F-2025-0482 FA Village of Croton-on-Hudson LWRP Memo
memo
1 page
From the meeting:
Board Of Trustees — 2025-09-24
Agenda item: LWRP Consistency Review for bridge cleaning, washing, and deck sealing, including the US-9 bridges in the Village of Croton-on-Hudson.
Memo, 1 page. Attached to agenda item: “LWRP Consistency Review for bridge cleaning, washing, and deck sealing, including the US-9 bridges in the Village of Croton-on-Hudson.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
881594 dos fan pkg
LWRP Bridge Washing
Memo to VB Bridge Washing 2025
Resolution 227-2025 LWRP Consistency Bridge Cleaning
Extracted text
O N E C O M M ER C E PL A Z A
99 W A SH I N G T O N A V E N U E
ALBANY, NY 12231-0001
HTTPS://DOS.NY.GOV
KATHY HOCHUL
GOVERNOR
WA L T ER T. M OS L E Y
S E C R E T A R Y O F S T A T E
NYS DEPARTMENT OF STATE
OFFICE OF PLANNING, DEVELOPMENT AND COMMUNITY INFRASTRUCTURE
M E M O R A N D U M
To:
Pauline DiSanto, Water Advisory Committee Chairperson & LWRP Coordinator, Village
of Croton-on-Hudson
From: NYS Department of State, Coastal Consistency Unit
Date: September 4, 2025
Re:
F-2025-0482(FA): New York State Department of Transportation - federal funding for
cleaning/washing bridges and sealing decks as needed to remove debris and protect
against corrosive substances, including:
• The US Route 9 bridge over Croton River
• The US Route 9 bridge over Croton Point Avenue
• The Warren Road bridge over US Route 9
• The US Route 9 bridge over Welcher Avenue
*
*
*
*
Enclosed is a copy of the application materials for the above-referenced project for your
information and preliminary review. Please contact Joseph Sgueglia, the Department of State
reviewer assigned to this project, at Joseph.Sgueglia@dos.ny.gov or (518) 474-1737 to discuss
applicable LWRP policies and concerns, and any additional information which may be necessary
to assist you in reviewing this project. Any comments you may have will assist the Department
of State in reaching a decision as to the consistency of the proposed action with the approved
Village of Croton-on-Hudson LWRP.
We would appreciate hearing from you on this proposed project within 30 days. If we do
not hear from you by that date, we will presume that you have no objections to the
proposed project.
Machine-extracted for search and reference — the original PDF is the authoritative version.