croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

98 Hastings Zoning Drawings 2022 - Copy

map survey 4 pages Scanned/OCR — text may contain errors
Meeting: portal event 996 (no meeting page on file)
Agenda item: NEW BUSINESS — Snilsberg, Thor, Owner- 98 Hastings Ave.---Located in a RA-5 Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 79.13 Block 3 Lot 5. Request for the re-approval of a side yard variance and total side yard variance from Section 230-33A for a proposed extension of a front porch.
Map / plans, 4 pages. Attached to agenda item: “NEW BUSINESS — Snilsberg, Thor, Owner- 98 Hastings Ave.---Located in a RA-5 Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 79.13 Block 3 Lot 5. Request for the re-approv” (Text recovered by OCR — may contain errors.)
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 98 Hastings 2024 ZBA Application Redacted 98 Hastings DRAFT RESOLUTION 2024 98 Hastings Survey Existing Dwelling Pics Neighboring Dwellings and Street View Pics
| THESE GENERAL NOTES SHALL APPLY TO ALL DRAWINGS IN 18. ALL INSTALLED PLUMBING, MECHANICAL AND ELECTRICAL GENERAL NOTES ¢ ecg THIS SET AND SHALL EXTEND TO ANY CHANGES, EXTRAS, OR EQUIPMENT SHALL OPERATE QUIETLY AND FREE OF VIBRATION. A-| ERONT PORC 4 ADDITIONS AGREED TO DURING THE COURSE OF THE WORK. DR AW ING L IST 2. DONOT SCALE DRAWINGS: DIMENSIONS SHALL GOVERN. DETAILS 19. THE CONTRACTOR SHALL BE REQUESTED TO PROVIDE SAMPLES AND ENTRY SHALL GOVERN OVER PLANS AND ELEVATIONS, LARGE SCALE LISTED BELOW. NO MATERIALS SHALL BE USED WHICH DO NOT DETAILS SHALL GOVERN OVER SMALL SCALE DETAILS. EQUAL THE APPROVED SAMPLE. UNTIL SUCH APPROVAL HAS BEEN PLOT PL AN A _ ? AL TE R AT | ONS GIVEN, ANY MATERIAL TO BE $0 APPROVED MUST NOT BE 3. THERE WILL BE NO SUBSTITUTION OF MATERIALS WHERE FABRICATED OR INCORPORATED IN THE WORK. THE APPROVAL OF ZONING ANA L S| MANUFACTURER IS SPECIFIED. WHERE THE TERM 'OR EQUAL' SAMPLES WILL NOT PRECLUDE THE REJECTION OF ANY MATERIAL = gS ISSUED, THE ARCHITECT ALONE SHALL DETERMINE THE EQUALITY UPON THE DISCOVERY OF DEFECTS IN SAME PRIOR TO THE FINAL BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR. ACCEPTANCE OF THE COMPLETED WORK. {4 AST INGS ST 4. WORK IS TO BE PERFORMED IN ACCORDANCE WITH RULES AND 20. SUBSTITUTIONS FOR APPROVED MATERIALS WILL BE ALLOWED UNDER FRONT PO RCH A-3 REGULATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION THE CONDITIONS PREVIOUSLY STATED. SAMPLES, MATERIAL LISTS, = Croton-on-Hudson AND SHALL CONFORM TO ALL CITY, COUNTY, STATE AND FEDERAL MANUFACTURER'S LITERATURE AND OTHER REQUIRED INFORMATION ALTE RAT ION PL AN NEW TORK CONSTRUCTION, SAFETY, AND SANITARY LAWS, CODES, STATUTES SHALL BE SUBMINTSUFFICIENT TIME TO PERMIT PROPER AND ORDINANCES, WHETHER OR NOT SPECIFIED ON THE DRAWINGS. CONSIDERATION AND ACTION ON SAME BEFORE ANY MATERIALS OR ITEMS WHICH SUCH SUBMITTAL REPRESENT ARE DELIVERED TO THE JOB SITE. ERONT ORCH 5. THE GENERAL CONTRACTOR, AT HIS COST, SHALL FURNISH ALL R POR TEMPORARY LIGHT AND POWER COMPLETE WITH ALL WIRING, LAMPS 21. