1CrotonPoint Part1EAF rev 20240717
application
31 pages
Meeting: portal event 977 (no meeting page on file)
Agenda item: Old Business — Planning Board discussion of referral from Village Board of Trustees to review a Special Permit Application from WPB Development LLC to construct a 100-unit residential building located at 1-3 Croton Point Avenue and Lot A (79.17-1-3,4,5)
Application, 31 pages. Attached to agenda item: “Old Business — Planning Board discussion of referral from Village Board of Trustees to review a Special Permit Application from WPB Development LLC to construct a 100-unit residential building located at 1-3 Croton Point”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2024-08-01 Croton Point Village Submission Full Set SS
Architectural Plans 240806 1CrotonPoint PlanningBoard
Croton Point CAF
Draft Memo to VB - 1-3 Croton Point Ave and Parking Lot A
Planning Board Review of Special Permits
SWPPP24154 080124 SS
VB Resolution
WBP 1 Croton Point Cover Letter Application for Special Permit
wer24154 071124 REV
wwer24154 071124 REV
Extracted text
Part 1 ENVIRONMENTAL ASSESSMENT FORM (EAF)
Prepared For Submission To:
Village of Croton-on-Hudson Village Board
Applicant:
Prepared By:
Revised July 16, 2024
1 CROTON POINT
PART 1 ENVIRONMENTAL ASSESSMENT FORM (EAF)
1. PROJECT DESCRIPTION
2. PART 1 ENVIRONMENTAL ASSESSMENT FORM (EAF)
3. COASTAL ASSESSMENT FORM (CAF)
PARTICIPATING CONSULTANTS
Environmental Planning – SEQRA
KSCJ Consulting
500 Main Street, Armonk, NY 10504
(914) 273-2323
Contact: Jan K. Johannessen, RLA, AICP
Civil Engineering and Surveying
Insite Engineering, Surveying & Landscape Architecture, P.C.
3 Garrett Place, Carmel, NY 10512
(845) 225-9690
Contact: Richard D. Williams Jr., P.E.
Architecture
Arketekcher
6 Americo Circle, Ossining, NY 10562
(914) 762-3936
Contact: Michael Bevivino, AIA, NCARB
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
WBP Development, LLC has been selected by the Village of Croton-on-Hudson as the purchaser and
developer of Village Parking Lot A (Tax Lots 3 and 5) and is in contract to purchase Tax Lot 4 from Croton
Point Realty, Inc. Collectively, the subject property is proposed to be developed with a 5-story, 100 unit,
affordable multifamily building with amenity space and on-site parking; units are proposed to be in
condominium ownership.
Subject Property
The subject property or “the site” consists of several tax parcels totaling 1.7578 acres of land and located
on Croton Point Avenue within the Village of Croton-on-Hudson, Westchester County, NY. The signalized
intersection of Croton Point Avenue and Veterans Plaza is located immediately south of the site and the
remainder of the site is bounded by NYS Route 9 to the east, Metro North Railroad to the west, and
additional Metropolitan Transportation Authority (MTA) uses to the north. The Route 9 and Croton Point
Avenue signalized intersection is located southeast of the subject property and the site is in proximity to
the Croton-Harmon train station and the MTA train depot. While the subject property is bordered by
transportation, parking, commercial and light industrial uses, the site is a short distance to a variety of
retail, restaurant, shopping centers, supermarket, physical training, and other active uses. A pedestrian
and bicycle path exists on the west side of Route 9 and extends from Croton Point Avenue over the Croton
River to Ossining. Further, the site is in proximity to Croton Point Park and other recreational areas.
Perhaps the most intriguing feature is the site’s proximity to the Hudson River, located due west, the
views of which will be enjoyed by future homeowners.
There are several easements that encumber the site that benefit either the MTA or the Village of Croton-
on-Hudson which are well described within the Village’s Request for Proposal (RFP) and are depicted on
the surveys and site development plans submitted in conjunction with this Environmental Assessment
Form (EAF).
