9 Eklof Ct ZBAdrawings 10 10 24
map survey
7 pages
Scanned/OCR — text may contain errors
Meeting: portal event 996 (no meeting page on file)
Agenda item: NEW BUSINESS — Stokes, Raymond, Owner-9 Eklof Ct.---Located in a RA-25 Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 68.14 Block 6 Lot 30. Request for a side yard variance from Village Zoning Code 230-33A for a proposed addition and alteration for a 3-car garage
Map / plans, 7 pages. Attached to agenda item: “NEW BUSINESS — Stokes, Raymond, Owner-9 Eklof Ct.---Located in a RA-25 Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 68.14 Block 6 Lot 30. Request for a side yard vari” (Text recovered by OCR — may contain errors.)
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
9 Eklof Ct 2006 Survey
9 Eklof Ct DRAFT Resolution 10.22.2024
9 Eklof Ct ZBA Application 2024 Redacted
Extracted text
| THESE GENERAL NOTES SHALL APPLY TO ALL DRAWINGS IN 2. THE CONTRACTOR SHALL BE REQUESTED TO PROVIDE SAMPLES RES | DENCE
THIS SET AND SHALL EXTEND TO ANY CHANGES, EXTRAS, OR LISTED BELOW. NO MATERIALS SHALL BE USED WHICH DO NOT GENERAL NOTES ¢
ADDITIONS AGREED TO DURING THE COURSE OF THE WORK. EQUAL THE APPROVED SAMPLE. UNTIL SUCH APPROVAL HAS BEEN A-| A ITIONS 4
2. DO NOT SCALE DRAWINGS! DIMENSIONS SHALL GOVERN. DETAILS CRS RICATED Of INCORCCRATEO iN BR Re THY APEROVAL OF D RAW ING L IST DD O
SHALL GOVERN OVER PLANS AND ELEVATIONS, LARGE SCALE SAMPLES WILL NOT PRECLUDE THE REJECTION OF ANY MATERIAL ALTERATIONS
DETAILS SHALL GOVERN OVER SMALL SCALE DETAILS. UPON THE DISCOVERY OF DEFECTS IN SAME PRIOR TO THE FINAL >| OT PLAN AND
3. THERE WILL BE NO SUBSTITUTION OF MATERIALS WHERE ACCEPTANCE OF THE COMPLETED WORK. A-2
MANUFACTURER IS SPECIFIED. WHERE THE TERM 'OR EQUAL' 21. | A MAT: IALS WI ALLO UN
ISSUED, THE ARCHITECT ALONE SHALL DETERMINE THE EQUALITY THE CONDITIONS PREVIOUSLY OTATED SAMPLES, MATERIAL Liste ZONING STUDY 3
BASED UPON INFORMATION SUBMITTED BY THE CONTRACTOR. MANUFACTURER'S LITERATURE AND OTHER REQUIRED INFORMATION EK| OF COURT
4. WORK IS TO BE PERFORMED IN ACCORDANCE WITH RULES AND SHALL BE SUBMITTED IN SUFFICIENT TIME TO PERMIT PROPER
Re SUL ATIONS OF GOVERNMENTAL AGENCIES HAVING JURISDICTION CONSIDERATION AND ACTION ON SAME BEFORE ANY MATERIALS OR ITEMS GARAGE LE VEL PL AN A - 3 Croton-on-Hudson
AND SHALL CONFORM TO ALL CITY, COUNTY, STATE AND FEDERAL WHICH SUCH SUBMITTAL REPRESENT ARE DELIVERED TO THE JOB SITE.
CONSTRUCTION, SAFETY, AND SANITARY LAWS, CODES, STATUTES
AND ORONANGES WHETHER OR NOT BRECHIED GH HE ORainas, 72. THE GONTRACTOS HL BB ELD SEO SS ts Shute ATTIC FLOOR PLAN A-4 |_NEU TORS
5. THE GENERAL CONTRACTOR, AT HIS COST, SHALL FURNISH ALL TO OBSERVE THESE REQUIREMENTS. THE TIME FOR THE COMPLETION SBL* 6314-6-30
TEMPORARY LIGHT AND POWER COMPLETE WITH ALL WIRING, LAMPS or Hie CONTRACT WILL NOT A EXTENDED ON ACCOUNT OF HIS .
