Meeting: portal event 1056 (no meeting page on file)
Agenda item: New Business — Application to renew a Special Permit for a 29-unit multi-family development at 1380 Albany Post Road (67.10-2-15)
Application, 7 pages. Attached to agenda item: “New Business — Application to renew a Special Permit for a 29-unit multi-family development at 1380 Albany Post Road (67.10-2-15)” (Text recovered by OCR — may contain errors.)
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1380 Albany Post Rd - Signed Preliminary - 10-6-22
MATRA 1380 RIVERSIDE-SET 2022-10-20
Street Elevation - Rendering
Extracted text
Kory Sal
Vy, ) @ ZARIN & ksalomone@zarin-steinmetz.com
f™ STEINMETZ up Also admitted in CT
June 10, 2025
Sent Via Email
Robert Luntz, Chair
Croton-on-Hudson Planning Board
Re: 1380 Albany Post Road, Croton-on-Hudson
Special Permit Renewal
Hon. Chair and Members of the Planning Board:
As you know, this firm represents the Matra Group, LLC (“Matra”), owner of the property
located at 1380 Albany Post Road (“Property”) in connection with previously received special
permit and site plan approvals for the construction of an approximately 33,400 s.f. multi-family
building (“Project”) on the Property. Board of Trustees originally granted special permit
approval for the Project on August 15, 2022. A copy of the Special Permit Resolution of Approval
is attached as Exhibit A. Your Board subsequently granted site plan approval of the Project on
October 22, 2022. Most recently, we appeared before your Board in connection with a site plan
extension request, which was granted in April.
Pursuant to § 230-63B of the Village Zoning Code, Special Permit approvals automatically
expire after 3 years unless substantial construction has begun. In this case, the Special Permit
approval is set to expire on August 15, 2025. As we noted to your Board previously, Matra has
submitted a building permit to the Engineering Department for review and comment. This
application has been outsourced for review and a first round of comments have been issued. While
our consultants are diligently addressing those comments and preparing for re-submission, it is
unlikely that substantial construction will begin prior to the August 15, 2025 expiration date.
Therefore, we are requesting a renewal of the special permit at this time. A Special Permit Renewal
Application is attached as Exhibit B. For your reference the previously approved Existing
Conditions, Demo, and Site Layout Plan prepared by Alfonzetti Engineering, P.C., dated
September 10, 2021, last revised October 18, 2022 and the architectural plans prepared by DeMasi
Architects, P.C., dated October 6, 2022, are enclosed herewith.
Please place this matter on the Planning Board’s next available agenda for review and the
scheduling of the required public hearing.
Please don’t hesitate to contact me if you have questions.
Ke Szlbnone
KoryKalomone
Phone: (914) 682-7800 81 Main Street, Suite 415 White Plains, New York 10601
Direct: (914) 220-9804 www.zarin-steinmetz.com
EXHIBIT A
On motion of Trustee Simon seconded by TRUSTEE GALLELLI, the
on- Hudson, New York with a 3-0 vote.
Resolution # 122-2022
WHEREAS, the Village Board of Trustees has received a special permit application
from the Matra Group for a 29-unit multi-family development at 1380 Albany Post
Road; and
WHEREAS, the project is located within the 0-1 Limited Office and North End
Gateway Overlay Zoning Districts of the Village, where multi-family developments are
allowed by special permit; and
WHEREAS, the Board of Trustees issued a negative declaration under SEQRA and a
statement of consistency with the Village’s LWRP in connection to this project on
March 7, 2022; and
WHEREAS, the Board of Trustees referred the application to the Planning Board on
July 5, 2022; and
WHEREAS, the Planning Board reviewed the request and has submitted a memo in
support of the application; and
WHEREAS, ten percent of the dwelling units will be affordable as required by Section
230-48 of Chapter 230 of the Village Code which will result in three units, two (2) one
bedroom and one (1) two-bedroom apartments; and
WHEREAS, on August 15, 2022, a public hearing on granting a special use permit to
the Matra Group was opened and closed,
NOW, THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
issues a special use permit to the Matra Group for a 29-unit multi-family development
at 1380 Albany Post Road subject to the following conditions:
1. That an application for site plan approval and subdivision approval
(consolidation) be submitted to the Planning Board.
2. That project amenities be included and detailed further in site and architectural
plans.
3. That a reasonable number of charging stations for electric vehicles and bicycles
be incorporated into the project.
