CHUFSD 26-27 Budget General, Operations & Maintenance, and Transportation 2.26.2026
budget
57 pages
From the meeting:
Board of Education — 2026-02-26
· our coverage →
Agenda item: Presentation - 2026-2027 Budget Presentation
Budget document, 57 pages. Attached to agenda item: “Presentation - 2026-2027 Budget Presentation”
Retrieved 2026-07-13 from the village's meeting portal.
View the original PDF ↗
Extracted text
Budget Work Session
February 26, 2026
2026-27 Budget - General, Transportation, and Operations & Maintenance
Budget Presentation
February 26, 2026
2026-2027 School Year - Croton-Harmon UFSD
1 Vision Map
2 General Support
3 Benefits
4 Debt Service & Transfers
5 Transportation
6 Buildings and Grounds
7 A Look Ahead
CHUFSD Vision Map
2026-27
General Support,
Benefits & Debt Service
Budget
2026-27
2026-27
2026-27
2026-27
2026-27
2026-27
2026-27
Transportation Budget
February 26, 2026
Transportation 2026-2027 Proposed Budget
Transportation Capital Reserve ~ $100,000
Vehicle Replacement Needs for 2026-2027
Transportation Capital Reserve - ~ $100,000
1 - 66-Passenger Diesel Bus - (current cost - $194,064)
1 - 30-Passenger - (current cost - $111,022)
1 - SUV Hybrid - (current cost - $63,741)
No tax impact or borrowing required
Potential use of reserve funds to support the continued advancement and
evaluation of our electric vehicle charging infrastructure and management
system to promote long-term efficiency, reliability, and sustainability.
Current Year Appropriations - ~ $400,000
Our buses drive nearly 500,000 miles annually
Where We Go & What We Do
Mileage guideline for student ridership
• Over 1,100 students transported daily
• 20 different schools
• Daily athletic and class trip events
• K-4 grades – 3/10 mile or more
• Grades 5-12 – 9/10 mile or more
• Non-public schools-up to 15 miles
Our Department
The Department
➔
Full-service garage
➔
Exceptional DOT (Dept
of Transportation)
Rating
➔
Twice monthly DOT
inspections requiring
six(6) spare vehicles for
each inspection at all
times.
Our Vehicles
➔
58 Total Vehicles
➔
17 - 66 Passenger Buses
➔
4 - Electric 66 Passenger
Buses (#5 on the way)
➔
26 - Minibuses and
Caravans
➔
4 - SUV’s - Hybrid
Facility Vehicles
➔
11 - Trucks/Trailers
➔
1 - Toyota Prius (Hybrid)
MEET OUR TEAM
●1 - Head Bus Driver
●32 - Ten-Month Drivers
●14 - Ten-Month Monitors
●2 - 11-Month Dispatchers/Drivers
●4 - Mechanic Bus Drivers
Departmental Efficiencies
• Reciprocal Transportation Agreements
with surrounding districts to minimize
costs
• Each shared bus run saves $40,000+ in
electricity/fuel, labor and vehicle costs and
reduces greenhouse gases
• OGS Fuel Contract
• Automation of 19A reporting,
maintenance and compliance
• Route Optimization
• Transfinder Pro Implementation
• Infinite Campus integration is live for
parents & staff access to routing
information
• Enables the district to contact
families directly throughout the year
and during emergency situations,
saving time and resources.
