QBR-Coastal assessment 2025-Rev-8-2025
application
9 pages
Meeting: portal event 1073 (no meeting page on file)
Agenda item: Old Business — Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for the removal of multiple trees for the facilitation of the Quaker Bridge Replacement Project
Application, 9 pages. Attached to agenda item: “Old Business — Tree Removal Application from Hugh Greechan Jr., P.E., Commissioner of Public Works and Transportation, Westchester County for the removal of multiple trees for the facilitation of the Quaker Bridge Replac”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Contract 25-500 Plans A01 22X34
QBR - Tree Replanting memo
QBR Tree Permit Application - combined
safe print QBR - Tree Removal table and plan
Extracted text
A. INSTRUCTIONS (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office and available on the Village web site at Village of Croton-on-Hudson Local
Waterfront Revitalization Program 2024. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction) _____________________________________________
b) Financial assistance (e.g. grant, loan, subsidy) ______________________________
c) Permit, approval, license, certification _____________________________________
d) Agency undertaking action ______________________________________________
2. Describe nature and extent of action: _________________________________________
3. Location of actions: _______________________________________________________
(street or site description)
X
The proposed project will include the removal of the existing bridge and
construction of a new bridge, in addition to roadway approach
improvements. The construction of a new bridge will ensure safe and
accessible route for motorists and pedestrians.
Quaker Bridge Road
Town of Cortlandt and Village
of Croton-on-Hudson
0.35 acres
Bridge crossing the Croton River (currently closed)
Croton: PRE-1 Park Recreation and Education and RA-25 One
Family Residence. Cortlandt: R-80 Single Family Residential
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations):
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
Size (in acres): ______________________________________________________
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
If yes, which state or federal agency? ___________________________
12. If the proposed action is a law, or planning or zoning document, SKIP Section “C” and go to Section “E”.
The Waterfront Revitalization Area (WRA) Boundary for the Village of Croton-on-Hudson
coincides with the municipal boundary.
YES
NO
N/A
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon the following:
b) Scenic resources of local or statewide significance?
c) Natural protective features in an erosion hazard area?
If the answer to any question above is "yes", please explain in Section D any measures which will be
undertaken to mitigate any adverse effects.
Croton River
40%
Croton River, Cl;ass B Stream
N/A
Hugh J Greechan, Jr., P.E.,Commissioner of Public Works and Transportation
148 Martine Avenue, White Plains, NY 10601
914 995-2546
N/A
USACE and NYSDEC Permitting
X
X
X
X
YES
NO
N/A
2. Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ _____ _____
b) Scenic quality of the coastal environment?
c) Development of future or existing water dependent uses?
e) Land or water uses within a small harbor area?
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
e) Mining, excavation, filling or dredging in coastal waters?
f) Reduction of existing or potential public access to or along
the shore?
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
h) Development within a designated flood or erosion hazard area? _____ _____ _____
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
j) Construction or reconstruction of erosion protective structures? _____ _____ _____
k) Diminished surface or groundwater quality?
l) Removal of ground cover from the site?
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4.
Project
YES
NO
N/A
a) If project is to be located adjacent to shore:
2. Will public access to the foreshore be provided?
3. Does the project require a waterfront site?
4. Does it supplant a recreational or maritime use?
5. Do essential public services and facilities presently exist at
or near the site?
6. Is it located in a flood prone area?
7. Is it located in an area of high erosion?
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and industrial facilities into coastal facilities?
2. If located in the foreshore, will access to those and adjacent
lands be provided?
3. Will it involve the siting and construction of major energy
facilities?
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
c) Is the project site presently used by the community neighborhood
as an open space or recreation area?
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
e) Is the project site presently used for commercial fishing or fish
processing?
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
h) Will the project involve any waste discharges into coastal waters? _____ _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
k) Does the project involve shipment or storage of petroleum
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
products?
YES
NO
N/A
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
m) Does the project involve or change existing ice management
practices?
n) Will the project affect any area designated as a tidal or
freshwater wetland?
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
For questions answered “yes” in Section C, explain methods you will undertake to reduce adverse
effects. Review the LWRP to see if the project is consistent with each policy. List policies the
project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
X
X
X
X
X
X
X
X
See the attached memo.
The final version of this form shall be sent to the Department of State (New York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any question
in Section C is answered “yes” and either of the following conditions is met.
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Melanie C. Osterhout, P.E.
President/Project Manager
OSPA Engineering Services, PC
518 636-9956
7/24/2025
mosterhout@ospaengineering.com
Memorandum
To:
NYSDOS
CC:
file
From:
Melanie Osterhout, PE
Date:
8/13/2025
Project #:
486-0-0
Re:
Quaker Bridge Road Bridge Replacement Project
NYSDOS POLICY EXPLANATIONS
C.2(g). Structures, sites or districts of historic, archeological or cultural significance to the State or
Nation.
One historic property, eligible for inclusion in, or listed on, the State or National Register of
Historic Places, has been identified within the project’s area of potential effect on OPRHP’s
CRIS. The property includes the Quaker Road Bridge (BIN 3348560, USN # 11902.000021).
The project area and surrounding areas are located within an archaeologically sensitive area.
Additionally, according to the Full Environmental Assessment Form (EAF) the project is
within the vicinity of the Croton Aqueduct and the project area is also within the Critical
Environmental Area, County and State Parks Lands in Westchester County for exceptional or
unique character. A crossing has been present at the project location since at least 1892.