Previous Planning Efforts and RFP
Following a thorough evaluation under the State Environmental Quality Review Act (SEQRA), which
included the preparation of a Full EAF, buildout analysis, traffic impact study, visual analysis, evaluation
of school children generated, LWRP Consistency Review, and County Planning referral, the Village Board
of Trustees adopted Local Law No. 14 of 2022 which allows the site to be redeveloped with multifamily
housing or multifamily housing over ground floor commercial uses at a maximum Floor Area Ratio (FAR)
of 1.2 and a maximum height of up to 5-stories. Following the adoption of the zoning amendment, the
Village Board prepared and released an RFP which was issued on July 24, 2023 to solicit proposals from
the development community for purchase and development of the subject property. In response to the
Village’s RFP, WBP Development, LLC submitted its proposal to purchase and develop the site, consistent
with the underlying zoning and RFP, which was ultimately accepted by the Village Board via Resolution
No. 86-2024, dated April 24, 2024.
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
Zoning
The subject property is zoned Transit-Oriented Development in Light Industrial (LI) District which allows
the proposed use subject to the issuance of a Special Use Permit from the Village Board of Trustees and
Site Plan Approval from the Planning Board, in addition to other necessary permits, approvals and referrals
by other involved agencies. The proposed redevelopment complies with the development requirements
presented in Local Law 14 of 2022 for TOD projects and additional design parameters as outlined in the
Village Board’s RFP. The project is consistent with the underlying zoning regulations, the RFP and the
Village’s Comprehensive Plan.
BULK ZONING REQUIREMENTS PER LOCAL LAW NO. 14 OF 2022
Min. Lot Area
10,000 s.f.
Front Yard Setback
As determined by Village Board
during review of Special Use Permit
Rear Yard Setback
One Side Yard
Both Side Yards
Off-Street Parking per Unit
1 space per unit
Floor Area Ratio
1.20
Building Height (stories)
5 Stories
Bedrooms
Studio, 1- and 2-bedroom units only
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
DEVELOPMENT REGULATIONS PROVIDED WITHIN RFP
As stated previously, the development includes the construction of a compliant 5-story building with cellar
level for parking below grade. It offers 100 units consisting of 46 one-bedroom and 54 two-bedroom units;
the proposed FAR is 1.10, where 1.20 is the maximum allowed. The design includes 100 parking spaces,
as required, provided via a combination of surface and below-building parking. Amenities within the
building include a community room, fitness center, coworking lounge, bike storage room, and a rooftop
deck that provides scenic views overlooking Croton Point Bay and the Hudson River. The exterior façade
combines brick and metal panels for cladding. Sustainable building design features include full
electrification, solar readiness, high efficiency HVAC equipment (cold climate air source heat pumps) and
appliances (Energy Star Multifamily New Construction Program), Level 2 EV charging stations (1 per 20
parking spaces) and low-flow water fixtures.
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
Utilities (Water, Sewer and Stormwater)
Domestic water, in addition to water for fire protection, is proposed to be served by the Village’s municipal
water system. As currently designed, the proposed action includes the installation of two (2) water service
connections to the existing water main located in Croton Point Avenue, one for domestic water and the
second for fire flow. The applicant is in the process of evaluating whether an extension of the existing 10-
inch water main on Wayne Street will be necessary to meet project water demands.
The applicant has evaluated water demand using both NYSDEC Design Flow standards, which are known
to be conservative, as well as flow rates from the American Water Works Associated (AWWA), which are
generally more realistic. While the NYSDEC standards are used for design, they are considered theoretical
maximums; the values are conservative and do not reflect actual water usage. For instance, the total
water flow in gallons per day assumes all on-site uses are in full operation, at the same time and are at
full occupancy, all day, every day. Further, the applicant intends to install low flow fixtures within the
building to reduce water demand. Water demand calculations from both sources are presented in the
below tables.
ESTIMATED WATER DEMAND BASED ON NYSDEC DESIGN FLOW STANDARDS
Proposed Use
No. of Units
Hydraulic Loading Rate
Maximum Design Flow (gpd)
One Bedroom Unit
110 gpd/bedroom
5,060
Two Bedroom Unit
110 gpd/bedroom
11,880
Total
16,940
Source: Insite Engineering
ESTIMATED WATER DEMAND BASED ON AWWA
Proposed Use
Occupancy
Rate
Total Anticipated
Residents
Water Use Per
Resident
Water Use
(gpd)
46-One Bedroom Unit
1.86
people/unit
43.5
3,741
54-Two Bedroom Unit
1.88
people/unit
43.5
4,437
Total Anticipated Water Generated (gpd)
8,178
Source: Insite Engineering
Sanitary sewer demand is estimated based on the water usage of the site and, as identified above, is
estimated to be 16,940 gpd, a conservative estimate. As illustrated on the site development plans, the
applicant proposes to install an on-site wastewater pump station and valve pit that will connect to the
building’s gravity sewer system; the on-site pump station will connect to the existing force main in Croton
Point Avenue that is owned by Westchester County.