• Stop-Arm Camera Technology
Implemented as of 1/23/26 - 6
Installs Remaining
Team Building Events
Operations & Maintenance
Budget
February 26, 2026
Operations & Maintenance 2026-2027 Proposed Budget
Our Facilities Team: Keeping Operations Running Smoothly
Facilities Office
●
Director of Facilities
●
Office Assistant
●
PT Mail Courier
Maintenance and Grounds
●
2 Maintenance Mechanics
●
2 Custodians - Assigned to Grounds
Schools
●
1 Head Custodian - (per school)
●
1 Day Custodian - (per school)
●
2 Night Custodian - (per school)
●
1 Night Cleaner - (per school)
Part-time/Seasonal
●
Sub Custodians
●
High School Summer Helpers
Facilities Staff Spotlight
Promotions
Ismael Rama - CET Head Custodian
Mike Hanney - CHHS Head Custodian
New Hires
Lora Anderson - Facilities Office
John Hrycko - CHHS Night Custodian
Peter Perez - PVC Cleaner
Chris Callahan - PVC Night Custodian
Jerald Blackwell - CET Cleaner
Facilities Department Training: Building
Excellence Together
BOCES Lead Training Dec. ‘25
●Lockout / Tagout
●Confined Space Awareness
●SDS / Chemical Inventory
●Spill Response
Snow Stats
CET
●
3,900 Linear Feet of Sidewalks and Stairs
●
87,100 sq ft of Parking Lots and Driveways
PVC
●
2,500 Linear Feet of Sidewalks and Stairs
●
55,500 sq ft of Parking Lots and Driveways
CHHS
●
2,200 Linear Feet of Sidewalks and Stairs
●
75,000 sq ft of Parking Lots and Driveways
Bus Garage
●
300 Linear Feet of Sidewalks and Stairs
●
38,700 sq ft of Parking Lots and Driveways
District Wide
●
1.7 Miles of Sidewalks and Stairs
●
5.4 Acres of Parking Lots and Driveways
CET Elementary School
• Built in 1954
• 97,910 sq ft
District Office
• Built in 1999
• 3,000 sq ft
Grounds Building
• Built in 2019
• 2,579 sq ft
Our Buildings
PVC Middle School
• Built in 1939
• 137,668 sq ft
Bus Garage
• Built in ~1980
• 8,200 sq ft
Concession Stand
• Built in 2025
• 720 sq ft
Croton Harmon HS
• Built in 1924
• 137,945 sq ft
Maintenance Shop
• Built in 2000
• 645 sq ft
Press Box
• Built in 2025
• 192 sq ft
District Wide Total Building sq ft 388,859
Work Responsibilities
Maintenance Team
• HVAC
• Plumbing
• Electrical
• Carpentry
• Windows
• Phones
• Ceilings
• Tech
• BMS
• Cameras
• Doors
• Locks
• PA System
• Security
• Card Access
• Wall Repairs
• Tile & Flooring
• White Boards
• Cabinets
• Furniture Assembly
• Water Filters
CHHS ~ 1920’s
Substantial Increase in Maintained Spaces & Assets
●Additional AC at Schools
●Kitchen added at PVC
●Kitchen and Cafe added at HS
●Serving line at CET
●HVAC Equipment, Ice
Machine, and Bathrooms at
Concession Stand
●Water Fountain / Bottle
Fillers DW
●Display boards DW
●Badge Access / Electronic
Door Locks
●Hudl Sports Cameras
Contracted Services
●
HVAC – Filters, Motors, Electronics, Pumps Preventative
Maintenance/Service/Inspections
●
Plumbing – Repairs, Drain Cleaning, Acid Waste Management
●
Electrical/Alarm/Fire/Security/PA/Elevator – Multiple
Contracts
●
Doors/Windows – Hardware, Keying, Blinds, Glass
●
Janitorial – Disinfectant, Cleaning Materials, Mats/Mop
Cleaning, Pest Control, Equipment Repair
●
Grounds – Tree/Service, Poison Ivy, Athletic Field Supplies,
Equipment Repairs
●
Play Areas – Inspections & Maintenance
●
Other – Equipment Replacements, Appliance/Repair,
Painting, Water Treatment, Abatement Services
PVC Construction August 1939
High School Main Gym
Non-Future Facilities Projects Highlights
High School Trainers Room
• Paint
• Video board
• Scoreboard and shot clocks
• Casework
• Paint
Non-Future Facilities Projects Highlights
Bus Garage Upgrades
●
Epoxy floor coating
●
New bus lift
●
New LED lighting
●
Air compressor & air piping system
●
Additional electrical receptacle
Future Facilities Project: Then & Now
HS Auditorium
Future Facilities Project: Then & Now
HS Cafeteria / Kitchen
Future Facilities Project: Then & Now
HS Innovative Learning Center
Future Facilities Project: Then & Now
HS Music Suite
