2024 Entry permit Village of Croton on Hudson to MNR re Harmon Yard OUII Remediation
resolution
4 pages
Meeting: portal event 967 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorize the Village Manager to sign a permit for Metro-North to conduct test borings on the property located on Half Moon Bay Drive.
Resolution, 4 pages. Attached to agenda item: “Proposed Resolutions — Consider authorize the Village Manager to sign a permit for Metro-North to conduct test borings on the property located on Half Moon Bay Drive.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Attachment A - Map No. 27839
Attachment B Figure 2- Site Plan Village
June 26th Resolution 139-2024 MTA Agreement
Extracted text
PERMIT TO ENTER UPON PROPERTY
PERMISSION is hereby granted to Metro-North Commuter Railroad
Company, a public benefit corporation and subsidiary of the
Metropolitan Transportation Authority (“MTA”), having an office
at 420 Lexington Avenue, New York, NY 10170,(hereinafter called
"Metro-North") to enter property owned by the Village of Croton-
on-Hudson, a municipal corporation of the State of New York,
having an office and place of business at One Van Wyck Street,
Croton-on-Hudson, New York 10520 (hereinafter called “the
Village”). The purpose of this Entry Permit shall be solely for
the purposes outlined in Section 1 below and under the following
terms and conditions:
1. LOCATION AND ACCESS. Permission is hereby granted to
Metro-North and its contractor(s), to enter the road known as
Half Moon Bay Drive, as depicted on the attached map Number
27839 (Attachment A) filed with the Westchester County Clerk on
November 3, 2006, (hereinafter called the “Property”), for the
advancement of test borings located as noted on map annexed to
this Entry Permit as Attachment B and also known as Site Plan
Depicting Proposed Test Boring Locations. Access for the
advancement of the test borings is anticipated to take up to
five (5) days with no follow up monitoring required. Metro-North
shall at no time impede the Village’s or the public’s access to
the Property.
2. LIABILITY. Metro-North covenants and agrees to at all
times indemnify, protect and save harmless the Village, from and
against any and all losses, damages, detriments, suits, claims,
demands, costs and charges, including without limitation,
reasonable attorneys’ fees, which the Village may directly or
indirectly suffer, sustain or be subjected to by or on account
of Metro-North’s entry upon, occupancy or use of the Property,
or the conduct thereon of Metro-North, its contractors,
subcontractors, officers, employees, agents or invitees during
the term of the Entry Permit.
3. NOTIFICATION TO VILLAGE. Metro-North or its
contractor(s) shall notify the Village or its designee, in
writing at least ten (10) business days in advance before
entering upon or commencing any work upon the Property and keep
Attached as Attachment D is a schedule of the advancement of the
test borings. Any significant change from this schedule will be
immediately communicated in writing to the Village.
4. OPERATIONS. All activities of Metro-North in
connection with this Permit shall be carried on in such a manner
so as not to interfere with the safe operation or use of Half
Moon Bay Drive. Metro-North and its contractor(s) will supply
any and all necessary traffic control, to the reasonable
satisfaction of the Village, during its activities on the
- 2 -
Property.
5. RESTORATION OF PREMISES. Upon completion of Metro-
North’s activities, the Property shall be restored to a
condition satisfactory to the Village, normal wear and tear
excluded if the Property has not been satisfactorily cleared of
all of Metro-North's property (including but not limited to
materials and equipment) and restored to an acceptable
condition, then the Village shall have the right, but not the
obligation, to restore the Property, including the removal of
any materials, equipment and/or fencing, to a satisfactory
condition at Metro-North’s sole cost and expense.
6. TERM OF PERMIT. Unless subsequently modified in
writing, this Entry Permit shall begin after both parties have
executed this Permit (“Execution Date”) and shall terminate one
year after the Execution Date. Under no circumstances shall
this Entry Permit be construed as granting Metro-North any
rights, title or interest of any kind or character in, on, or
about the land or premises of the Village. Metro-North agrees
to notify the Village when use of the Property or work is
completed.
7. NOTICES. Any notice to be served pursuant to this
Entry Permit shall be delivered by hand against a receipt or by
U.S. Certified Mail, Return Receipt Requested, postage pre-paid,
addressed as follows:
If to Village:
Croton on Hudson, New York 10520
If to Metro-North:
Metro-North Commuter Railroad Company
Environmental Compliance and Services
525 North Broadway
White Plains, New York 10603
8. ADDITIONAL PERMISSION(S). Metro-North shall be
responsible for obtaining any additional permission which may be
required.
9. APPLICABLE LAWS. Metro-North, at its sole expense,
shall comply with all Federal and State laws, regulations and
ordinances applicable to the use of the Property.
.
- 3 -
11. ASSIGNMENT. Metro-North shall make no assignment of
this Entry Permit without prior written consent of the Village.
Any such assignment, or attempt to assign, without written
consent of the Village, is void.
12. INSURANCE. Metro-North shall provide the Village with
a letter from the MTA Risk and Insurance Management Department
indicating that Metro-North is self-insured and prior to
entering the Property, shall provide written proof of its
drilling contractor and environmental consultant’s insurance
listing the Village as an additional insured on its General
Liability, Workers’ Compensation and Automobile Liability
Insurance for the term of this Entry Permit.
IN WITNESS WHEREOF, the parties hereto have caused this Entry
Permit to be duly executed as of the day and year indicated
below.
WITNESS:
BY:_____________________________
TITLE:
_________________________
DATE:
- 4 -
WITNESS:
BY:_METRO-NORTH RAILROAD ___
(Permittee)
_________________________
TITLE:________________________
DATE:_________________________
Machine-extracted for search and reference — the original PDF is the authoritative version.