The site is almost entirely developed with impervious cover (surface parking and buildings) and
stormwater runoff, in the existing condition, flows in one of two directions. Approximately half of the site
flows to the south to an existing on-site drain inlet that connects to the New York State Department of
Transportation (NYSDOT) drainage system along NYS Route 9. The remaining portion of the site flows to
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
Page | 5
KSCJ CONSULTING
the north toward property owned by the MTA. The project is considered a redevelopment project under
the New York State Department of Environmental Conservation’s (NYSDEC) stormwater regulations and
based on the proposed overall reduction in impervious surfaces, will result in a net decrease in flows
leaving the site; therefore, attenuation of stormwater on-site is not required. Water quality treatment is
proposed in the form of hydrodynamic separators which will treat stormwater before discharging off-site.
Traffic
Reference is made to a Traffic Study prepared by AKRF, Inc., dated July 6, 2022, which was prepared during
the SEQRA evaluation associated with TOD/LI Zoning Amendments, considered at the same time as the
Harmon/South Riverside Gateway (HSGR) Overlay. The traffic study assessed the potential traffic and
transportation impacts related to the theoretical maximum buildout projected under both zoning
amendments. The theoretical maximum buildout for the zoning study area projected in the traffic report
totals 470 residential units, 21,831 s.f. of ground floor commercial, and 725 off-street parking spaces. The
proposed action includes 100 residential units, 100 off-street parking spaces and no ground floor
commercial space. Assuming the theoretical buildout of the zoning study area by 2042, the traffic report
concludes that the following intersections could experience traffic impacts. However, the report
concludes that impacts can be mitigated via traffic signal timing adjustments, pavement/lane restriping,
and narrowing of roadway medians, as applicable based on location. The extent of signal timing
adjustment will be more thoroughly evaluated during the review process.
▪
Croton Point Avenue and Veterans Plaza
▪
Croton Point Avenue and Route 9/9A Southbound ramps
▪
South Riverside Avenue and Benedict Boulevard
Utilizing the Institute of Transportation Engineers (ITE) Trip Generation manual for a “High-Rise
Condominium/Townhouse” development (Land Use 232), the proposed 100-unit development would be
expected to generate 34 total vehicle trips (entering and exiting) in the AM peak hour, 38 total trips in the
PM peak hour and 35 total trips in the Saturday peak hour. Vehicle trips are anticipated to be reduced
given the project’s proximity to public transportation, including bus and railroad, as well as existing
pedestrian connectivity.
July 11, 2024; Rev. July 16, 2024 Croton Point – Environmental Assessment Form (EAF)
Page | 6
KSCJ CONSULTING
Permits, Approvals, Referrals and Funding
The below table identifies the permits, approvals, and referrals that will be required for ultimate
construction of the proposed action as well as anticipated funding sources.
REQUIRED PERMITS, APPROVALS, REFERRALS AND FUNDING SOURCES
Permits and Approvals
Croton-on-Hudson Village Board of Trustees
Special Use Permit
Croton-on-Hudson Planning Board
Site Plan
Croton-on-Hudson Building Department
Building Permit
Croton-on-Hudson Department of Public Works (DPW)
Driveway, Water and Sewer
Westchester County Department of Health (WCDH)
Water and Sewer
Westchester County Department of Environmental
Facilities (WCDEF)
Sanitary Sewer Connection
New York State Department of Environmental
Conservation (NYSDEC)
SPDES General Permit for Stormwater
Discharges from Construction Activity
(GP-0-20-001)
New York State Department of Transportation (NYSDOT)
Potential Signal Timing Adjustments
Metropolitan Transportation Authority (MTA)
Stormwater Conveyance
Mandatory Referrals for Review and Recommendation
Croton-on-Hudson Waterfront Advisory Committee
LWRP Consistency Review
Croton-on-Hudson Advisory Board on Visual Environment Visual/Aesthetics Review
Westchester County Planning Board
GML 239-m Referral
Funding Sources
NYSHCR’s Affordable Homeownership Opportunity Program (AHOP)
Westchester County’s New Home Land Acquisition Fund (NHLA)
PART 1 ENVIRONMENTAL ASSESSMENT FORM (EAF)
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information
contained in Part 1is accurate and complete.
