as are
necessary to determine compliance with this chapter.
E.
Right-of-entry for inspection. When any new stormwater management facility is
installed on private property or when any new connection is made between private
property and the public stormwater system, the landowner shall grant to the Town
of Cortlandt the right to enter the property at reasonable times and in a reasonable
manner for the purpose of inspection as specified in Subsection C.
A.
Construction completion guarantee. In order to ensure the full and faithful
completion of all land development activities related to compliance with all
conditions set forth by the Town of Cortlandt in its approval of the stormwater
pollution prevention plan, the Town of Cortlandt may require the applicant or
developer to provide, prior to construction, a performance bond, cash escrow, or
irrevocable letter of credit from an appropriate financial or surety institution which
guarantees satisfactory completion of the project and names the Town of Cortlandt
as the beneficiary. The security shall be in an amount to be determined by the
§ 262-11
CORTLANDT CODE
§ 262-12
262:12
§ 262-13. Enforcement; penalties for offenses; fees.
approving authority based on submission of final design plans, with reference to
actual construction and landscaping costs. The performance guarantee shall remain
in force until the surety is released from liability by the Town of Cortlandt, provided
that such period shall not be less than one year from the date of final acceptance
or such other certification that the facility(ies) has been constructed in accordance
with the approved plans and specifications and that a one-year inspection has been
conducted and the facilities have been found to be acceptable to the Town of
Cortlandt.
B.
Maintenance guarantee.
(1)
Where stormwater management and erosion and sediment control facilities are
to be operated and maintained by the developer or by a corporation that owns
or manages a commercial or industrial facility, the developer, prior to
construction, may be required to provide the Town of Cortlandt with an
irrevocable letter of credit from an approved financial institution or surety to
ensure proper operation and maintenance of all stormwater management and
erosion control facilities both during and after construction, and until the
facilities are removed from operation. If the developer or landowner fails to
properly operate and maintain stormwater management and erosion and
sediment control facilities, the Town of Cortlandt may draw upon the account
to cover the costs of proper operation and maintenance, including engineering
and inspection costs.
(2)
Where stormwater management and erosion and sediment control facilities are
to be operated and maintained by the Town of Cortlandt after the Town has
approved all construction, the developer shall provide the Town of Cortlandt
with either cash, or an irrevocable letter of credit from an approved financial
institution or surety to ensure proper operation of all stormwater management
and erosion facilities for a period of not less than two years after the Town
assumes ownership of the facilities.
C.
Recordkeeping. The Town of Cortlandt may require entities subject to this chapter
to maintain records demonstrating compliance with this chapter.
A.
Notice of violation. When the Town of Cortlandt determines that a land
development activity is not being carried out in accordance with the requirements
of this chapter, it may issue a written notice of violation to the landowner. The
notice of violation shall contain:
(1)
The name and address of the landowner, developer or applicant;
(2)
The address, when available, or a description of the building, structure or land
upon which the violation is occurring;
(3)
A statement specifying the nature of the violation;
(4)
A description of the remedial measures necessary to bring the land
development activity into compliance with this chapter and a time schedule for
the completion of such remedial action;
§ 262-12
STORMWATER MANAGEMENT AND EROSION AND
§ 262-13
262:13
(5)
A statement of the penalty or penalties that shall or may be assessed against
the person to whom the notice of violation is directed;
(6)
A statement that the determination of violation may be appealed to the
municipality by filing a written notice of appeal within 15 days of service of
notice of violation.
B.
Stop-work orders. The Town of Cortlandt may issue a stop-work order for
violations of this chapter. Persons receiving a stop-work order shall be required to
halt all land development activities, except those activities that address the
violations leading to the stop-work order. The stop-work order shall be in effect
until the Town of Cortlandt confirms that the land development activity is in
compliance and the violation has been satisfactorily addressed. Failure to address a
stop-work order in a timely manner may result in civil, criminal, or monetary
penalties in accordance with the enforcement measures authorized in this chapter.
C.
