croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

133 Maple St - 3 Car Garage Plans

map survey 3 pages
Meeting: portal event 1023 (no meeting page on file)
Agenda item: New Business — Franzoso, Mark, owner---133 Maple Street-Located in a RB 2-family Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 79.5 Block 1 Lot 51. Request for a height variance from Village Zoning Code Section 230-40A(1)(a) for a proposed addition to an existing garage.
Map / plans, 3 pages. Attached to agenda item: “New Business — Franzoso, Mark, owner---133 Maple Street-Located in a RB 2-family Residential District and designated on the Tax Maps of the Village of Croton-on-Hudson as Section 79.5 Block 1 Lot 51. Request for a height”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 133 Maple St - ZBA Application 2.25.25 Redacted 133 Maple Street Aerial 133 Maple Street DRAFT Resolution 2.25.25
· · · · · · · · · · · · · · NEW 3 CAR GARAGE ± 1,500.00 S.F NEW ASPHALT DRYWAY EXISTING 2 CAR GARAGE NEW 3 CAR GARAGE C.H. 9'-0" 31' - 6" 48'-0" 5' - 0" 9' - 0" 9' - 0" 4' - 6" 9' - 0" 5' - 0" 4' - 6" 5' - 0" LOT LINE LOT LINE LOT LINE NEW GARAGE DOOR NEW GARAGE DOOR NEW GARAGE DOOR NEW ASPHALT DRIVEWAY EXIST. ASPHALT DRIVEWAY EXIST. GARAGE DOOR EXIST. GARAGE DOOR 16'-6" 13'-6" 16'-6" UP 20'-6" 48'-6" NEW STORAGE AREA ± 1,400.00 S.F 48'-0" 31'-6" DN Ground Floor 0' - 0" Storage 10' - 0" Exist. Roof 22' - 0" New Ridge Roof 20' - 0" NEW ASPHALT/FIBERGLASS ROOF SHINGLES OVER 15# BUILDING PAPER ON 5/8" EXTERIOR PLYWOOD SHEATHING ON NEW 2X10 ROOF RAFTERS @ 16" O.C.. PROVIDE ICE & WATER SHIELD BEHIND FASCIAS/UP ROOF SLOPE 2'-0" MIN. NEW 2"x10" RIDGE TO BE ANCHOR INTO NEW (2) 1 3/4" X 11 7/8" LAMINATED WOOD LVL NEW SIDING TBD BY OWNER NEW 3 CAR GARAGE EXIST. ROOF EXIST. 2 CAR GARAGE NEW 2"X10" R.R. @ 16" O.C. W/ TYP. TIES. NEW ANDERSEN WINDOW SEE SCHEDULE SHEET FOR INFO. NEW 2"x10" RIDGE TO BE ANCHOR INTO NEW (2) 1 3/4" X 11 7/8" LAMINATED WOOD LVL NEW 2"X10" R.R. @ 16" O.C. W/ TYP. TIES. NEW ANDERSEN WINDOW SEE SCHEDULE SHEET FOR INFO. 1' - 6" 3' - 0" 3' - 5 1/2" NEW 6" STUD WALL NEW #5 BARS VERTICAL @ 24" O.C. NEW 6" Ø FTG DRAIN WASHED GRAVEL CONTINUOS PROVIDE DRAINAGE PROTECTION BOARD & DAMP PROOFING AT ALL NEW FOUNDATION WALLS GRADE VARIES (TYP) 5" FINISHED FLOOR 6X6X10X10 WW 4,000 PSI. CONCRETE NEW POURED CONCRETE FOUNDATION 3,000 PSI. · · · · · · · NEW ASPHALT/FIBERGLASS ROOF SHINGLES OVER #15 BUILDING PAPER ON 5 8" EXTERIOR PLYWOOD SHEATHING ON A NEW 2"X10" R.R. @ 16" O.C. PROVIDE ICE & WATER SHIELD BEHIND FASCIAS/UP ROOF. W21x100 "I" steel beam ASTM A992 Gr. 50 (TO BE VERIFY BY A STRUCTURAL ENGINEER) EXIST. "I" STEEL BEAM NEW "I" STEEL BEAM NEW "I" STEEL BEAM W21x100 steel beam ASTM A992 Gr. 50 (TO BE VERIFY BY A STRUCTURAL ENGINEER) NEW (2) 1 3 4" X 11 7 8" LAMINATED LVL WOOD BEAM NEW 2"x10" VALLEY RAFTER NEW 2"x10" VALLEY RAFTER NEW 2"X10" WOOD RIDGE NEW 2"x10" VALLEY RAFTER NEW 2"x10" VALLEY RAFTER NEW 2"X10" WOOD RIDGE W21x100steel beam ASTM A992 Gr. 50 (TO BE VERIFY BY A STRUCTURAL ENGINEER) NEW 2"X12" F.J. @ 16" O.C. W/ TYP. FRAMING CLIPS. NEW 2"X10" VALLEY RAFTER NEW 2"X10" VALLEY RAFTER NEW (2) 2"X10" WOOD BEAM NEW ANDERSEN D.H WINDOW NEW ANDERSEN D.H WINDOW NEW ANDERSEN D.H WINDOW NEW ANDERSEN D.H WINDOW

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.