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DELAY IN A - 4 AND SIMILAR EQUIPMENT, AS REQUIRED FOR THE COMPLETION OF THE PROGRESS OF THE WORK WHICH MAY BE DUE TO HIS FAILURE PROPOSE D EL E VAT | ON THE WORK. HE SHALL REMOVE ALL SUCH WORK WHEN DIRECTED. TO OBSERVE THESE REQUIREMENTS. THE TIME FOR THE COMPLETION OF HIS CONTRACT WILL NOT BE EXTENDED ON ACCOUNT OF HIS 6. THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, PATCHING AND FAILURE TO SUBMIT SAMPLES PROMPTLY IN FITTING WORK THAT MAY BE REQUIRED TO MAKE ALL PARTS COME STRICT ACCORDANCE HEREWITH. TOGETHER PROPERLY, AND FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER CONTRACTORS. 22. SHOULD THE GENERAL CONTRACTOR, BY HIS OWN DEFAULT, FAIL TO ADHERE TO THE CONSTRUCTION SCHEDULE, HE SHALL, AT THE DISCRETION OF THE ARCHITECT, PERFORM WORK IN PREMIUM TIME 4. THE GENERAL CONTRACTOR SHALL, BEFORE SUBMITTING HIS Re en Oe SOUPS UL Ena ee ee ie a oe BID, REVIEW ALL PLANS AND SPECIFICATIONS AND VERIFY ALL ee eee te AY OE Le CEN GOVERNING DIMENSIONS AT THE BUILDING. HE SHALL EXAMINE CAUSED BY SUCH WORK SHALL BE THE RESPONSIBILITY E GENERAL ALL ADJOINING WORK OR AREAS UPON WHICH THE PERFORMANCE OF CONTRACTOR. HIS WORK IS IN ANY WAY DEPENDENT. ANY VARIATIONS OR DISCREPANCIES SHALL BE REPORTED, WITH ALL DUE EXPEDIENCY, 23. THE GENERAL CONTRACTOR IS TO PROVIDE ALL LABOR AND TO THE ARCHITECT. MATERIALS NECESSARY TO EXECUTE ALL THE WORK AS SHOUN IN THE CONTRACT DOCUMENTS WITH THE EXCEPTION OF THOSE ITEMS 8. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE NOTED AS SEPARATE CONTRACTS OR NIC. DISTRIBUTION OF DRAWINGS TO ALL TRADES UNDER HIS JURISDICTION. 24, SHOULD THE DRAWINGS DISAGREE IN THEMSELVES OR WITH THE SPECIFICATIONS, OR SHOULD THE SPECIFICATIONS DISAGREE IN 9. THE GENERAL CONTRACTOR SHALL FURNISH SAMPLES OF THE THEMSELVES, THE BETTER QUALITY OR GREATER QUANTITY OF WORK DOCUMENTS TO THE ARCHITECT ALONG WITH THE INTENDED USE NOTIFIED BEFORE PROCEEDING. THE GENERAL CHARACTER OF THE J OHUN moO WE — MODIFICATIONS MAY BE MADE BY THE ARCHITECT. ARCH | TE CT 10. THE CONTRACTOR SHALL BE ANSWERABLE TO THE ARCHITECT AND SHALL NOT ACCEPT INSTRUCTION FROM LOCAL PERSONNEL WITHOUT CS eee VERIFICATION FROM THE ARCHITECT. THE CONTRACTOR SHALL BE 25. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE 24 VAN WYCK STREET LIABLE FOR ANY EXPENSE CAUSED BY THE EXECUTION OF SUCH PRE MESS FREE OF ACCUMULATION OF WASTE MATERIALS OR Croton-on-Hudson N.Y. 12520 WORK WITHOUT SUCH VERIFICATION AND FOR EXPENSES CAUSED RUBBISH CAUSED BY HIS OPERATIONS. THE CONTRACTOR SHALL - BY ITS REMOVAL OR CORRECTION CONFINE HIS OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY S|4 27]. 