Future Facilities Project: Then & Now
PVC Student Support Suite
Future Facilities Project: Then & Now
PVC Flex
Future Facilities Project: Then & Now
PVC Outdoor Learning Courtyard
Future Facilities Project: Then & Now
PVC Field and Playground
Future Facilities Project: Then & Now
CET Multipurpose Room
Future Facilities Project: Then & Now
CET Library
Future Facilities Project: Then & Now
CET Gym
Future Facilities Project: Then & Now
Spencer
Track & Field
Possible EPC Opportunities
●
With completion of the roof replacements, there is now an opportunity to
expand solar arrays
Solar Stats
24/25 Total kWh Use:
1,814,725.18
24/25 Solar Production
of Overall Use: 17.38%
Solar Stats
24/25 Total Electric Purchase Avoidance From Solar Production:
$60,096.42
Transforming Our Heating: From Fossil
Fuel Tanks to Electric Heat Pumps
●
Summer of 2024 - Removed 10k gal oil tank at PVC
●
Summer of 2025 - Removed 10k gal oil tanks at CET & CHHS
●
Campuses are no longer PBS (Petroleum Bulk Storage) sites -
$3,000 savings on UG Tank Insurance
●
Heat Pumps Added
○
CET - 8
○
PVC - 3
○
CHHS - 9
Cool Learning Environments
• CET AC Additions
• 8 classroom
• Music & Art classrooms
• Multi-Purpose Room
• PVC AC Additions
• Student Support Suite
• Teachers Hub
• CHHS AC Additions
• Cafeteria
• Music Room
• 6 classrooms
• Fabrication Room
Final Phase - Tentative Summer ‘26 Construction
●
PVC: Additional AC installation for roughly 10 classrooms
●
CET Tennis Courts: Sports Lighting
●
CET: New Playground Equipment
AC Looking Forward
●
CET - 100% of classrooms have AC
○
All Spaces except Gym, hallways, and bathrooms have AC
○
Electrical Service Upgrade required for additional AC
installations
●
PVC - ~71% of classrooms will have AC upon completion of Final
Phase work*
○
1st floor - 2 out of 8 classrooms will have AC
○
2nd floor - 12 out of 14 classrooms will have AC
○
3rd floor - 5 out of 8 classrooms have AC
○
4th floor - All classrooms will have AC
○
Close to maxing out electrical capacity - needs further
evaluation
AC Looking Forward
●
CHHS ~50% of classrooms have AC
○
1st floor - 5 out of 11 classrooms have AC
○
2nd floor - 13 out of 23 classrooms have AC
○
3rd floor - 4 out of 10 classrooms have AC
○
Electrical Service Upgrade required for additional AC
installations
District Wide
~70% of
Classrooms will
have AC upon
completion of
the Final Phase
From Reactive to Proactive: Tech-Powered Facilities Care
●
iPads deployed to maintenance staff and
each building
○
Electronic access to documents &
blueprints
○
Electronic forms
○
Master Library Work Orders and
Drawings
○
Troubleshooting HVAC issues in the
field with remote access to BMS
Work Orders:
•
Tracking hours &
categories
Drawings:
•
Inventory of
equipment
•
Photos
•
Track WO history
•
Upload & View
manuals
•
See locations
From Reactive to Proactive: Tech-Powered
Facilities Care - Master Library
Preventative
Maintenance:
●
Set up automatic
WOs for PMs
based on
manufacturers
recommendations
Viking Pure Solutions
✓ Jan 8: Budget Development Update
✓ Feb 12: Revenue Budget Summary
✓ Feb 26: General Support, Operations, & Propositions
❏Mar 12: Vision Map, Technology, & Athletics
❏Mar 26: School Budgets, Curriculum, & Pupil Personnel
❏Apr 9: Superintendent’s Proposed Budget
❏Apr 21: Budget Adoption, PTRC and BOCES Admin Budget Vote
❏May 7: Public Budget Hearing
2026-27 Presentation Schedule
Vote Day Information
Tuesday, May 19, 2026
●
Time: 6:00 AM - 9:00 PM
●
Location: Croton-Harmon High School (CHHS)
On the Ballot:
●
Budget Vote
●
Trustee Election (3 Seats)
●
Propositions
Event: Tenure Celebration at 7:00 PM
5/19/2026
5/19/2026
Stay Connected
Facebook
@CrotonSchools
Instagram
@CrotonSchools
Do you have questions about the 2026-2027 budget?
You can email your questions to:
Budget.Questions@chufsd.org
@
Machine-extracted for search and reference — the original PDF is the authoritative version.