Agenda item: Public Hearing — WBP Development, LLC - 1 Croton Point Avenue/ "Lot A" (79.17-1-5,4 &3) - Application for Site Plan Approval for Five-Story Building with 100 Dwelling Units and Subdivision Approval for Consolidation Subdivision
Site plan, 8 pages. Attached to agenda item: “Public Hearing — WBP Development, LLC - 1 Croton Point Avenue/ "Lot A" (79.17-1-5,4 &3) - Application for Site Plan Approval for Five-Story Building with 100 Dwelling Units and Subdivision Approval for Consolidation Subd”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
05012025CoHPB
2025-05-01 WBP Croton Point Full Set ss
MS4
SWPPP24154 043025 SS
Extracted text
Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001
(Submission #: HQA-XQBP-T2CA4, version 1)
Details
Form Input
Eligibility
Owner/Operator Information
Site Information
Project Details
Required SWPPP Components
Erosion & Sediment Control Criteria
Post-Construction Criteria
Post-Construction SMP Identification
Other Permits
MS4 SWPPP Acceptance
Owner/Operator Certification
Additional Project Information
5/1/2025 8:37:42 AM
Construction General Permit (CGP)
Electronic Notice of Intent (eNOI) GP-0-25-
version 1.9
(Submission #: HQA-XQBP-T2CA4, version 1)
Details
Originally Started By Richard Williams
Alternate Identifier
1 Croton PointRegion 3
Submission ID
HQA-XQBP-T2CA4
Status
Draft
Form Input
Eligibility
Disturbance Threshold
Yes
No
No
No
Other SPDES Permits
Yes
Threatened and Endangered Species
No
State Historic Preservation Act (SHPA)
Yes
State Environmental Quality Review (SEQR)
1. Will the construction activity involve soil disturbances listed in Part I.A.1 of GP-0-25-001?
1.a. Will any runoff from the site enter a sewer system classified as a combined sewer?
1.b. Is this a remediation project being done under a Department approved work plan (i.e. CERCLA, RCRA, Voluntary
Cleanup Agreement, etc.) with a SWPPP which meets the substantive requirements of GP-0-25-001?
1.c. Is the construction activity related to a stormwater discharge that does not require a permit as described in 40 CFR
122.3(e), e.g. non-point source agriculture or silviculture activities?
2. Will the discharge from the construction activity meet all conditions listed in Part I.A.2 of GP-0-25-001?
3. Will the construction activity potentially adversely affect a species that is endangered or threatened per Part I.A.3.?
4. Is the construction activity designated by the Commissioner of the Office of Parks, Recreation and Historic
Preservation (OPRHP), pursuant to 9 NYCRR 428.12 or 428.13 as exempt from the SHPA review (see Attachment 2
of the Letter of Resolution between NYSDEC and OPRHP, dated January 9, 2015)?
5/1/2025 8:37:43 AM
Yes
Yes
Uniform Procedures Act (UPA) Permits
Yes
Steep Slope
No
Owner/Operator Information
8. Owner/Operator Name
WBP Development, LLC
9. Owner/Operator Contact Person Information
First and Last Name
Phone
E-mail
John Bainlardi
jbainlardi@wbpdev.com
10. Owner/Operator Mailing Address
480 BEDFORD RD
CHAPPAQUA, NY 10514-1715
USA
No
LLC
Site Information
13. Project/Site Name
1 Croton Point
14. Site Address
1 CROTON POINT AVE
CROTON HDSN, NY 10520-3028
Westchester
DEC Region
15. Site Latitude & Longitude
41.19276318712719,-73.88328694989069
Project Details
5. Is the construction activity subject to SEQR (Part I.A.5.), or the equivalent environmental review from another NYS or
federal agency (Part I.A.6.)?
5.a. Has the owner/operator obtained documentation that the project review pursuant to SEQR, or the equivalent, has
been satisfied per Part I.A.5. or I.A.6. of GP-0-25-001?
6. Has the owner/operator obtained all necessary UPA permits from NYSDEC, or the equivalent from another NYS or
federal agency per Part I.A.7.a. of GP-0-25-001?
7. Is the construction activity within the watershed of surface waters of the State classified as AA or AA-S identified
utilizing the Stormwater Interactive Map on NYSDECs website?
11. Is the billing contact different from the Owner/Operator Contact?
12. What type of organization is the owner/operator?
5/1/2025 8:37:43 AM
An entire common plan of development or sale in accordance with Part I.D.1.b.