AND SIMILAR EQUIPMENT, AS REQUIRED FOR THE COMPLETION OF _
THE WORK. HE SHALL REMOVE ALL SUCH WORK WHEN DIRECTED. STRICT ACCORDANCE HEREWITH, FRONT ELEVATION A-5
6. THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, PATCHING AND 23. SHOULD THE GENERAL CONTRACTOR, BY HIS OWN DEFAULT, FAIL
FITTING WORK THAT MAY BE REQUIRED TO MAKE ALL PARTS COME TO ADHERE TO THE CONSTRUCTION SCHEDULE, HE SHALL, AT THE RE AR E L E VATION A-6
TOGETHER PROPERLY, AND FIT TO RECEIVE OR BE RECEIVED BY DISCRETION : OF THE ARCHITECT, PERFORM WORK JN okertiunt Ime
WORK OF OTHER CONTRACTORS. . x
CAUSED BY SUCH WORK SHALL BE THE RESPONSIBILITY OF THE SIDE ELEVATION A-|
1. THE GENERAL CONTRACTOR SHALL, BEFORE SUBMITTING HIS GENERAL CONTRACTOR.
BID, REVIEW ALL PLANS AND SPECIFICATIONS AND VERIFY ALL
GOVERNING DIMENSIONS AT THE BUILDING. HE SHALL EXAMINE 24, THE GENERAL CONTRACTOR IS TO PROVIDE ALL LABOR AND
ALL ADJOINING WORK OR AREAS UPON WHICH THE PERFORMANCE OF MATERIALS NECESSARY TO EXECUTE ALL THE WORK AS SHOUN IN
HIS WORK IS IN ANY WAY DEPENDENT. ANY VARIATIONS OR THE CONTRACT DOCUMENTS WITH THE EXCEPTION OF THOSE ITEMS
DISCREPANCIES SHALL BE REPORTED, WITH ALL DUE EXPEDIENCY, NOTED AS SEPARATE CONTRACTS OR NIC.
TO THE ARCHITECT.
25. SHOULD THE DRAWINGS DISAGREE IN THEMSELVES OR WITH THE
Be ey OF DAWN To ALL TEAP ES NDE ue Te SPECIFICATIONS, OR SHOULD THE SPECIFICATIONS DISAGREE IN
JURISDICTION THEMSELVES, THE BETTER QUALITY OR GREATER QUANTITY OF WORK
; OR MATERIALS SHALL BE ESTIMATED UPON, AND THE ARCHITECT
9 THE GENERAL CONTRACTOR SHALL FURNISH SAMPLES OF THE NOTIFIED BEFORE PROCEEDING. THE GENERAL CHARACTER OF THE
VARIOUS MATERIALS AND FINISHES REQUESTED IN THE CONTRACT DETAIL WORK IS SHOUN ON THE DRAWINGS BUT MINOR
DOCUMENTS TO THE ARCHITECT ALONG WITH THE INTENDED USE MODIFICATIONS MAY BE MADE BY THE ARCHITECT.