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
E-Mail:
State:
Project Contact (if not same as sponsor; give name and title/role):
E-Mail:
State:
E-Mail:
State:
*The owner of Tax Lot 3 is Croton Point Realty, Inc.
(Tax Lots 3 & 5)
1 Croton Point Avenue, Croton-on-Hudson, N.Y.
WBP Development, LLC has been selected by the Village of Croton-on-Hudson as the purchaser and developer of Village Parking Lot A (Tax Lots 3 and
5) and is in contract to purchase Tax Lot 4 from Croton Point Realty, Inc. Collectively, the property is proposed to be re-developed with a 5-story, 100 unit,
affordable multifamily building with amenity space and on-site parking; units are proposed to be in condominium ownership. The property is located within
the Transit-Oriented Development in Light Industrial (LI) District and is currently developed with surface parking and a commercial building located at the
southeastern corner of the site. See attached Project Description for more information.
(914) 610-3638
jbainlardi@wbpdev.com
480 Bedford Road
Chappaqua
NY
John R. Bainlardi, Vice President, WBP Development, LLC
Village of Croton-on-Hudson
914-271-4781
managersoffice@crotononhudson-ny.gov
1 Van Wyck Street
Croton-on-Hudson
NY
B. Government Approvals
B. Government Approvals, Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program?
iii. Is the project site within a Coastal Erosion Hazard Area?
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the
9 Yes 9 No
only approval(s) which must be granted to enable the proposed action to proceed?
•
If Yes, complete sections C, F and G.
•
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site
9 Yes 9 No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action
9 Yes 9 No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway;
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, 9 Yes 9 No
or an adopted municipal farmland protection plan?
Village Board - Special Use Permit
July 11, 2024
Planning Board - Site Plan
Waterfront Advisory Committee; Advisory Board
on Visual Environment; Village DPW
WCDH; WCDEF, Westchester County Planning;
funding through Westchester County NHLA
MTA - Stormwater Conveyance
NYSDEC (SPDES); NYSDOT; funding from NYS
Homes and Community Renewal (NYSHCR)
Local Waterfront Revitalization Program (LWRP) Coastal Area which encompasses the entire Village
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.
If Yes, what is the zoning classification(s) including any applicable overlay district?
b. Is the use permitted or allowed by a special or conditional use permit?
c. Is a zoning change requested as part of the proposed action?
If Yes,
i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
c. Which fire protection and emergency medical services serve the project site?
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
b. a. Total acreage of the site of the proposed action?
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor?
c. Is the proposed action an expansion of an existing project or use?
i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________
Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
9 Yes 9 No
_____ months
_____
_____ month _____ year
e. Will the proposed action be constructed in multiple phases?
•
Total number of phases anticipated
•
Anticipated commencement date of phase 1 (including demolition)
•
Anticipated completion date of final phase
_____ month _____year
•
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Transit-Oriented Development in Light Industrial (LI) District (Section 230-18c(9) of the Village Zoning Code)
Croton-Harmon Union Free School District
Village of Croton-on-Hudson Police Department
Village of Croton-on-Hudson Volunteer Fire Department; Village of Croton-on-Hudson Emergency Medical Services
The Village contains many parks and open spaces that would be available to the residents; however, Croton Point Park, Senasqua Park, and Duck Pond
Park and the closest parks to the project site
1.7578
1.52
1.7578
+/-24
Multifamily Residential/Transient-Oriented Development
f. Does the project include new residential uses?
g. Does the proposed action include new non-residential construction (including expansions)?
If Yes,
i. Total number of structures ___________
ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any
9 Yes 9 No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment: ________________________________________________________________________________
ii. If a water impoundment, the principal source of the water: 9 Ground water 9 Surface water streams 9 Other specify:
iii. If other than water, identify the type of impounded/contained liquids and their source.