4. That the applicant work with the Planning board and NYSDOT to provide
reasonable pedestrian facilities which may include use of the bike and walking
trail on the West Wind HOA property in addition to other facilities.
Dated: August 15, 2022
EXHIBIT B
|
Village of Croton-on-Hudson and
be, Engineering Department 1
Stanley H. Kellerhouse Municipal Building € Boar d
be ® Van Wyck Street . .
Croton-on-Hudson, NY 10520-2501 Application
engineering@crotononhudson-ny.gov Rev 11/17
Note: Prior to submitting this application. contact Planning Board Secretary at 914-271-4783
Application Date: 06/10/2025 Application #:
Property Information: Section: 67.10 Block: 2 Lot: 14 & 15
Property Location (street address): 1380 Albany Post Road
Zoning District O-1 Commercial Lot: WYes ONo Vacant Lot! O Yes fMNo
Applicant Information: Person or Company Doing Work: J Owner 0) Contractor O Other:
Last Name: First Name: MI:
Company: The Matra Group LLC
Address: 1380 Albany Post Road, Croton-on-Hudson, NY 10520
Phone #: Cell #: E-mail: ajmatra@matrabuildingcorp.com
Property Owner: i] Same As Above
Last Name: First Name: MI:
Company:
Address: a
Phone #: Cell #: E-mail:
Application Type: (Please check those that apply)
D Site Plan * O Amended Site Plan* C1 Minor Site Plan
0 Change of Use O Amended Site Plan Extension O Minor Site Plan Extension
O Building Envelope Modification
| O Wetlands Permit* O Village Board Special Permit*
O Steep Slope Permit* fd Village Board Special Permit Renewal*
D Excavation & Fill Permit Planning
CO Preliminary Subdivision
D Final Subdivision
*note: Public Hearing required for these permits
NOTE: Planning Board also reviews applications (e.g., special permits, accessory apartments, zoning amendments, etc.) that
have been referred to them by the Village Board for a recommendation. No public hearing before the Planning Board is required
for referral applications.
Per §230-57, the submission should also include the following documentation:
A. A description of the proposed use, with reference to the appropriate use and regulations of this chapter, including
any supplementary regulations applying thereto.
B. A cost-benefit analysis or similar study to review the estimated municipal costs, services and prospective
revenues which would be generated by the proposed use.
C. Evidence that the proposed use is consistent with the goals of the Village Master Plan.
Planning Board and Village Board Application - Page 1 of 2
D. A traffic and circulation study projecting the effects of the proposed use of the existing and probable future traffic
and access in the vicinity of the proposed use.
E, Copies of environmental assessments or permit applications and supporting materials which may be required to
meet New York State or federal regulations.
F. A stormwater pollution prevention plan (SWPPP) consistent with the requirements of Chapter 196,
Article I, Stormwater Management and Erosion and Sediment Control, shall be required for any special
permit approval that qualifies as or authorizes a land development activity as defined in Chapter 196,
Article I. The SWPPP Shall meet the performance and design criteria and standards in Chapter 196,
Article I. The approved special permit shall be consistent with the provisions of Chapter 196, Article I.
INSTRUCTIONS: Please submit eight (8) paper copies (Nine copies if a special permit from the Village Board is also
required) of supporting materials to the Planning Board Secretary and one (1) pdf file of all application materials to
engineering/@)crotononhudson-ny .gov
I certify that the above information is accurate, and I am the property owner or authorized by the owner to file this application
on their behalf and that I will indemnify and hold the Village harmless against any damage or injury that may be caused by
or arise out of any entry onto the property in connection with the processing of the application, during construction or
performance of the work or within one year after the completion of the work.
Applicant (if other than owner) certifies that he is authorized by the Owner of subject premises to conduct the project
described above
Anthony Matra 06/10/2025
Applicant’s Name (please print) Signature ofApplicant or Agent Date
FOR VILLAGE USE ONLY: 7
Fee $ Fee Paid (date): Received by:
TAXES PAID: LEASE AGREEMENT (If applicable):
HEARD BY THE VILLAGE BOARD ON: HEARD BY THE PLANNING BOARD ON:
PUBLIC HEARING HELD ON: _ _ PUBLIC HEARING HELD ON: _ —_
APPROVED: O DENIED: O APPROVED: D DENIED: O
Planning Board and Village Board Application - Page 2 of 2