BEFORE THE COMMENCEMENT OF THE SPECIFIED WORK 26. THE CONTRACTOR SHALL AT ALL TIMES KEEP THE JOHN POWER
IO. THE CONTRACTOR SHALL BE ANSWERABLE TO THE ARCHITECT AND Be CARED BY nie OPEL OS ThE. FC ONTRACTOS eH ALL
CE RIFICATION Bron Tee ARCOM EO THE CONT REET ON SuALL Se CONFINE HIS OPERATIONS FOR REMOVAL TO SUCH METHODS AS MAY ARCH | TE CT
LIABLE FOR ANY EXPENSE CAUSED BY THE EXECUTION OF SUCH BE AGREEABLE WITH THE OWNER THE PROJECT SHALL BE LEFT a web One
WORK WITHOUT SUCH VERIFICATION AND FOR EXPENSES CAUSED CLEAN AND CLEAR, TO THE SATISFACTION OF THE ARCHITECT AND 24 Van Wyck Street
7 WITH THE ARCHITECT PRIOR TO REMOVAL. S14 27). 3221
I. OTD aRCuIBeT | ANP DESIGNS THEREON ARE THE PROPERTY 27. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL NOTIFY : :
° THE ARCHITECT WHO WILL COMPILE A ‘PUNCH LIST' OF Jom®jompowerarchitect.com
2. A REPRESENTATIVE OF THE GENERAL CONTRACTOR, AUTHORIZED CORRECTIONS AND UNSATISFACTORY AND/OR INCOMPLETE WORK. CLIMACTIC ¢ GEOGRAPHIC __
TO DISCUSS THE WORK AND RECEIVE INSTRUCTIONS FROM THE TESE her nh BE CONTINGENT ON THE COMPLETION OF DESIGN CRITERIA $e
ARCHITECT SHALL BE ON THE JOB AT ALL TIMES THAT WORK IS .
IN PROGRESS. 28. THE CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST IN NA a
LOCATIONS OF ANY AND ALL MECHANICAL, ELECTRICAL, #
I. ALL MATERIALS OHALL BE NEW UNUSED AND OF THE HIGHEST TELEPHONE, LIGHTING, PLUMBING AND SPRINCLER EQUIPMENT (TO SNOW LOAD 3ON/SF ———
MANUFACTURED MATERIALS AND EQUIPMENT SHALL BE INSTALLED INCLUDE ALL PIPING, DUCTWORK AND CONDUIT), AND THAT ALL 15-120 MPH —
REQUIRED CLEARANCES FOR INSTALLATION AND MAINTENANCE OF WIND SPEED re
AS PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS, AEOVE EQUIPMENT AGE PROVIDED TOPO EFFECTS NO
UNLESS OT OTED. 7 Fen GL EMEEION OPAL
29. THROUGHOUT THE DURATION OF THE PROJECT, THE SPECIAL WIND REGION YES ZRA SEETIRSIN 300004
14. ALL WORK AND MATERIALS FURNISHED BY THE GENERAL CONTRACTOR CONTRACTOR SHALL REFRAIN FROM ACTIONS THAT COULD LEAD DESIGN REVIEW 9/10/24
AND HIS SUBCONTRACTORS SHALL BE GUARANTEED AGAINST TO THE FILING OF A CLAIM OF LIEN AGAINST THE ARCHITECT BY WIND BORNE DEBRIS ZONE NO DESIGN REVIEW 8/30/24
DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF AT SUBCONTRACTORS OR SUPPLIERS OF MATERIALS, LABOR, SERVICE EXIST ELEV SECT 6/25/24
LEAST ONE (Il) TEAR FROM THE ARCHITECT'S APPROVAL FOR FINAL OR EQUIPMENT OR ANY OTHER OTHER INDIVIDUAL OR COMPANY SEISMIC DE SIGN EXIST PLANS 6/18/24
PAYMENT. $0 ENTITLED UNDER GOVERNING LAWS AND REGULATIONS UNLESS CATAGORY Cc ae ee OOS
HE CAN SHOW REASONABLE AND JUSTIFIABLE CAUSE. Now Revisions Date
Ib. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, SQUARE AND sraject Swart Dole Zia