Violations. Any land development activity that is commenced or is conducted
contrary to this chapter may be restrained by injunction or otherwise abated in a
manner provided by law.
D.
Penalties.
(1)
A violation of this chapter or a regulation made thereunder is hereby declared
to be an offense, punishable by a fine not exceeding $350 or by imprisonment
for a period not to exceed six months, or both, for conviction of a first offense;
for conviction of a second offense, both of which were committed within a
period of five years, punishable by a fine of not less than $350 nor more than
$700 or by imprisonment for a period not to exceed six months, or both; and
upon a conviction for a third or subsequent offense, all of which were
committed within a period of five years, punishable by a fine of not less than
$700 nor more than $1,000 or by imprisonment for a period not to exceed six
months, or both. However, for the purpose of conferring jurisdiction upon
courts and judicial officers generally, violations of this chapter or regulation
shall be deemed misdemeanors and, for such purpose only, all provisions of
law relating to misdemeanors shall apply to such violations. Each week's
continued violation shall constitute a separate additional violation or a civil
penalty of up to $3,000 for each violation.
(2)
In case any building or structure is erected, constructed, reconstructed, altered,
converted or maintained or any building, structure or land is used in violation
of this chapter, the proper local authorities of the Town, in addition to other
remedies, may institute any appropriate action or proceedings to prevent such
unlawful
erection,
construction,
reconstruction,
alteration,
conversion,
maintenance or use, to restrain, correct or abate such violations, to prevent
occupancy of said building, structure or land or to prevent any illegal act,
conduct, business or use in or about such building, structure or land, and upon
the failure or refusal of the proper local officer, board or body of the Town to
institute any such appropriate action or proceeding for a period of 10 days after
written request by a resident taxpayer of the Town so to proceed, any three
taxpayers of the Town residing in the district wherein such violation exists
who are jointly or severally aggrieved by such violation may institute such
§ 262-13
CORTLANDT CODE
§ 262-13
262:14
appropriate action or proceeding in like manner as such local office, board or
body of the Town is authorized to do.
(3)
Upon his becoming aware of any violation of any of the provisions of this
chapter, the Director of Code Administration and Enforcement shall serve
notice of such violation on the person or corporation committing or permitting
the same, and if such violation has not ceased within such reasonable time as
the Director of Code Administration and Enforcement may specify, he shall
institute such actions as may be authorized pursuant to this section and as may
otherwise be provided under and pursuant to local laws and ordinances of the
Town of Cortlandt and the laws of the State of New York.
E.
Withholding of certificate of occupancy. If any building or land development
activity is installed or conducted in violation of this chapter, the Stormwater
Management Officer may prevent the occupancy of said building or land.
F.
Restoration of lands. Any violator may be required to restore land to its undisturbed
condition. In the event that restoration is not undertaken within a reasonable time
after notice, the Town of Cortlandt may take necessary corrective action, the cost
of which shall become a lien upon the property until paid.
G.
Fees for services. The Town of Cortlandt may require any person undertaking land
development activities regulated by this chapter to pay reasonable costs at
prevailing rates for review of SWPPPs, inspections, or SMP maintenance
performed by the Town of Cortlandt or performed by a third party for the Town of
Cortlandt.
§ 262-13
STORMWATER MANAGEMENT AND EROSION AND
§ 262-13
262:15
52 Upland Lane
APPENDIX C
Owner/Operator Certification
Contractor Certification
52 Upland Lane
OWNER/OPERATOR CERTIFICATION
“I certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted. Based
on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. Further, I hereby
certify that the SWPPP meets all Federal, State, and local erosion and sediment
control requirements. I am aware that false statements made herein are punishable
as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.”
