032625CoHPB - Insite response letter
site plan
4 pages
Meeting: portal event 1034 (no meeting page on file)
Agenda item: Public Hearing — WBP Development, LLC - 1 Croton Point Avenue/ "Lot A" (79.17-1-5,4 &3) - Application for Site Plan Approval for Five-Story Building with 100 Dwelling Units and Subdivision Approval for Consolidation Subdivision
Site plan, 4 pages. Attached to agenda item: “Public Hearing — WBP Development, LLC - 1 Croton Point Avenue/ "Lot A" (79.17-1-5,4 &3) - Application for Site Plan Approval for Five-Story Building with 100 Dwelling Units and Subdivision Approval for Consolidation Subd”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2025-03-04 response from Fire Dept on hydrant location
2025-03-26 Croton Point Full Set SS
250326 1CrotonPoint PlanningBoardIssue
Draft eNOI Croton Point 1
MS4 Croton Point
PCSM-1
SWPPP24154 032625 SS
Extracted text
3 Garrett Place, Carmel, New York 10512 (845) 225-9690 Fax (845) 225-9717
www.insite-eng.com
C:\Users\aknox\Desktop\032625CoHPB (002).docx
March 26, 2025
Village of Croton-on-Hudson Planning Board
1 Van Wyck Street
Croton-on-Hudson, NY 10520
RE:
Transit Oriented Development
Croton Point Ave
Croton-on-Hudson, NY
Dear Chairman Luntz and Members of the Board,
On behalf of WBP Development LLC (“WBP”), we are pleased to enclose eight (8) copies (unless
otherwise noted) of the following for the Board’s consideration in its continuing review of WBP’s
Application for Site Plan Approval for the above referenced project:
●
Ten (10) sheet Site Plan Set, last revised March 26, 2025.
●
Ten (10) sheet Architectural Plans (Floor Plans & Elevations) prepared by Arketekcher.
●
Consolidation Subdivision Map, dated March 26, 2025.
●
Draft electronic Notice of Intent (NOI) for coverage under GP-0-25-001.
●
Draft MS4 Acceptance Form.
●
Stormwater Pollution Prevention Plan (SWPPP), dated March 26, 2025.
We have updated the drawings to respond to the Board’s comments and direction given at the
Board’s regular meeting on March 4, 2025, as follows:
1. A note regarding the provision of supplemental landscaping has been added to the drawings as
requested.
2. A crosswalk has been added across the on-site, one-way driveway. In addition, the alternative
with the additional landscaping along the project frontage has been incorporated into the plan
set.
3. The architectural drawings and renderings have been updated
a. The project architect will present an alternative layout of the lobby and mail/package
room at the next Planning Board meeting.
b. The height of the solar panels has been clarified on the drawings.
c. The renderings, elevations, etc. of the building were correct as presented. The solar
panels and parapet wall heights were coordinated on this submission. A building
section has been provided that includes the dimensions of the heights of the bulkheads
and parapet walls.
4. Material sample boards will be presented to the Board at its next available meeting.
5. A Consolidation Subdivision Map has been submitted as requested by the Village Engineer.
Letter to Village of Croton-on-Hudson Planning Board
RE: 1 Croton Point, Croton Point Ave, Croton-on-Hudson, NY
March 26, 2025
032625CoHPB.doc
Insite Engineering, Surveying & Landscape Architecture, P.C.
6. A hydrant has been provided in the northwest corner of the site as requested by the Village Fire
Department and Village Engineer. The hydrant has been located within the limits of the
existing water easement as requested.
7. The project photometric plan has been updated to include a more modern fixture (to better
complement the preferred architecture) and the existing streetlights have been incorporated in
the lighting model.
Memorandum from AKRF, Inc Justin Seeney, PE, dated March 5, 2025:
At the request of the Village Engineer, AKRF has reviewed the 1 Croton Point Stormwater Pollution
Plan (SWPPP) dated August 1, 2024, prepared by Insite Engineering, and offers the following comments:
1. Comment: The Post-Development Map does not appear to accurately reflect the proposed site
grading and drainage. The maps should be revised to clearly reflect the areas collected by the
two proposed hydrodynamic separators and the areas that will drain off-site untreated (e.g. the
western driveway, portions of the pocket park, portions of the driveway entrances).
Response: The Post-Development Drainage Map in the SWPPP (Figure 3) has been
revised based on the latest grading plan. We have also illustrated the tributary area to
each hydrodynamic separator as requested.
2. Runoff from the site connects to existing catch basins on NYSDOT property (Design Point 1) and
on Metro North property with an unknown outlet (Design Point 2). Should revisions to the
drainage area maps in response to the above comment result in an increase in peak flow rates
to either existing catch basin, approval from those agencies for the increase may be required.
Confirm whether NYSDOT or Metro North have any MS4 Jurisdiction or involvement given the
connection to their storm sewers.