TRUE, AND IN PROPER ALIGNMENT. 30. THE OWNER MUST OBTAIN AND MAINTAIN ALL INSURANCE REQUIRED WEATHERING SEVERE rs
le. ALL WORK SHALL BE COMPLETED FOR THE AGREED UPON CONTRACT BY LOCAL BUILDING DEPARTMENT AND LENDING INSTITUTIONS FROST LINE DEPTH 42" TS
PRICE WITHOUT RECOURSE TO LABOR STOPPAG! OR VISIO! 31 PROJECT SHALL COMPLY WITH THE GENERAL NOTES ¢
GOVERNING REGULATIONS, LAWS AND CODES. 2020 NEW YORK STATE RESIDENTIAL CODE TERMITE ZONE MOD. TO HEAVY — = DSAUING Liat
11. THE CONTRACTOR SHALL NOT PROCEED WITH ANY ADDITIONAL WORK 39. LICENSED ELECTRICIAN TO PROVIDE HARDUIRED SMOKE CLIMATE ZONE 4A
OR CHANGES FOR WHICH HE EXPECTS ADDITIONAL COMPENSATION ——WH+|f_WT—
BEYOND THE CONTRACT AMOUNT WITHOUT WRITTEN AUTHORIZATION AND CARBON MONOXIDE DETECTORS AS REQUIRED ICE SHIELD ———$—————
FROM THE ARCHITECT. FAILURE TO OBTAIN SUCH AUTHORIZATION BY THE 2020 NEW YORK STATE RESIDENTIAL CODE UNDERL AYMENT REQUIRED Drawn by Checked by
SHALL INVALIDATE ANY CLAIM FOR EXTRA COMPENSATION. x CAT ARDS NLA JJP JJP
OO am Project No. Scale
1g. ALL INSTALLED PLUMBING, MECHANICAL AND ELECTRICAL L D ZARD 702405 NA
EQUIPMENT SHALL OPERATE QUIETLY AND FREE OF VIBRATION. AIR FREEZING INDEX I5DO OR LESS eee A.
19. ALL NEW YORK STATE ENERGY CODE REQUIREMENTS SHALL
BE MET OR EXCEEDED MEAN ANNUAL TEMP. Ble A =
(uenmere _ ee STOKES
& @ RESIDENCE
; 9 ie
=| Vv $
Q #9 /s ADDITIONS é
~/9 ae if ALTERATIONS
i Wu .
E vy? €
12) m / EXKLOF COURT
SIDE YARD LOT AREA / NEW TORK
| SETBACK y) = OD2 oF y
, SBL* 68)4-6-23@02
| ; 5 S
ae ) /
J S652
E44 Ss >
lg SqGko
| *ISTING DECK oe ;
aa, =n
Y | letr |
|
| NEW TSS /
acters t [ YY. 7 EXISTING / PLOT PLAN
; | 2 STORT FRAME BASED ON
| = EXPANDED EXISTING | DWELLING SURVEY OF PROPERTY
AREA OF WORK la . GARAGE | /
PROPOSED Cc 7 / SITUATED IN THE
GARAGE EXPANSION yy OPEN p 3 we VILLAGE OF
no! CU ay ORCH a 6s, / x Croton-on-Hudson ee ToRER
Ste WESTECHESTER COUNTY ake eae
PROPOSED NEw | G Va NEW TORK 24 Van Wyck Street
DRIVE 6 Croton-on-Hudson. 12520
MAY 5, 2006
Sip! | ' S914 . 271 . 3221
S, ISTING . .
ape | WALK — KULH ANEK ¢ PLAN jom®jompowerarchitect.com
| ) LAND SURVEYING PC a
4 POUND RIDGE, NEW TORK
Ne | D a
| vw |B , / ————
VE ! 3 _ g M4 / a
8 Sieg / ZONING ANALYSIS — DISTRICT 8-2 ________ | masses gaom
! u Sir DESIGN REVIEW 6/30/24
= uw? ExteT ETEY Sect efbi4
Q / EXIST ER ANS __e/l6/24
= Project Set Ose ~~~
3 | y = ~ @ rowing Te
€ Wi . ; ' ' 30' VARIANCE TST ArT SAN
j Es ——
@ ‘NX a
, | R=2500' © a ee
N = ' — MAXIMUM Bul IN 25% MAXIMUM 93% 12 % —. Js OOO00—_—C<SYZT SS
2 EKLOF COURT rs
S ol’ 12' OO" W FLOOR AREA RATIO 5/20 SF 3231 SF Drawing No. 9
a
FO EMAIN Y34.: GY bahainiy S.
