WAC Memo to VB re Local Law 1of 2024 Geothermal
local law
2 pages
Meeting: portal event 937 (no meeting page on file)
Agenda item: Public Hearings — Public Hearing to consider Local Law Introductory No. 1 of 2024 to amend Chapter 230, Zoning, of the Village Code to provide for the administration and regulation of geothermal energy systems.
Local law, 2 pages. Attached to agenda item: “Public Hearings — Public Hearing to consider Local Law Introductory No. 1 of 2024 to amend Chapter 230, Zoning, of the Village Code to provide for the administration and regulation of geothermal energy systems.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
CAF - Geothermal
County PB - 24-002 Zoning Text Amendment - Geothermal...
Local Law Intro 1 of 2024 - Geothermal Energy Systems
PB Memo to VB Local Law 1 of 2024
SEAF 1 - Geothermal
Extracted text
Members
STUART GREENBAUM
STEVE KRISKY
IAN W. MURTAUGH
LEO WEIGMAN
Attorney
LINDA WHITEHEAD
Village Engineer
DANIEL O’CONNOR, P.E.
TO: Mayor Brian Pugh and the Village Board of Trustees
FROM: Chairman Simon, Waterfront Advisory Committee
RE: Referral from Village Board for a Local Waterfront Revitalization Program (LWRP)
Consistency review for Local Law Introductory 1 of 2024 to Amend and Update
Provisions of Chapter 230, Zoning of the Village Code to add a new Section 230-
48.3 entitled “Geothermal Energy Systems.
DATE: February 5th, 2024
On January 31st, 2024, the Waterfront Advisory Committee (WAC) reviewed for consistency
with the Village’s Local Waterfront Revitalization Program (LWRP) the referral listed above.
Based on the Committee’s review of the 44 LWRP policies, the Waterfront Advisory Committee
made a recommendation of consistency with the LWRP.
The WAC reviewed the Short Environmental Assessment Form and determined that there were
no changes necessary.
The WAC reviewed the Coastal Assessment Form and no changes were noted.
The committee reviewed the 44 LWRP policies and determined that the following policies are
relevant:
POLICY 1A: Existing planning and zoning documents should be reviewed and amended
where necessary to ensure development within the community is consistent with
adopted goals and policies.
The proposed law provides specific requirements for Geothermal energy systems which will
clarify requirements for this type of technology.
POLICY 6: Expedite permit procedures in order to facilitate the siting of development
activites at suitable locations.
POLICY 6A: To expedite permit procedures, the Village shall coordinate all relevant local
laws into a development package for applicants and/or make all local laws available to
applicants proposing development activities.
The proposed law clarifies requirements for Geothermal Energy Systems and will be available
online after adoption.
POLICY 7F: Construction activity of any kind must not cause a measurable increase in
erosion or flooding at the site of such activity, or impact other locations. Construction
activity shall be timed so that spawning of andadromous fish species and shellfish will
not be adversely affected.
POLICY 11A: Erosion and sediment control measures shall be undertaken in order to
safeguard persons, protect property, prevent damage to the environment, and promote
the public welfare by guiding, regulating and controlling the design, construction, use
and maintenance of any development or other activity which disturbs or breaks the
topsoil.
Plans submitted with the permit application will include requirements for erosion and sediment
control during construction of the geothermal energy system.
It is for the reasons contained in this memorandum that the WAC issues its recommendation of
consistency.
Machine-extracted for search and reference — the original PDF is the authoritative version.