Table 2
18. Consistent with Part III.B.1.c.i. of GP-0-25-001, provide a concise overview of the project. Describe existing and
proposed conditions, and include any other relevant information.
The project consists of a proposed 100-unit, for sale affordable condominium development
consisting of 46 one-bedroom and 54 two-bedroom homes in a to be constructed 5-story building
with requisite parking and amenities (the Development) to be located on lands fronting on Croton
Point Avenue consisting of (i) Tax Map Parcels 79.17-1-5 & 3 owned by the Village (Lot A); and
(ii) Tax Map Parcel 79.17-1-3 owned by Croton Point Realty Inc (the CPR Parcel). Lot A is
currently in use as a Village commuter parking lot. The CPR Parcel is improved with an office
building which is proposed to be demolished for the Development.
The proposed brick and metal panel building will be served by 100 parking spaces located in
a below grade parking level and two outdoor parking areas, including five (5) Level 2 EV charging
stations. Amenities within the building will include a community room, a fitness center, a co-working
lounge, a bike storage room and a roof-top deck providing expansive scenic views overlooking
Croton Point Bay and the Hudson River.
Sustainable building design features will likely include full electrification, solar readiness, high
efficiency HVAC equipment (cold climate air source heat pumps) and appliances (Energy Star
Multifamily New Construction Program) and low-flow water fixtures.
In total the property consists of 1.8 acres and is located in the LI (Light Industrial with a
Transoriented Development Overlay) zoning district, the Village of Corton-on-Hudson Water District
and the Ossining Sanitary Sewer District.
Enter the total project site acreage, the acreage to be disturbed, and the future impervious area (acreage) within the disturbed area,
rounded to the nearest tenth of an acre.
19. Total Site Area (acres)
1.8
20. Total Area to be Disturbed (acres)
1.6
21. Existing Impervious Area to be Disturbed (acres)
1.5
22. Future Impervious Area Within Disturbed Area (acres)
1.3
Nature of the project:
Redevelopment with no increase in impervious area
No
24. Indicate the percentage (%) of each Hydrologic Soil Group(HSG) at the site.
A (%)
B (%)
C (%)
D (%)
16. This eNOI submission is for:
17. Does the project type fall under Table 1 or Table 2 of Appendix B of GP-0-25-001? If any portion of the construction
activity falls under Table 2, regardless of the size of the disturbance, select "Table 2".
23. Do you plan to disturb more than 5 acres of soil at any one time?
5/1/2025 8:37:43 AM
25. Enter the planned start and end dates of the disturbance activities.
Start Date
08/01/2025
End Date
08/01/2026
26. Identify the nearest surface waterbody(ies) to which construction site runoff will discharge.
Hudson River (Class A) - 1301-0001
River Off Site
Yes
No
No
Yes
31.a. What is the name of the municipality/entity that owns the separate storm sewer system? If the separate sewer
system is owned by an MS4 Operator, enter the MS4 Operator name.
Village of Croton-on-Hudson / MTA
No
Yes
Required SWPPP Components
General SWPPP Requirements
Yes
Yes
Yes
Yes
Yes
SWPPP Preparer
27. Type of waterbody identified in question 26?
28. Has the surface waterbody in question 26 been identified as a 303(d) segment in Appendix D of GP-0-25-001?
29. Is this project located in one of the Watersheds identified in Appendix C of GP-0-25-001?
30. Will the project disturb soils within a State regulated wetland or the protected 100 foot adjacent area?
31. Does the site runoff enter a separate storm sewer system (including roadside drains, swales, ditches, culverts, etc)?
32. Will future use of this site be an agricultural property as defined by the NYS Agriculture and Markets Law?
33. Is this property owned by a state authority, state agency, federal government or local government?
34. Has a SWPPP been developed in conformance with the requirements in Part III. of GP-0-25-001?
35. Does the SWPPP demonstrate consideration of the future physical risks due to climate change pursuant to the
CRRA, 6 NYCRR Part 490, and associated guidance per Part III.A.2. of GP-0-25-001?
36. Has the required Erosion and Sediment Control component of the SWPPP been developed in conformance with the
current NYS Standards and Specifications for Erosion and Sediment Control (aka Blue Book)?
37. Has the post-construction stormwater management practice component of the SWPPP been developed in
conformance with the NYS Stormwater Management Design Manual?
37.a. Which version of the NYS Stormwater Management Design Manual was used to develop the SWPPP?
38. Has the post-construction stormwater management practice component of the SWPPP been developed by a
qualified professional per Part III.A.4.?