Name (please print) _____________________________________________________
Title _______________________________________________________________
Date _______________________________________________________________
Address _____________________________________________________________
Phone _______________________________________________________________
E-mail _______________________________________________________________
Signature _____________________________________________________________
Name of Trained Individual _______________________________________________
52 Upland Lane
CONTRACTOR CERTIFICATION
Contractor Certification Statement – All contractors and subcontractors identified in a
SWPPP in accordance with Part III.E.1 (SPDES General Permit for Stormwater Runoff
from Construction Activity, GP-0-20-001, January 2015) of this permit shall sign a copy
of the following certification statement before undertaking any construction activity at
the site identified in the SWPPP:
“I hereby certify that I understand and agree to comply with the terms and
conditions of the SWPPP and agree to implement any corrective actions identified
by the qualified inspector during a site inspection. I also understand that the
Owner or Operator must comply with the terms and conditions of the New York
State Pollutant Discharge Elimination System (“SPDES”) general permit for
stormwater discharges from construction activities and that it is unlawful for any
person to cause or contribute to a violation of water quality standards.
Furthermore, I understand that certifying false, incorrect or inaccurate information is
a violation of the referenced permit and the laws of the State of New York and
could subject me to criminal, civil and/or administrative proceedings.”
Individual Contractor:
Name and Title (please print)
Name of Trained Individual
________________________________________
Company / Contracting Firm:
Name of Company
_________________________________________
Address of Company
_________________________________________
Telephone Number / Cell Number_________________________________________
Site Information:
Address of Site
________________________________________
________________________________________
Today’s Date:
52 Upland Lane
APPENDIX D
Construction Sequence
52 Upland Lane
Construction Sequence
Refer to the Plan Set for all plans and details which relate to Construction Sequence.
1.
A licensed surveyor must define infrastructure locations, limits of disturbance,
stormwater basin limits, and grades in the field prior to start of any construction.
Limits of disturbance shall be marked with the installation of construction fence
or approved equal.
2.
Install all perimeter erosion control measures, construction entrance as shown on
the Erosion and Sediment Control Plan and the associated Details.
3.
Cut and clear trees within work area. Timbered trees, wood chips, and stumps
shall be removed off-site. Strip site and place topsoil in stockpile locations
shown on the plan.
4.
Start construction of project access points, set-up staging areas as shown on
Erosion and Sediment Control Plan.
6.
Begin rough grading the site. Contractor to limit exposure of denuded soils by
providing temporary stabilization for work areas that will remain undisturbed for
over seven (7) days. Chipped rock that is not suitable to remain on site shall
be hauled away and properly disposed of. An area has been provided for the
stockpiling of removed soil and rock which is to be removed from the site.
7.
Begin grading of driveway. The sections of driveway started at the beginning of
the work day must be paved and completed by the end of the day.
8.
Rough grade building.
9.
Begin excavation of building foundations, and utilities. Protect open excavations.
Where applicable, place fill on the up-slopes and side edges of fill area. Fill
should be pushed in place and stabilized with tracking perpendicular to the
slope. Place soil stockpiles in locations shown on the Erosion and Sediment
Control Plans and associated Details.
10.
Begin construction of house.
11.
Upon completion of foundation, backfill to grade and immediately stabilize areas
that will not receive traffic or disturbance within seven (7) days.
12.
Begin the excavation and installation of utilities and drainage system. Protect
trenches and open excavations from erosion. All drainage inlets shall be
protected from sediment entering. There shall be no direct unfiltered discharge
into the stormwater systems. The stormwater outlet shall be blocked until all
upstream areas have been permanently stabilized.
13.
During building and site construction maintain and re-establish as required
erosion control and stabilization measures as required by the site plan and
details.
14.
Topsoil, rake, seed and mulch all disturbed areas. Once all proposed
disturbances are completed, begin full stabilization of the site. Once the site has
been stabilized, remove all temporary erosion control measures. This shall be
done during optimum weather conditions to avoid sediment transport. A site
shall be considered stabilized when it has a minimum uniform 80% perennial
vegetation cover or other permanent non vegetative cover with a density
sufficient to resist accelerated surface erosion. Once final stabilization has been
achieved, unblock piping to infiltrators in order to allow flow to enter.
Winter Stabilization Notes:
1.
If construction activities are expected to extend into or occur during the winter
season the contractor shall anticipate proper stabilization and sequencing.
