Memo from Frank Balbi%2C Superintendent of Public Works%2C regarding Bid No. 09-2024 dated November 27%2C 2024
resolution
1 page
Meeting: portal event 1040 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 1 related to the roof being constructed to withstand higher winds with Armor-Tite Construction Corp. of Port Chester, New York, in the amount of $17,800.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 1 related to the roof being constructed to withstand higher winds with Armor-Tite Construction Corp. of Port Chester, New York, in t”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Extracted text
To:
From:
Frank Balbi, P.E., Superintendent of Public Works
CC:
Date:
November 27, 2024
Re:
Harmon Firehouse Addition – Roof Installation
Bid # 09-2024 - Project award
In 2021, the Village EMS facility located at 44 Wayne Street was found to contain mold and no longer suitable
for operation. The resulting assessment of the building indicated a large number of renovations and repairs
were needed to bring the facility back to an appropriate working environment. The proposed expenses led to
conversations regarding the future development and structure of the Village EMS. During these discussions,
the Department of Public Works renovated a small area of the Harmon Firehouse and converted it into a
temporary headquarters for EMS.
In August 2022, the Village contracted with Sullivan Architecture, P.C. to develop conceptual drawings for an
updated EMS facility. Sullivan Architecture worked with Village staff as well as Fire and EMS to develop
concepts to address Village needs. Ultimately, an addition to the Harmon Firehouse was decided to be the best
solution. Sullivan Architecture then produced construction drawings for the proposed addition.
In order to complete this project efficiently, the Department of Public Works will be performing as much work
as possible with Village staff. Outside contractors will be used on aspects of the project that is either too
cumbersome or time consuming for DPW staff. The next phase that will need contractor assistance is the
installation of the roof on proposed building. This includes the main addition as well as the front overhang.
On November 7, 2024, the Village of Croton-on-Hudson advertised an invitation to bid on the Harmon
Firehouse Addition – Roof Installation (Bid # 09-2024). On November 25, 2024 three bids were received
and publicly read. The following results were returned:
Bid Results:
Bidder
Bid Amount
1.
Precisions Roofing
$ 74,400
2.
Armor-Tite Construction
$ 73,000
3.
Barrett Roofing
$ 106,000
The lowest responsible bid was submitted by Armor-Tite Construction Corp., 114 Pearl Street, Port
Chester, NY 10573. Village staff has spoken with Armor-Tite and they are familiar with the project
and the timeframe that is expected. References have also been contacted and it seems they are capable
to perform the work expected of them.
I recommend approving Armor-Tite Construction Corp.’s proposal for the Harmon Firehouse
Addition – Roof Installation in the amount of $ 73,000.00. Funding for this project has been allocated
in the existing capital account: H4540.2102.23445
Mayor
Brian Pugh
Trustees
Len Simon
Ian W. Murtaugh
Cara Politi
Nora Nicholson
Village Manager
Bryan T. Healy
Treasurer
Daniel Tucker
Village Clerk
Pauline DiSanto
Village of Croton-on-Hudson New York
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501
Machine-extracted for search and reference — the original PDF is the authoritative version.