Hartgen Archeological Associates, Inc. conducted a study that identified the bridge as
architecturally significant, recognizing it as a rare and outstanding example of a late
nineteenth-century Pratt Truss bridge. Constructed in 1894 by the New York City firm Dean
and Westbrook, the bridge retains an exceptional degree of historical integrity. Originally built
as part of the Croton Turnpike Company's 1807 initiative to construct roads and bridges, the
Quaker Bridge Road Bridge stands out as the earliest example of its kind in Westchester
County.
While its original structure dates to 1894, the bridge underwent several modifications over
time. In 1938, the original guard rails were replaced, and in 1977, further alterations
introduced corrugated beam style railings. A comprehensive rehabilitation in 2009 included
painting, repairs to the wing walls and abutments, structural improvements, and other minor
replacements.
The majority of project work will occur within the existing bridge and right-of-way. A total of
5418 SF of temporary easements will be required for access and removal of the existing
structure and 1440 SF of fee acquisitions for the new structure construction. The project has
been submitted to OPRHP for a finding of effect and they have requested that a Memorandum
of Understanding be submitted for their review and concurrence for the removal of the existing
bridge.
OSPA Engineering Services, PC
1533 Crescent Road, Suite A
Clifton Park, NY 12065
Phone: (518) 636-9956
Fax: (518) 885-8006
August 13, 2025
C. 3(a). Physical alteration of land along the shoreline, land under water or coastal waters?
The project area is located along the banks and within the Croton River. The project proposes
the removal of 76 trees in the project area and impacts below the ordinary high water of the
Croton River. These impacts include 550 CY of stone fill placed within 2,290 SF. In total, 250
LF of the river will be impacted. Over 100 trees are proposed to be placed in the project area
as mitigation, including live stakes of Black Willow along the banks. In addition, stone slope
protection will be utilized to prevent erosion.
C. 3(h). Development within a designated flood or erosion hazard area.
The project area is located within the regulatory floodway, the 100-year floodplain and the 500-
year floodplain of the Croton River per the Federal Emergency Management Agency (FEMA)
Flood Insurance Rate Map (FIRM) in Westchester County, New York, Panel 36119C0128F
dated 09/28/2007. This project is a functionally dependent use of the floodplain as it must occur
in close proximity to water since it is a road crossing over the Croton River. A hydraulic
analysis has determined that the proposed action will have no impact to the 50- and 100-year
storm event water surface elevations of the Croton River.
C. 4(a)6. Is it located in a flood prone area?.
The project area is located within the regulatory floodway, the 100-year floodplain and the 500-
year floodplain of the Croton River per the Federal Emergency Management Agency (FEMA)
Flood Insurance Rate Map (FIRM) in Westchester County, New York, Panel 36119C0128F
dated 09/28/2007. This project is a functionally dependent use of the floodplain as it must occur
in close proximity to water since it is a road crossing over the Croton River. A hydraulic
analysis has determined that the proposed action will have no impact to the 50- and 100-year
storm event water surface elevations of the Croton River.
C.4.c) Is the project site presently used by the community neighborhood as an open space or
recreation area?
The project site is currently part of the Croton Trail System, which includes trails extending
southwest, northwest, and northeast of the Quaker Road Bridge. The adjacent Croton River is
also used for recreational fishing by the community. Currently, the bridge is closed and
therefore does not provide access to the trail system. While the project will temporarily affect
access to the trail system, since the bridge serves as a key link across the Croton River, these
trails will be reestablished once construction is complete. Additionally, the new bridge will
feature a 5-foot-wide shoulder to enhance pedestrian safety through the site
C.4.d) Does the present site offer or include scenic views or vistas known to be important to the
community?
The site offers scenic views that are valued by the community. It features a dense canopy of
deciduous trees and a 120-year-old Pratt Truss bridge which is eligible for listing on the
National Register of Historic Places. The bridge is supported by laid-up stone abutments
spanning the Croton River which contains natural boulders and cobbles. From the bridge, one
August 13, 2025
can also view a low head dam and the impounded pond located approximately 600 feet
upstream.
To facilitate construction, approximately 56 trees on the Village of Croton-on-Hudson property
will be removed, and the existing truss bridge and stone abutments will be replaced. To
mitigate the impact on these cherished community features, the project proposes a similarly
shaped Pratt Truss superstructure supported by concrete abutments with aesthetic treatments
designed to replicate the appearance of stained laid-up stone.
In addition, the project will provide 79 new trees to the Village, including 35 planted on-site, to
compensate for those removed. The County will also donate elements of the existing bridge to
local municipalities and has prepared a Historic American Engineering Record, which includes
photographs, available as-built plans, and historical commentary to ensure the bridge’s legacy
is preserved.
C.4.p) Will best management practices be utilized to control storm water runoff into coastal waters?
Best management practices will be implemented to control stormwater runoff into coastal
waters. During construction, silt fences, turbidity curtains, and cofferdams will be used to
prevent runoff from disturbed areas from entering the Croton River. The project also includes
permanent stabilization measures such as erosion control mats, live stakes, and stone fill to
reinforce the proposed grading and minimize long-term erosion.
Machine-extracted for search and reference — the original PDF is the authoritative version.