322] ; BE AGREEABLE WITH THE OWNER. THE PROJECT SHALL BE LEFT . . CLEAN AND CLEAR, TO THE SATISFACTION OF THE ARCHITECT AND I. DRAWINGS IN THIS SET AND DESIGNS THEREON ARE THE PROPERTY THE DISPOSITION OF ALL SALVAGED MATERIALS IS TO BE CLEARED Jome jompousrarchitect.com OF THE ARCHITECT. WITH THE ARCHITECT PRIOR TO REMOVAL. 12. Eee TL WOR ANS ian NOTCNONS ROM THE 26. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL NOTIFY ARCHITECT SHALL BE ON THE JOB AT ALL TIMES THAT WORK IS THE ARCHITECT WHO WILL COMPILE A (PUNCH LIST’ OF IN 66 CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE WORK. CL IM ACT | C é GE OGR AP Lt] C PROGRESS. FINAL PAYMENT WILL BE CONTINGENT ON THE COMPLETION OF THESE ITEMS. 13. ALL MATERIALS SHALL BE NEW, UNUSED AND OF THE HIGHEST DESIGN CRITERIA 2 QUALITY’ IN EVERY RESPECT UNLESS OTHERWISE NOTED. 27. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST IN ——_—_—_—_—_— ——. MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED LOCATIONS OF ANY AND ALL MECHANICAL, ELECTRICAL, # AS PER MANUFACTURER'S | RECOMMENDATIONS AND INSTRUCTIONS, TELEPHONE, LIGHTING, PLUMBING AND SPRINKLER EQUIPMENT (TO SNOW LOAD 3OQ*#/SF ZONING BOARD 9/12/22 . INCLUDE ALL PIPING, DUCTWORK AND CONDUIT), AND THAT ALL DESIGN REVIEW 8/23/22 REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF WIND SPEED 93Q-1OO MPH Saas l4. ALL WORK AND MATERIALS FURNISHED BY THE GENERAL CONTRACTOR ABOVE EQUIPMENT ARE PROVIDED. ——Ss$ AND HIS SUBCONTRACTORS SHALL BE GUARANTEED AGAINST SEISMIC DESIGN No. Revisions te DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF AT 28. THROUGHOUT THE DURATION OF THE PROJECT, THE CONTRACTOR ATA C PROJECT START 3/8/22 LEAST ONE (1) YEAR FROM THE ARCHITECT'S APPROVAL FOR FINAL CONTRACTOR SHALL REFRAIN FROM ACTIONS THAT COULD LEAD TO Cc GORT a PAYMENT. THE FILING OF A CLAIM OF LIEN AGAINST THE ARCHITECT BY oe SUBCONTRACTORS OR SUPPLIERS OF MATERIALS, LABOR, SERVICE WEATHERING SEVERE ee IB. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, SQUARE AND aed EGUIPMENT oR ANY OTHER OTHER INDIVIOUAL OR porate FROST LINE DEPTH 40" GENERAL NOTES é TRUE, AND IN PROPER ALIGNMENT. DIMENSIONS ARE FINISH TO FINISH ULON. D UNDER GO G ID REG oO AWIN CAN SHOW REASONABLE AND JUSTIFIABLE CAUSE. R N . +O HEA —__DRAWING LIST __ 16. ALL WORK SHALL BE COMPLETED FOR THE AGREED UPON CONTRACT ss PRICE WITHOUT RECOURSE TO LABOR STOPPAGES OR REVISIONS OF 29. ALL NEW YORK STATE ENERGY CODE REQUIREMENTS SHALL BE TERMITE ZONE OD. TO HEAVY ee GOVERNING REGULATIONS, LAWS AND CODES. MET OR EXCEEDED CLIMATE ZONE 