NEW WALL Y | |
NU on 1 (A) ADDITIONS &
: ALTERATIONS
EXISTING TO _— TTT Y
BE REMOVED |__| ceil = | =
- | | wg EIT EXx|ST EKLOF COURT
an . FAMILY KITCHEN | Croton oN wunecn
ra OOM
an WORKSHOP | | ~
A4'-4! | A
EX!S
- 6 y
p= — —~ fe (TEAR Z)
| | | A | le | . | cm
| ° | M | : j
| || || | y
| | | | y
| | || | j
| | | | Z
| || || | Z
| | | | ]
| | ' | | | | ) EXIST
| | | | | EXISTING ARNE / DINING JOHN POWER
Y
GARAGE i| GARAGE | | 7 ARCHITECT
EXPANSION |; EXPANSION | | : ] S FETS STE)
OC _ Y
i oat TL 2d 2 2221
- | | | | | | || ] EXISTING OO
° ~ 1 ~ —;— a : : ——
xt | | | a ; —_— a
my) | BAY *3 | | BAY #2 | Il BAT #4 | 7 ] _—
| | | | | | | | | | / EXIST ZBA SUBMISSION 9/20/24
| | | | | || | | | ] PORCH DESIGN REVIEUB73004
| | | y EXIST ELEV SECT 6/25/24
GEN | | | | | | | i | ] EXIST PLANS @/l6/24
| | | | | | L | | | | / 7 ve
| ! | ee ee a
| | || || | 6 GARAGE LEVEL
| | | | I | | = PROPOSED PLAN —
| LS |v See
— — —— — ee — — — | JIP — ar
————
m™ A
STOKES
TTTTTLITITT I iii | RBO|DENCE
Ma | G ALTERATIONS
| ALTERA
O— Fr | “COURT
WALL y ROOF + l OF CO
g R
P| eae | 7 ExliS NEW YO
CONSTRUCTION Pe dvr) BEDRM
—— 1+ 4 PTI TT TTT wuarat AN 1 | | ]
BE REMOveD [1 OLLIE I LEI No 7 ITT | j
BE REMOVE PLLA LTT Leta | | j
TLL tr EW | ILL j
PULTE Trot as OF CUCL Ty “a | nm cot t
LLU L 4 PTA Tt ToT To Z
HUSH Aan RRR a + Ej +H + EJF + t j —
intern erence = — E
SPEAR ET ECL ee -— / j
Seeeeeecege See L / LU ]
ReCeCEE RAS | | ]
eee eee | | j
Hae | / Y, y
Pee |__| / =t fob | | JouN POWER
SAH THA | Ss Gai y y CH|
BCEEEEECEEE (7 Biwes
ane NEW rH | | \ TLELILLY ] oROTN ON a1 3291
| ——— G .
> PROOF Fc - no | fgg. 3271
S-EEH HHH ————— Py TTTTTT1 TITILY isT , p——————ere—r_~
eee =a | NILEEIIILo [ITTV Ex ——
eee ATTIC | ptt TTL LOSET 7 —
EEE OR | | FAL LINEW__t TIA C y —_
HHH OT — Hh LENE Wott a Lz |
Saeee seen — ERE EROOF TIE Ld. —
CEOS ECAC | by HOHNTI PCUET TITEL ZBA SUBMISSION 3710/24
HEE — bi ieee (ements eet eee
HECHT H | | HOH ATIO I] | dt tT Ty = x | ST SiereLae —e/e74
EEE ri pb eseci aurea = eee
SC-A 4 tT FEE [TUTTI = ——
a i a
aa | | Hot SS TTITLLLL i —FROPOSED PLAN _
ESSseSrael: - tifitne cae ——
SHH | a oie PAPAL, PTL TT as
Ly ae a L_ ry as LIL TT Tit Project No. aL
EE | PHO H ana Sage 202403 1/4" = 1-O"
HHH ©) EE EN = rng
PEE Hee Cer a isueeeaneean qin A-4
Pee ———----}-
Sasesesenes
STOKES
RESIDENCE
ADDITIONS ¢
©) ALTERATIONS
| 3
| C= -Croton-on-Hudson
Z| TS __| =e == | NEW YORK
VA (se al IN — ey Ed EAS
- 7 f a ; lili iil eee (ES) ES (EE) Ss JE)
ACETIC
Se a sr Se
=n ene =n |= Ee a=
SSIES IAI Tht Ue LA = Hi: | lB 2
a -|aRe A ee 24 Van Wyck Street
| | | | | 314.271 . 3221.