Volume: ____________ million gallons; surface area: ____________ acres
v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
•
Volume (specify tons or cubic yards): ____________________________________________
•
Over what duration of time? ____________________________________________________
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
iv. Will there be onsite dewatering or processing of excavated materials?
v. What is the total area to be dredged or excavated? _____________________________________acres
vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment
9 Yes 9 No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
Site excavation required to construct the project; no dredging proposed
+/- 12,000 c.y.
Excavation to be completed during a single phase of +/- 24 months
Excavated materials include existing features to be demolished, soil, and subsurface materials
Potential dewatering of excavations. If needed, sediment laden water will be appropriately treated before discharge
+/- 1.52
+/- 1.52
+/- 16
Any non-developed surfaces disturbed during construction will be restored with landscaping, vegetation or other acceptable stabilized surfaces
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
Will the proposed action cause or result in disturbance to bottom sediments?
iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation?
If Yes:
•
acres of aquatic vegetation proposed to be removed: ___________________________________________________________
•
expected acreage of aquatic vegetation remaining after project completion:________________________________________
•
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
•
proposed method of plant removal: ________________________________________________________________________
•
if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?
If Yes:
i. Total anticipated water usage/demand per day: __________________________ gallons/day
ii. Will the proposed action obtain water from an existing public water supply?
If Yes:
•
Name of district or service area: _________________________________________________________________________
•
Does the existing public water supply have capacity to serve the proposal?
•
Is the project site in the existing district?
•
Is expansion of the district needed?
•
Do existing lines serve the project site?
iii. Will line extension within an existing district be necessary to supply the project?
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
•
Source(s) of supply for the district: ________________________________________________________________________
iv. Is a new water supply district or service area proposed to be formed to serve the project site?
•
Applicant/sponsor for new district: ________________________________________________________________________
•
Date application submitted or anticipated: __________________________________________________________________
•
Proposed source(s) of supply for new district: _______________________________________________________________
v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?
If Yes:
i. Total anticipated liquid waste generation per day: _______________ gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?
If Yes:
•
Name of wastewater treatment plant to be used: _____________________________________________________________
•
Name of district: ______________________________________________________________________________________
•
Does the existing wastewater treatment plant have capacity to serve the project?
•
Is the project site in the existing district?
•
Is expansion of the district needed?
Per NYSDEC Standards - 16,940
Croton-on-Hudson
Potential extension of the Wayne Street water main to Croton Point Avenue to serve the project - to be determined if necessary
16,940
Sanitary wastewater
Ossining WWTP
Ossining
9 Yes 9 No
•
Do existing sewer lines serve the project site?
•
Will a line extension within an existing district be necessary to serve the project?
If Yes:
•
Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?
If Yes:
•
Applicant/sponsor for new district: ____________________________________________________________________
•
Date application submitted or anticipated: _______________________________________________________________
•
What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point
9 Yes 9 No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii. Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
•
If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
•
Will stormwater runoff flow to adjacent properties?
iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel
9 Yes 9 No
combustion, waste incineration, or other processes or operations?
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,
9 Yes 9 No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet
9 Yes 9 No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
•
___________Tons/year (short tons) of Carbon Dioxide (CO2)
•
___________Tons/year (short tons) of Nitrous Oxide (N2O)
•
___________Tons/year (short tons) of Perfluorocarbons (PFCs)
•
___________Tons/year (short tons) of Sulfur Hexafluoride (SF6)
•
___________Tons/year (short tons) of Carbon Dioxide equivalent of Hydroflourocarbons (HFCs)
•
___________Tons/year (short tons) of Hazardous Air Pollutants (HAPs)
76,569
61,420
* Proposed net reduction of +/-0.23 acre of impervious coverage
* Air emissions would primarily occur during the construction phase from construction equipment
None proposed
1.41
1.757
Building roof, parking lot, driveway, walkways, terraces replacing existing buildings, driveways and parking
areas
Connect to the existing NYSDOT and MTA drainage systems
The existing NYSDOT and MTA drainage systems ultimately discharge to the Hudson River
From construction related euipment (trucks, excavators, bulldozers,etc.)
From stationary construction related equipment such as generators, if needed
The proposed use is residential and will be heated and cooled with electricity
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,
9 Yes 9 No
landfills, composting facilities)?
If Yes:
i. Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as
9 Yes 9 No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial
9 Yes 9 No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply):
Randomly between hours of __________ to ________.
ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks): _____________
iii.
iv.
v.