Construction shall be sequenced such that wherever possible areas of
disturbance that can be completed and permanently stabilized shall be done by
52 Upland Lane
period of time shall be treated with temporary seed, mulch, and/or erosion
blankets.
52 Upland Lane
APPENDIX E
Soil Testing Data
52 Upland Lane
APPENDIX F
Hydrologic Analysis
1S
DA-1 (Pre)
3R
Design Point
Routing Diagram for 21-22 Hannigan Residence 4-1-22
Prepared by {enter your company name here}, Printed 4/5/2022
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Subcat
Reach
Pond
Link
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Project Notes
Rainfall events imported from "NRCS-Rain.txt" for 7139 NY Westchester
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event#
Event
Name
Storm Type
Curve
Mode
Duration
(hours)
B/B
Depth
(inches)
AMC
1-Year
NRCC 24-hr
D
Default
24.00
2.78
2-Year
NRCC 24-hr
D
Default
24.00
3.41
5-Year
NRCC 24-hr
D
Default
24.00
4.30
10-Year
NRCC 24-hr
D
Default
24.00
5.13
25-Year
NRCC 24-hr
D
Default
24.00
6.49
50-Year
NRCC 24-hr
D
Default
24.00
7.76
100-Year
NRCC 24-hr
D
Default
24.00
9.28
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Area Listing (selected nodes)
Area
(acres)
CN
Description
(subcatchment-numbers)
5.304
Woods, Fair, HSG B (1S)
5.304
TOTAL AREA
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
0.000
HSG A
5.304
HSG B
1S
0.000
HSG C
0.000
HSG D
0.000
Other
5.304
TOTAL AREA
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Ground Covers (selected nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.000
5.304
0.000
0.000
0.000
5.304
Woods, Fair
1S
0.000
5.304
0.000
0.000
0.000
5.304
TOTAL
AREA
NRCC 24-hr D 1-Year Rainfall=2.78"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>0.20"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=0.35 cfs 0.087 af
Inflow=0.35 cfs 0.087 af
Reach 3R: Design Point
Outflow=0.35 cfs 0.087 af
Total Runoff Area = 5.304 ac Runoff Volume = 0.087 af Average Runoff Depth = 0.20"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 1-Year Rainfall=2.78"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
0.35 cfs @ 12.50 hrs, Volume=
0.087 af, Depth> 0.20"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 1-Year Rainfall=2.78"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
NRCC 24-hr D
1-Year Rainfall=2.78"
Runoff Area=5.304 ac
Runoff Volume=0.087 af
Runoff Depth>0.20"
Flow Length=743'
Tc=23.7 min
CN=60
0.35 cfs
NRCC 24-hr D 1-Year Rainfall=2.78"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 0.20" for 1-Year event
Inflow
=
0.35 cfs @ 12.50 hrs, Volume=
0.087 af
Outflow
=
0.35 cfs @ 12.50 hrs, Volume=
0.087 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
0.38
0.36
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
Inflow Area=5.304 ac
0.35 cfs
0.35 cfs
NRCC 24-hr D 2-Year Rainfall=3.41"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>0.40"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=1.10 cfs 0.175 af
Inflow=1.10 cfs 0.175 af
Reach 3R: Design Point
Outflow=1.10 cfs 0.175 af
Total Runoff Area = 5.304 ac Runoff Volume = 0.175 af Average Runoff Depth = 0.40"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 2-Year Rainfall=3.41"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
1.10 cfs @ 12.41 hrs, Volume=
0.175 af, Depth> 0.40"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 2-Year Rainfall=3.41"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