(o--22===2 Oa [uO IO a a eee Jomejompouerarchitect.com
©) | $$
| —_—
(Coo fp
__ FRONT ELEVATION _
A-5
STOKES
— RESIDENCE
et A L T E RA T | ON S
Sosa als TENE HESEEESEEESSnceseesecessse:| (€) IN 3
————————————_ Sy Cl > Croton-on-Hudson
— SS INN
[/_Ssyvso er ee pe
————$<——{$_ SSS SSS
OoQQ787z#M4 A OOO o—<§$§$
S658 ESS er eC LN RQUER
y X le ee
(er w _ poetics
ft @ te FN lil —
: Wi | | a
| 7 | © B) | | TO
So TITIIIIILILILILLe i ee 4 ee ; ZEA SUBMISSION 2/20/24
PROPOSED REAR ELEVATION ——
REAR ELEVATION —
A-6
STOKES
RMESIDENCE
a, ADDITIONS 4
| [T | [tT TT | TT 7 T/T T | | — T T T T [| — T— TT [T [T 7 [| TT TT TT [T [— 7 7T 7— T [T [T T TJ]
| PI[ef TTF LLIILILTIIIIIIILIIIIIIIITIIIIIIIIIIIA- ALTERATIONS
| | Al TITITLERIITIITITITITITILIIIITITITIITIIIIIIL
Par“ TI TTTITILTITHMIIIIITIIIITIIIITIIIITIIIIUL 5
I | TIES ESE EG EET|E EPP]? EPO [Ss
‘ | TTTTIITIIITITIILIITT£ELIIIIIIIIIIIIIIIIIIIT, EKLOF COURT
Z—S ! TITILTITILELLIIILITILERLIIITIIIILIIIIIIIIIL Croton-on-Hudson
Z——— | TTITLLLLIIITILILIILIIILITNIIIIIIIIIIIILo,
a Se SCL EELLILTOUTTITITITIIITrTrLiuitiririitirititre NEW TORK
———— TT'TLLILIIILILLIIIIIIiIiLiinttiiiiiitiitiiliiiiey, SBL* Ga14.6230
= | LITITIITILILLIIIIIIIILIitiliiiiiiliiiiiilil :
= | I TT ITTILTLILLHititiiitiiliiiiittiiiiitiiiiit.
= | | TELLILILISTILITSILIILILIITIIIILILIIIIIIIIth
i | TTL LIT? TI MSITIIiTtii ti tintitrtitiiiitititiy
= om — | ER SS SEE. EL EE_Oo“_—Oo [Ss
= — aA UII IIIf iti tte iti Pettit ititiitititit| _
—— ot TTT TITITIILIILITLLITMIILITitiliIIIITiitiiit
are TTT TTITITIPTITITITILI Nati litbiriririot.
= ! TILILILTILILLIIIIILIIIIIIFELILLIENIIILil
—=— | FUTTITIILTILLILTILIILIITIIIILITelLI III reli,
— — SE St TL ETET TI TTT TTT TTT TTT TT PTT IT rs 1
i — ——— e..2..——— JOUN POWER
1 ee ARCHITECT _
1 Ee PEON ON HISCON ro tosae
| ——— Bld 4) 3991
i | —_——
r= | | a
| | | | ZBA SUBMISSION 9/20/24
= | | DESIGN REVIEW 6/30/04
| P| oe
| Le No. Revisions Date
i Project Start Date ——SS*~*~S JD
ee | a ————————————-1_-__4 Brewin Te
2 | | _ _IL $$ _§_ _}___| ——$ROPOSED
| | ee eee ere SIDE ELEVATION
t—--—t—-----1-~4----- —— Drawn by Checked by
a — |i —_ _ _J PF... WP
PROPOSED SIDE ELEVATION a
Machine-extracted for search and reference — the original PDF is the authoritative version.