Does the proposed action include any shared use parking? Yes No
9 Yes 9 No
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric
9 Yes 9 No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing
9 Yes 9 No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand
9 Yes 9 No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
iii. Will the proposed action require a new, or an upgrade, to an existing substation?
l. Hours of operation. Answer all items which apply.
•
Monday - Friday: _________________________
•
Monday - Friday: ____________________________
•
Saturday: ________________________________
•
Saturday: ___________________________________
•
Sunday: _________________________________
•
Sunday: ____________________________________
•
Holidays: ________________________________
•
Holidays: ___________________________________
If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
*The below information is being provided for informational purposes
Section 160-4G of the Village Noise ordinance allows construction related noise between 8am-8pm (M-Sa.
and 10am-6pm Su.)
*Question relates to open-air operation, post-construction
Not applicable - Residential
+/-159
59 space decrease
Modification of existing curb cuts on Croton Point Avenue for access and circulation
To be determined
Local utility (Con Edison); building will be designed "solar ready"; potential photovoltaic system
8am - 8pm
8am - 8pm
10am - 6pm
None
12AM-12PM
12AM-12PM
12AM-12PM
12AM-12PM
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,
9 Yes 9 No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?
n. W
th
ill
prop
e
os
actio
ed
hav
n
e outd
ligh
oor
ting?
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?
o. Does the proposed action have the potential to produce odors for more than one hour per day?
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p.
Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
ii. Volume(s) ______ per unit time ___________ (e.g., month, year)
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,
9 Yes 9 No
insecticides) during construction or operation?
If Yes:
ii. Will the proposed action use Integrated Pest Management Practices?
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal
9 Yes 9 No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
•
Construction: ____________________ tons per ________________ (unit of time)
•
Operation : ____________________ tons per ________________ (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii. Proposed disposal methods/facilities for solid waste generated on-site:
•
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
•
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
*Not Applicable - Proposed Use is Residential
*Not Applicable - Proposed Use is Residential
While the site is located adjacent to the Croton-Harmon railroad station and NYS Route 9, construction related noise will result during construction hours;
noise sources will be from typical construction related equipment
Existing site is developed with buildings and surface parking
Typical building mounted and parking lot pole mounted light fixtures; a lighting plan will be prepared
Existing site is developed with buildings and surface parking
s. Does the proposed action include construction or modification of a solid waste management facility?
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii. Anticipated rate of disposal/processing:
•
________ Tons/month, if transfer or other non-combustion/thermal treatment, or
•
________ Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: ________________________________ years
t. Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous 9 Yes 9 No
waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
b. Land uses and covertypes on the project site.
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
•
Roads, buildings, and other paved or impervious
surfaces
•
Forested
•
Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
•
Agricultural
(includes active orchards, field, greenhouse etc.)
•
Surface water features
(lakes, ponds, streams, rivers, etc.)
•
Wetlands (freshwater or tidal)
•
Non-vegetated (bare rock, earth or fill)
•
Other
Describe: _______________________________
________________________________________
Transportation - Railroad
Office, retail, automotive and services business are located in the project vicinity.
1.64
1.41
-0.23
0.09
0.08
-0.01
Lawn and Landscaping
0.03
0.27
+0.24
c. Is the project site presently used by members of the community for public recreation?
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed
9 Yes 9 No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
e. Does the project site contain an existing dam?
If Yes:
•
Dam height:
•
Dam length:
•
Surface area:
•
Volume impounded: _______________________________ gallons OR acre-feet
ii. Dam=s existing hazard classification: _________________________________________________________________________
iii. Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,
9 Yes 9 No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
•
If yes, cite sources/documentation: _______________________________________________________________________
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin
9 Yes 9 No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any
9 Yes 9 No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site
9 Yes 9 No
Remediation database? Check all that apply:
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
360010, 546031
360010: Harmon Railroad Yard Waste Area-Active State Superfund-Remedial efforts ongoing
546031: Hudson River PCB Sediments - Active State Superfund-Remediation efforts ongoing
v. Is the project site subject to an institutional control limiting property uses?
•
If yes, DEC site ID number: ____________________________________________________________________________
•
Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
•
Describe any use limitations: ___________________________________________________________________________
•
Describe any engineering controls: _______________________________________________________________________
•
Will the project affect the institutional or engineering controls in place?