5/1/2025 8:37:43 AM
Professional Engineer (P.E.)
40. Name of the person who prepared the SWPPP
Richard D Williams Jr.
41. SWPPP Preparer Organization Name
Insite Engineering, Surveying & Landscape Architecture, P.C.
42. SWPPP Preparer Contact Information
First and Last Name
Phone
E-mail
Richard D Williams Jr.
rwilliams@insite-eng.com
43. SWPPP Preparer Address
3 Garrett Place
Carmel, NY 10512
Download SWPPP Preparer Certification Form
Please take the following steps to prepare and upload your preparer certification form:
1) Click on the link below to download a blank certification form
2) The certified SWPPP preparer should sign this form
3) Upload the completed form
Download SWPPP Preparer Certification Form
44. Please upload the SWPPP Preparer Certification
Comment
Yes
Erosion & Sediment Control Criteria
Yes
Post-Construction Criteria
Site Planning and Soil Restoration
Reduction of Clearing and Grading
All disturbed areas will be restored in accordance with the Soil Restoration requirements in Table 5.3 of the Design Manual (see
page 5-22).
Water Quality Criteria
No
49. Water Quality Sizing Criteria
Total WQv required
(acre-feet)
Total RRv provided
(acre-feet)
Minimum RRv
(acre-feet)
Total WQv provided
(acre-feet)
Sum of RRv and WQv
provided
0.117
0.155
0.155
39. The Stormwater Pollution Prevention Plan (SWPPP) was prepared by:
44.a. Has the SWPPP Preparer Certification Form been signed by the SWPPP preparer in accordance with Part VII.J of
GP-0-25-001?
45. Has a construction sequence schedule for the planned management practices been prepared?
46. Identify all site planning practices that were used to prepare the final site plan/layout for the project.
47. Indicate which of the following soil restoration criteria was used to address the requirements in Section 5.1.6 ("Soil
Restoration") of the Design Manual.
48. Is the reduction in impervious area greater than 25%?
5/1/2025 8:37:43 AM
Water Quantity Criteria
Yes
Operation and Maintenance
Yes
53.a. Identify the entity responsible for the long-term Operation and Maintenance.
Owner
Post-Construction SMP Identification
54. Post-Construction RR Techniques and Standard SMPs
RR Techniques and SMPs
Contributing Impervious Area (acres)
Total Contributing Area (acres)
Alternative SMPs Only
55. Alternative SMPs
Type of Alternative
SMP
Manufacturer of the Alternative
SMP
Name of the Alternative
SMP
Contributing Impervious Area
(acres)
StormTrap
StormSettler
0.8
Hydrodynamic
StormTrap
StormSettler
0.35
Other Permits
Other: DOH Approval
No
MS4 SWPPP Acceptance
Yes
MS4 SWPPP Acceptance Form
MS4 SWPPP Acceptance Form Download
Download the MS4 SWPPP Acceptance Form from the link below.
MS4 SWPPP Acceptance Form
60. MS4 Acceptance or No Jurisdiction Form Upload
Comment
Yes
Owner/Operator Certification
50. Per Section 9.2.1.C.VI and VII of the 2024 Design Manual, is there 0% change to hydrology that increases the
discharge rate and volume from the project site?
53. Has a long-term Operation and Maintenance Plan for the post-construction stormwater management practice(s)
been developed?
56. Identify other permits, existing and new, that are required for this project/facility.
57. Is this NOI for a change in owner/operator per Part I.G.?
59. Will the construction activities be within the municipal boundary(ies) of Traditional Land Use Control MS4
Operator(s) and discharge to the MS4(s)?
59.a. Which form is required per Part I.D.2.b.ii.?
60.a. Has the form been signed by the principal executive officer or ranking elected officialor duly authorized
representative of that personin accordance with Part VII.J. and submitted along with this NOI?
5/1/2025 8:37:43 AM
Owner/Operator Certification Form Download
Download the Owner/Operator Certification Form by clicking the link below.
Owner/Operator Certification Form
61. Upload Owner/Operator Certification Form
Comment
No
All forms submitted with the eNOI must be signed in accordance with Part VII.J. per Part I.D.2.b. of GP-0-25-001.
Additional Project Information
62. Enter any additional pertinent project information in the text box below.
61.a. Has the Owner/Operator Certification Form from Appendix J been signed by the owner/operator, or a
representative of the owner/operator in accordance with Part VII.J of GP-0-25-001 and uploaded to the eNOI?
5/1/2025 8:37:43 AM