2-Year Rainfall=3.41"
Runoff Area=5.304 ac
Runoff Volume=0.175 af
Runoff Depth>0.40"
Flow Length=743'
Tc=23.7 min
CN=60
1.10 cfs
NRCC 24-hr D 2-Year Rainfall=3.41"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 0.40" for 2-Year event
Inflow
=
1.10 cfs @ 12.41 hrs, Volume=
0.175 af
Outflow
=
1.10 cfs @ 12.41 hrs, Volume=
0.175 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
1.10 cfs
1.10 cfs
NRCC 24-hr D 5-Year Rainfall=4.30"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>0.76"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=2.59 cfs 0.336 af
Inflow=2.59 cfs 0.336 af
Reach 3R: Design Point
Outflow=2.59 cfs 0.336 af
Total Runoff Area = 5.304 ac Runoff Volume = 0.336 af Average Runoff Depth = 0.76"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 5-Year Rainfall=4.30"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
2.59 cfs @ 12.38 hrs, Volume=
0.336 af, Depth> 0.76"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 5-Year Rainfall=4.30"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
5-Year Rainfall=4.30"
Runoff Area=5.304 ac
Runoff Volume=0.336 af
Runoff Depth>0.76"
Flow Length=743'
Tc=23.7 min
CN=60
2.59 cfs
NRCC 24-hr D 5-Year Rainfall=4.30"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 0.76" for 5-Year event
Inflow
=
2.59 cfs @ 12.38 hrs, Volume=
0.336 af
Outflow
=
2.59 cfs @ 12.38 hrs, Volume=
0.336 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
2.59 cfs
2.59 cfs
NRCC 24-hr D 10-Year Rainfall=5.13"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>1.17"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=4.28 cfs 0.516 af
Inflow=4.28 cfs 0.516 af
Reach 3R: Design Point
Outflow=4.28 cfs 0.516 af
Total Runoff Area = 5.304 ac Runoff Volume = 0.516 af Average Runoff Depth = 1.17"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 10-Year Rainfall=5.13"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
4.28 cfs @ 12.36 hrs, Volume=
0.516 af, Depth> 1.17"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 10-Year Rainfall=5.13"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
10-Year Rainfall=5.13"
Runoff Area=5.304 ac
Runoff Volume=0.516 af
Runoff Depth>1.17"
Flow Length=743'
Tc=23.7 min
CN=60
4.28 cfs
NRCC 24-hr D 10-Year Rainfall=5.13"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 1.17" for 10-Year event
Inflow
=
4.28 cfs @ 12.36 hrs, Volume=
0.516 af
Outflow
=
4.28 cfs @ 12.36 hrs, Volume=
0.516 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
4.28 cfs
4.28 cfs
NRCC 24-hr D 25-Year Rainfall=6.49"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>1.94"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=7.41 cfs 0.858 af
Inflow=7.41 cfs 0.858 af
Reach 3R: Design Point
Outflow=7.41 cfs 0.858 af
Total Runoff Area = 5.304 ac Runoff Volume = 0.858 af Average Runoff Depth = 1.94"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 25-Year Rainfall=6.49"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
7.41 cfs @ 12.35 hrs, Volume=
0.858 af, Depth> 1.94"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 25-Year Rainfall=6.49"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
25-Year Rainfall=6.49"
Runoff Area=5.304 ac
Runoff Volume=0.858 af
Runoff Depth>1.94"
Flow Length=743'
Tc=23.7 min
CN=60
7.41 cfs
NRCC 24-hr D 25-Year Rainfall=6.49"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 1.94" for 25-Year event
Inflow
=