•
Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?
b. Are there bedrock outcroppings on the project site?
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: 9 Well Drained:
f. Approximate proportion of proposed action site with slopes: 9 0-10%:
g. Are there any unique geologic features on the project site?
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,
9 Yes 9 No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site?
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,
9 Yes 9 No
state or local agency?
iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
•
Streams:
•
Lakes or Ponds: Name ____________________________________________ Classification _______________________
•
Wetlands:
•
Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired
9 Yes 9 No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floo dway?
j. Is the project site in the 100-year Floodplain?
k. Is the project site in the 500-year Floodplain?
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?
If Yes:
*Hudson River is +/-870 feet from project site and is separated by roads, buildings and parking
*Per on-site soil borings; see
Geotech Report
*Per on-site soil borings; see Geotech Report
*Per on-site soil borings;
see Geotech Report
>50
Coarse to fine sand with varying
amounts of silts and gravel (alluvial
deposits)
+/-30-33
Principal Aquifer, Primary Aquifer
m. Identify the predominant wildlife species that occupy or use the project site:
n. Does the project site contain a designated significant natural community?
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii. Source(s) of description or evaluation: ________________________________________________________________________
iii. Extent of community/habitat:
•
Currently:
•
Following completion of project as proposed: _____________________ acres
•
Gain or loss (indicate + or -):
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as
9 Yes 9 No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of
9 Yes 9 No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to
9 Yes 9 No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?
i. If Yes: acreage(s) on project site? ___________________________________________________________________________
ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National
9 Yes 9 No
Natural Landmark?
If Yes:
ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?
If Yes:
If Yes:
i.
If Yes:
*Response is auto-generated by EAF Mapper; the site is nearly entirely covered with surface parking and/or buildings
*Response is auto-generated by EAF Mapper; the site is almost entirely covered with surface parking and/or buildings
Response is auto-generated by EAF Mapper - NYSDEC
Typical suburban species -
Site is developed
Brackish Subtidal Aquatic Bed
596.57
596.57
None
Shortnose Sturgeon, Northern Harrier, Bald Eagle, Atlantic Sturgeon
The Hudson River and Croton River is located within the vicinity of the site and are used for recreational fishing
Hudson River
Exceptional or unique character
Agency:Westchester County, Date:1-31-90
EAF Mapper Summary Report
Monday, July 8, 2024 12:56 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources in order
to obtain data not provided by the Mapper. Digital data is not a
substitute for agency determinations.
Yes
B.i.ii [Local Waterfront Revitalization Area]
Yes
C.2.b. [Special Planning District]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Listed]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Site]
Yes
E.1.h.iii [Within 2,000' of DEC Remediation
Site - DEC ID]
360010, 546031
E.2.g [Unique Geologic Features]
No
E.2.h.i [Surface Water Features]
No
E.2.h.ii [Surface Water Features]
No
E.2.h.iii [Surface Water Features]
No
E.2.h.v [Impaired Water Bodies]
No
E.2.i. [Floodway]
No
E.2.j. [100 Year Floodplain]
No
E.2.k. [500 Year Floodplain]
No
E.2.l. [Aquifers]
Yes
E.2.l. [Aquifer Names]
Yes
Full Environmental Assessment Form - EAF Mapper Summary Report
E.2.n.i [Natural Communities - Name]
Brackish Subtidal Aquatic Bed
E.2.n.i [Natural Communities - Acres]
596.57
E.2.o. [Endangered or Threatened Species]
Yes
E.2.o. [Endangered or Threatened Species -
Name]
Shortnose Sturgeon, Northern Harrier, Bald Eagle, Atlantic Sturgeon
E.2.p. [Rare Plants or Animals]
No
E.3.a. [Agricultural District]
No
E.3.c. [National Natural Landmark]
No
E.3.d [Critical Environmental Area]
Yes
E.3.d [Critical Environmental Area - Name]
Reason]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
Yes
E.3.i. [Designated River Corridor]
No
Full Environmental Assessment Form - EAF Mapper Summary Report
1 CROTON POINT
COASTAL ASSESSMENT FORM (CAF)
A. INSTRUCTIONS (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction) _____________________________________________
b) Financial assistance (e.g. grant, loan, subsidy) ______________________________
c) Permit, approval, license, certification _____________________________________
d) Agency undertaking action ______________________________________________
2. Describe nature and extent of action: _________________________________________
3. Location of actions: _______________________________________________________
(street or site description)
Financial assistance by NYSHCR and Westchester County
Village Special Use Permit and Site Plan Approvals
Croton-on-Hudson Village Board of Trustees and Planning Board
1 Croton Point Avenue, just north of the Croton Point Avenue and Veterans Plaza intersection
WBP Development, LLC has been selected by the Village as the purchaser and developer of Village
Parking Lot A (Tax Lots 3 and 5) and is in contract to purchase Tax Lot 4 from Croton Point Realty,
Inc. Collectively, the property is proposed to be developed with a 5-story, 100 unit, affordable
multifamily building with amenity space and on-site parking; units are proposed to be in condominium
ownership. The property is located within the Transit-Oriented Development in Light Industrial (LI)
District and is currently developed with surface parking and a commercial building located at the
Collectively 1.7578 acres
Surface parking and 2-story commercial building (office)
Transit-Oriented Development in Light Industrial (LI) District (Section 230-18.c(9))
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations):