4 Drawn by Checked by JJFP JJFP 1. THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL WORK 30. THE OWNER MUST OBTAIN AND MAINTAIN ALL INSURANCE REQUIRED a OR CHANGES FOR WHICH HE EXPECTS ADDITIONAL COMPENSATION BY LOCAL BUILDING DEPARTMENT AND LENDING INSTITUTIONS ICE SHIELD RE QU IRED SDNDaA TNA A A ATI : A. BENE SITES GN UEARUELADERE™ == 2. emegp stscrecia\ To proves anouinen evoke pevecrons © UNDERLAYMENT 222224 Na — AND CARBON MONOXIDE DETECTOR QUIRED BY SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. NTS CODE REGULATION Rll FLOOD HAZARDS SEE ENGINEERING A _ NILSBERG BSLATCHEORD Oo az 7 7 M 120 OO .4r S 7 _ RESIDENCE 3" 32! 0 = J J © | O89 i | 5 “| Exist. DRIVE 8/5 8/6 'S FRONT PORCH i *oy? Sx ar Six 97 DRIVE |S AND ENTRY Q)] EXISTING exi6t. DRIVE uw uu a LL ALTERATIONS || GARAGE xI8T. DRIV Y/// ae = 8 427 SF. Eu LO arg? | Z iss > , COVERAGE oe EXISTING 7 S HASTINGS ST Ee 2% STORY ]) stzre <I Croton-on-Hudson uw | Exist. Patio [||| ae DWELLING | EXistNG |, Ny . | 1643 SF. 15" a Z 8 _* — EXIST. COVERAGE ' | “FRONT YARD I = REAR YARD § PORCH z Q SETBACK 1 EXTEND. Q ‘ Ta __ 13 8 + | LOT AREA ~ IAG a ely. —. als ol% ES o| €250 SF. aaONSD ri tix aX Six Sy ‘ OO Gz 7 ~ 7 7 7 7 3 OO OO .ar N JOHN POWER ZONING ANAL YSIS FOR DISTRICT RA-5 ARCHITECT PLOT PLAN 24 VAN WYCK STREET BASED ON PARAMETER FO SUED EXISTING PROPOSED Croton-on-Hudson NY. 10520 SURVEY OF PROPERTY LOT AREA MIN. EXIST. NO CHANGE S14. 271. 222! PREPARED FOR LOT WIDTH MIN. BO FEET | 50 FEET ——E——ETOrrrrver DENNIS ¢ SANDRA SEGATT VILLAGE OF Croton-on-Hudson | FRONT YARD MIN. | IB FEET | le'-8" | le'-8" PORCH EXTEND. Town of Cortlandt 8 FEET 53 ET 1.@' PORCH EXTEND. WESTCHESTER COUNTY, NEW TORK SIDE TARD MIN. or. 1O' VARIANCE REQ'D PREPARED AUGUST 6, [98]! COMBINED 2.2' VARIANCE REQ'D DESIGN REVIEW 6/23/22 BY REAR YARD | 25 FEET ee JOHN MARANO PROJECT START 3/3/22 Ne SURVE TOR — | : : PLOT PLAN PLEAGANTYIELE, NY A | 2% STORY | 2% STORY) ey ist. NO CHANGE + ZONING ANATSIS MAXIMUM HEIGHT 35 FT. oREET ZONING ANALYSIS — AD% 33% 246% Drawn by Checked by Project No. o Scale a 202204 |" = 15'-O" N N CN ILSBERG i i BLATCHEORD | EXISTING LIVING ROOM | SESIDENCE l bia" eat =< 43! ! FRONT PORCH N “© - 3'-O" *4 “3'27 1 N AND ENTRY N N \ Remove! ~\ 7 | REMovE! > \ REMOve \ ALTERATIONS N FRENCH | \/ | FRENCH | / PATCH! N 38 \S DOOR | (2) 2«I2 HDR DOOR (2) WALL \ HASTINGS ST LAS ER eR i] :«;C WWW i PH Q QA GG WW Croton-on-Hudson 7, Z I2X8D 36X8OQ |2k8D | NEW TORK Bil Le SIDE FRONT Neen le | | wa LITE DOOR \, | | Bh “ZI KR If | fit — [SN Wl | | | Y a | PORCH | \ | 7 ez | I) | | | SS i | a | DN | <I | S 7 | | Sot | re Se — — —|— — — — = — ———— a a NEW NEW NEW ae rs | Sost Nest ON "ON TN ON NEW oo, a New UN ON NEW NEW EXIST Exist Poet al POST \ [NEW NEW JOHN POWER FTG HDR FTG FTG ew 8 W ION HDR FIG. & ARCHITECT HDR 1 1 PORCH EXTENSION cn ns on SRONON ON HIDGON NYP DEI 914.2711. 