Response: The project SWPPP still does not result in an increase in peak flow to either
Design Point. It is our understanding MS4 boundaries do not coincide with collection
system boundaries but instead property boundaries. i.e. one municipality’s MS4
jurisdiction does not extend onto another’s because there is an overlap in the collection
system. This condition is defined in the MS4 General Permit as an interconnection and
the jurisdiction transfers at the point of the interconnection. As there is no change in
stormwater peak flow and the collection system is existing it will continue to be used.
3. Per Section 9.2.1.B.III of the 2015 NYSSMDM, the Water Quality Volume (WQv) required when
using alternative stormwater management practices (such as Hydrodynamic Separators) is 75%
from the disturbed impervious area. The SWPPP uses 25% for the WQv calculation. It is
recommended the hydrodynamic separators be designed to treat 100% of the WQv from the
contributing drainage area to function properly. Alternatively, a flow diversion structure could be
utilized to direct the target WQv to the HDS units. The 75% WQV treatment rule can be utilized
to allow portions of the site to drain off-site untreated
Response: In accordance with the 2015 NYSSMDM the hydrodynamic separators have
been sized to treat 100% of the WQv Peak Flow as hydrodynamic separates are subject to
flow-based design and not volumetric design.
4. The proposed First Defense Hydro Dynamic Separator has been removed from the NJCAT
certification website (used by NYSDEC for approval of proprietary stormwater management
practices) since the writing of the SWPPP. The unit should be substituted or documentation
provided by NYSDEC (or equivalent) demonstrating it is acceptable for water quality treatment.
The proposed hydrodynamic separator has been substituted with a model on the NJCAT
certification website.
Letter to Village of Croton-on-Hudson Planning Board
RE: 1 Croton Point, Croton Point Ave, Croton-on-Hudson, NY
March 26, 2025
032625CoHPB.doc
Insite Engineering, Surveying & Landscape Architecture, P.C.
5. It is unclear how drainage collection is proposed for the northeast corner of the eastern parking
lot. It appears ponding may occur at BW 491.7 and BW 489.7 locations.
Response: The parking lot grading has been revised as requested to eliminate the area
of ponding.
6. It is recommended that an additional catch basin is considered at the high, eastern side of the
northern parking lot retaining wall. It appears the 500-contour may trap water behind the wall.
Note the TC 492.5 on that same wall appears inaccurate.
Response: A swale and drain inlet have been added to the project drawing that will collect
runoff from above the retaining wall and direct it to DI 5. The stormwater routing includes
this area in the overall analysis.
7. Provide slope, size and material of proposed drainage pipes on the Grading & Utilities Plan.
Response: Drawing SP-2 has been revised to show the size, material and slope of the
proposed drainage pipes.
8. Provide proposed grading of the western driveway and parking area.
Response: The grading of the western driveway and parking area has been updated on
Drawing SP-2.
9. Provide a draft electronic Notice of Intent and MS4 acceptance form.
Response: A draft electronic Notice of Intent and MS4 acceptance form has been provided
as part of this submission.
10. Additional revision to the SWPPP may be required to meet the minimum requirements of the
NYSDEC 2025 Construction General Permit (CGP). Note: The 2025 CGP does allow the post-
construction stormwater management design to follow the 2015 NYSSMDM based on the
submission date of the SWPPP.
Response: Based on the project history and submission of the project prior to the
issuance of the new 2025 General Permit, as permitted by the General Permit we request
the design continue under the review of 2015 NYSSMDM.
11. Confirm groundwater collected by the proposed footing drain meets the 2025 CGP
definition for "Uncontaminated discharges from dewatering operations."
Response: Based on the studies of the site to date there is no known
contamination or other restrictions on the property that would prevent the normal
discharge of the footings. The 2025 GCP defines dewatering as the act of draining
rainwater and/or groundwater from building foundations, vaults, or excavations /
trenches. As the footing drains are defined as dewatering operations and there is
no known contamination it is confirmed the footing drains meet the 2025 GCP
definition for Uncontaminated discharges from dewatering operations.”
Letter to Village of Croton-on-Hudson Planning Board
RE: 1 Croton Point, Croton Point Ave, Croton-on-Hudson, NY
March 26, 2025
032625CoHPB.doc
Insite Engineering, Surveying & Landscape Architecture, P.C.
We respectfully request to be placed on the Board’s April 1, 2025, meeting agenda for continued
discussion of the project and the Board’s consideration of scheduling the public hearing.
INSITE ENGINEERING, SURVEYING & LANDSCAPE ARCHITECTURE, P.C.
By:
Richard D. Williams, Jr., PE
Senior Principal Engineer
RDW/dlm
Enclosures
cc:
John Bainlardi, VP, WBP (via email)
Michael Bevivino, Arketekcher (via email)