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
If yes, which state or federal agency? ___________________________
12. If the proposed action is a law, or planning or zoning document, SKIP Section “C” and go to Section “E”.
YES
NO
N/A
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon any of the resource
areas identified on the coastal area map:
b) Scenic resources of local or statewide significance?
c) Natural protective features in an erosion hazard area?
If the answer to any question above is "yes", please explain in Section D any measures which will be
undertaken to mitigate any adverse effects.
*Section skipped as directed above
*Hudson River is +/-870 feet and the Croton River is +/- 1,960 feet from project site and both are separated by roads,
buildings and parking
None present - site is relatively flat and is developed with surface parking and a commercial building
None within the project area
None
None
WBP Development, LLC
480 Bedford Road, Chappaqua, NY 10514
610-3638
X
NYSHCR's Affordable Homeownership Opportunity Program (AHOP)
X
X
X
X
YES
NO
N/A
2. Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ _____ _____
b) Scenic quality of the coastal environment?
c) Development of future or existing water dependent uses?
e) Land or water uses within a small harbor area?
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
e) Mining, excavation, filling or dredging in coastal waters?
f) Reduction of existing or potential public access to or along
the shore?
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
h) Development within a designated flood or erosion hazard area? _____ _____ _____
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
j) Construction or reconstruction of erosion protective structures? _____ _____ _____
k) Diminished surface or groundwater quality?
l) Removal of ground cover from the site?
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4.
Project
YES
NO
N/A
a) If project is to be located adjacent to shore:
2. Will public access to the foreshore be provided?
3. Does the project require a waterfront site?
4. Does it supplant a recreational or maritime use?
5. Do essential public services and facilities presently exist at
or near the site?
6. Is it located in a flood prone area?
7. Is it located in an area of high erosion?
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and industrial facilities into coastal facilities?
2. If located in the foreshore, will access to those and adjacent
lands be provided?
3. Will it involve the siting and construction of major energy
facilities?
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
c) Is the project site presently used by the community neighborhood
as an open space or recreation area?
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
e) Is the project site presently used for commercial fishing or fish
processing?
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
h) Will the project involve any waste discharges into coastal waters? _____ _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
k) Does the project involve shipment or storage of petroleum
products?
* A portion of the site is owned by the Village and is in contract for sale to the applicant
*Connect to the existing municipal sewer system
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4. Project (continued)
YES
NO
N/A
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
m) Does the project involve or change existing ice management
practices?
n) Will the project affect any area designated as a tidal or
freshwater wetland?
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
For questions answered “yes” in Section C, explain methods you will undertake to reduce adverse
effects. Review the LWRP to see if the project is consistent with each policy. List policies the
project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
X
x
x
x
x
x
x
According to NYSDEC standards for assessing water demand, which are conservative,
the project will generate 16,940 gallons of wastewater per day. Connection to the
existing County sewer system will be made and no anticipated impacts to the sewer
system are anticipated.
The final version of this form shall be sent to the Department of State (New York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any question
in Section C is answered “yes” and either of the following conditions is met.
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Jan K. Johannessen, RLA, AICP
Principal, KSCJ Consulting
273-2323
July 11, 2024
jjohannessen@kscjconsulting.com