7.41 cfs @ 12.35 hrs, Volume=
0.858 af
Outflow
=
7.41 cfs @ 12.35 hrs, Volume=
0.858 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
7.41 cfs
7.41 cfs
NRCC 24-hr D 50-Year Rainfall=7.76"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>2.75"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=10.64 cfs 1.217 af
Inflow=10.64 cfs 1.217 af
Reach 3R: Design Point
Outflow=10.64 cfs 1.217 af
Total Runoff Area = 5.304 ac Runoff Volume = 1.217 af Average Runoff Depth = 2.75"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 50-Year Rainfall=7.76"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
10.64 cfs @ 12.35 hrs, Volume=
1.217 af, Depth> 2.75"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 50-Year Rainfall=7.76"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
50-Year Rainfall=7.76"
Runoff Area=5.304 ac
Runoff Volume=1.217 af
Runoff Depth>2.75"
Flow Length=743'
Tc=23.7 min
CN=60
10.64 cfs
NRCC 24-hr D 50-Year Rainfall=7.76"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 2.75" for 50-Year event
Inflow
=
10.64 cfs @ 12.35 hrs, Volume=
1.217 af
Outflow
=
10.64 cfs @ 12.35 hrs, Volume=
1.217 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
10.64 cfs
10.64 cfs
NRCC 24-hr D 100-Year Rainfall=9.28"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Time span=1.00-20.00 hrs, dt=0.05 hrs, 381 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=5.304 ac 0.00% Impervious Runoff Depth>3.81"
Subcatchment 1S: DA-1 (Pre)
Flow Length=743' Tc=23.7 min CN=60 Runoff=14.76 cfs 1.683 af
Inflow=14.76 cfs 1.683 af
Reach 3R: Design Point
Outflow=14.76 cfs 1.683 af
Total Runoff Area = 5.304 ac Runoff Volume = 1.683 af Average Runoff Depth = 3.81"
100.00% Pervious = 5.304 ac 0.00% Impervious = 0.000 ac
NRCC 24-hr D 100-Year Rainfall=9.28"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: DA-1 (Pre)
Runoff
=
14.76 cfs @ 12.35 hrs, Volume=
1.683 af, Depth> 3.81"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
NRCC 24-hr D 100-Year Rainfall=9.28"
CN
Description
5.304
Woods, Fair, HSG B
5.304
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(cfs)
19.3
0.0145
0.09
Sheet Flow,
Woods: Light underbrush n= 0.400 P2= 5.13"
4.4
0.2400
2.45
Shallow Concentrated Flow,
Woodland Kv= 5.0 fps
23.7
Total
Subcatchment 1S: DA-1 (Pre)
Runoff
Hydrograph
Time (hours)
NRCC 24-hr D
100-Year Rainfall=9.28"
Runoff Area=5.304 ac
Runoff Volume=1.683 af
Runoff Depth>3.81"
Flow Length=743'
Tc=23.7 min
CN=60
14.76 cfs
NRCC 24-hr D 100-Year Rainfall=9.28"
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Summary for Reach 3R: Design Point
Inflow Area =
5.304 ac,
0.00% Impervious, Inflow Depth > 3.81" for 100-Year event
Inflow
=
14.76 cfs @ 12.35 hrs, Volume=
1.683 af
Outflow
=
14.76 cfs @ 12.35 hrs, Volume=
1.683 af, Atten= 0%, Lag= 0.0 min
Routing by Stor-Ind+Trans method, Time Span= 1.00-20.00 hrs, dt= 0.05 hrs
Reach 3R: Design Point
Inflow
Outflow
Hydrograph
Time (hours)
Inflow Area=5.304 ac
14.76 cfs
14.76 cfs
Multi-Event Tables
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Events for Subcatchment 1S: DA-1 (Pre)
Event
Rainfall
(inches)
Runoff
(cfs)
Volume
(acre-feet)
Depth
(inches)
1-Year
2.78
0.35
0.087
0.20
2-Year
3.41
1.10
0.175
0.40
5-Year
4.30
2.59
0.336
0.76
10-Year
5.13
4.28
0.516
1.17
25-Year
6.49
7.41
0.858
1.94
50-Year
7.76
10.64
1.217
2.75
100-Year
9.28
14.76
1.683
3.81
Multi-Event Tables