3221 B'-O"' PORCH EXTENSION) EXISTING Jomejompouerarchitect.com EXISTING PORCH WIDTH DRIVEWAY ZONING BOARD 8/2727 DESIGN REVIEW 8/23/22 — — Ss) EP 2 EXISTING WALL ee “CONSTRUCTION ELAN NEW WALL we CONSTRUCTION pe Brows by Ghecked Bp PP EXISTING TO _— Fae eee BE REMOvED |__| 2022.04 6 /1e"=-O" BLATCEEORD RESIDENCE FRONT PORCH EXISTING ROOF RIDGE AND ENTRY K1Tttttt.tt.ttItItt.ttttttttttf ST ALTERATIONS ZA f\ (Cy f\ WN Lf (Ney ZW 38 ZU LNT MIS EINGHRO OE LW LYS 2 EXIST. DORMER ZU f NN BHING EES TY ZA“ S BEYOND a A ST ING S ST ZO, LO “A Sh hh WY LO EF=FEa QS 2 ff J Sas gS Croton-on-Hudson AY == Sepsasseerserasy, == wt NEW TORK A /y "NST LF A \ CS ZY f—— DN EW /—_ ee O \ CS Zee f se eeeeeeseaNNR Tf fs eFEeéiQ ON _— Yr ZY RIT O—F—OEN ELE fee ERT Fin" SS —| [oY LINN [WIN "NQF Sy] EO {_ F/O | e/a _ FS EXIST. GUTTER es y/o TTC a \ On | ¢ LEADERS ee 7a _— FY ES 2 _ A CE | Sf ———— TN OBRRIST INTE J) EE Yy-AN-T7T7NFN]7FDY._ _ a \ ET | SIDING a rn Exist. || (| || &B IST. Exist. |{ (“NY || YZ] B BINP p BR BN |P NTE Neuy ROOF SHINGLES — y sss eN \ = TO MATCH EXISTING (Dae SSS ee SA AS ee Pe SSS Ses SE Se TaN ee E S| SECOND FLOOR | “—> 1] — ao a ee eT FT TE Ee 4 Wo EE EE I c— | ey efeonnasbaa5s5Oe SSeS l ee SSeS a an a FREE E ES EEEEEE EDEN ESSE] \ GSssgassssed fassasassses ——/ | €—— NEW GUTTER TO | fq} 7 [ss Ricci ccc] | | | + WRAP AROUND — i es : 4 | | Cs ee — HIP ROOF WITH JOHN POWER ry Fit | ee Be PY (FY | SC LEADER TO DRIVE ARCHITECT i} Fb =i Book | |} | | BOTH SIDES — | re ee H Fi} | 4 ae l | ;— SY e— NEW DECORATIVE 24 VAN WYCK STREET Cy ee —) eo Pop 6817 COL. To MATCH Croton-on-Hudson N.Y. 10520 Cy NEW NEW NEW ee es Oe Oe | |) Bs ff) DI] YOR.) Ff == 314.271. 3221 Sy LL ee = Cy ° ° C1} I | — — C1} I | — ee_— — —_—_—_—_—_—_—_—_—_—_— — _E— re ee ee | ——— = _—————— PS t — — Lo jsuesueeesassadessesasd fesaaesasaasasasiases Ji HL ssessasassa9as033 a EEEEEREEREEEREERE FPEEEREEEEEEEEEEEEEREEE i EEEEREEEEEEEEEEEEEEEEE ee | EEEEEREEEEEEREEEE BL rs (EES |] EEE gL] | —— GRADE LEVEL ZONING BOARD 3/12/22 ~ = DESIGN REVIEW 8/23/22 |) fll) ARRON | | EXISTING PORCH APRON PANEL | | —— ———————— || 0} |!) |e 12" Dia. Cone. Fras. — I2" DIA. CONC. FTGS. -' |||) TO MATCH | li | DOUN TO 42" BELOW No. Revisiona——~S~*~*~S~S~SOSC at DONS 42"BeLow | ‘I | | || | | mo) Til ExistING GRADE LEVEL MOT SR BBD EXISTING GRADE LEVEL || | | | W/ (3) #4 VERT. REBARS Brewing Te W/ (3) #4 VERT. REBARS | 4 c¢ — EXIST. PORCH FOOTINGS _5¢ 4 EXIST. PORCH FTG. _s¢ 4 i! 4 FIRST FLOOR | | CONSTRUCTION PLAN pee a Pe Drawn by Checked by JIP JJIP Project No. Scale 2022.04 |/4" = |'-O"

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.