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Events for Reach 3R: Design Point
Event
Inflow
(cfs)
Outflow
(cfs)
Elevation
(feet)
Storage
(cubic-feet)
1-Year
0.35
0.35
0.00
2-Year
1.10
1.10
0.00
5-Year
2.59
2.59
0.00
10-Year
4.28
4.28
0.00
25-Year
7.41
7.41
0.00
50-Year
10.64
10.64
0.00
100-Year
14.76
14.76
0.00
Table of Contents
21-22 Hannigan Residence 4-1-22
Printed 4/5/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
TABLE OF CONTENTS
Project Reports
1 Routing Diagram
2 Project Notes
3 Rainfall Events Listing
4 Area Listing (selected nodes)
5 Soil Listing (selected nodes)
6 Ground Covers (selected nodes)
1-Year Event
7 Node Listing
8 Subcat 1S: DA-1 (Pre)
9 Reach 3R: Design Point
2-Year Event
10 Node Listing
11 Subcat 1S: DA-1 (Pre)
12 Reach 3R: Design Point
5-Year Event
13 Node Listing
14 Subcat 1S: DA-1 (Pre)
15 Reach 3R: Design Point
10-Year Event
16 Node Listing
17 Subcat 1S: DA-1 (Pre)
18 Reach 3R: Design Point
25-Year Event
19 Node Listing
20 Subcat 1S: DA-1 (Pre)
21 Reach 3R: Design Point
50-Year Event
22 Node Listing
23 Subcat 1S: DA-1 (Pre)
24 Reach 3R: Design Point
100-Year Event
25 Node Listing
26 Subcat 1S: DA-1 (Pre)
27 Reach 3R: Design Point
Multi-Event Tables
28 Subcat 1S: DA-1 (Pre)
29 Reach 3R: Design Point
2S
DA-1 (Post)
6S
DA-2 (Post)
5R
Design Point (Post)
4P
CHAMBERS
Routing Diagram for 21-22 Hannigan Residence 4-1-22
Prepared by {enter your company name here}, Printed 4/6/2022
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Subcat
Reach
Pond
Link
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Project Notes
Rainfall events imported from "NRCS-Rain.txt" for 7139 NY Westchester
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event#
Event
Name
Storm Type
Curve
Mode
Duration
(hours)
B/B
Depth
(inches)
AMC
1-Year
NRCC 24-hr
D
Default
24.00
2.78
2-Year
NRCC 24-hr
D
Default
24.00
3.41
5-Year
NRCC 24-hr
D
Default
24.00
4.30
10-Year
NRCC 24-hr
D
Default
24.00
5.13
25-Year
NRCC 24-hr
D
Default
24.00
6.49
50-Year
NRCC 24-hr
D
Default
24.00
7.76
100-Year
NRCC 24-hr
D
Default
24.00
9.28
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Area Listing (selected nodes)
Area
(acres)
CN
Description
(subcatchment-numbers)
0.671
>75% Grass cover, Good, HSG B (2S)
0.495
Paved parking, HSG B (2S)
4.138
Woods, Fair, HSG B (2S, 6S)
5.304
TOTAL AREA
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Soil Listing (selected nodes)
Area
(acres)
Soil
Group
Subcatchment
Numbers
0.000
HSG A
5.304
HSG B
2S, 6S
0.000
HSG C
0.000
HSG D
0.000
Other
5.304
TOTAL AREA
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Ground Covers (selected nodes)
HSG-A
(acres)
HSG-B
(acres)
HSG-C
(acres)
HSG-D
(acres)
Other
(acres)
Total
(acres)
Ground
Cover
Subcatchment
Numbers
0.000
0.671
0.000
0.000
0.000
0.671
>75% Grass cover, Good 2S
0.000
0.495
0.000
0.000
0.000
0.495
Paved parking
2S
0.000
4.138
0.000
0.000
0.000
4.138
Woods, Fair
2S, 6S
0.000
5.304
0.000
0.000
0.000
5.304
TOTAL AREA
21-22 Hannigan Residence 4-1-22
Printed 4/6/2022
Prepared by {enter your company name here}
HydroCAD® 10.10-4b s/n 11619 © 2020 HydroCAD Software Solutions LLC
Pipe Listing (selected nodes)
Line#
Node
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft)
n
Width
(inches)
Diam/Height
(inches)
Inside-Fill
(inches)
2S
0.00
0.00
791.0
0.1551
0.012
0.0
8.0
0.0
2S
0.00
0.00
151.0
0.0110
0.012
0.0
8.0
0.0
4P
467.22
466.97
30.0
0.0083
0.012
0.0
18.0
0.0
NRCC 24-hr D 1-Year