croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2026-07-15

F-2026-0322 LWRP Memo

resolution 1 page
From the meeting: Board Of Trustees — 2026-07-15 · our coverage →
Agenda item: Consent Agenda — Resolutions — Consider determining the placement of a new overhead sign structure along Route 9 is consistent with the Village's Local Waterfront Revitalization Program.
Resolution, 1 page. Attached to agenda item: “Consent Agenda — Resolutions — Consider determining the placement of a new overhead sign structure along Route 9 is consistent with the Village's Local Waterfront Revitalization Program.”
Retrieved 2026-07-14 from the village's meeting portal. View the original PDF ↗
Memo from the New York Department of State, dated June 16, 2026, transmitting for preliminary review the application package for project F-2026-0322, in which NYSDOT would replace 13 existing overhead sign structures, including one on US 9 in the Village of Croton-on-Hudson, and install new guiderail where existing rail is below standards. The memo asks the Village LWRP coordinator to respond within 30 days, after which the Department will presume no objections to the proposed project.
AI summary — generated from the document text; check the original before relying on details
Also attached to this agenda item: F-2026-0322 Combined LWRP NYSDOT Overhead Sign Memo to VB re Overhead Sign Resolution 166-2026 LWRP Consistency Rte 9 sign
O N E C O M M E R C E P L A Z A 99 W A S H I N G T O N A V E N U E ALBANY, NY 12231-0001 HTTPS://DOS.NY.GOV KATHY HOCHUL GOVERNOR W A L TE R T. M O S L E Y S E C R E T A R Y O F S T A T E NYS DEPARTMENT OF STATE OFFICE OF PLANNING, DEVELOPMENT AND COMMUNITY INFRASTRUCTURE M E M O R A N D U M To: Pauline DiSanto, Water Advisory Committee Chairperson, LWRP Coordinator, Village Croton-on- Hudson Alicia Boudreau, Treasurer, LWRP Coordinator , LWRP Coordinator, Village of Haverstraw From: NYS Department of State, Coastal Consistency Unit Date: June 16, 2026 Re: F-2026-0322: New York State Department of Transportation -Replace 13 existing overhead sign structures to ensure their ability to safely carry overhead signs and to protect the roadway and its users. Install new guiderail in some places where it is not currently up to standards. The new structures will be designed and constructed to be 10 to 15 feet behind the existing structures in the direction of travel. Some excavation is required. The new structures will have 15 to 27 feet deep foundations on spread footings, and shaft foundations with a diameter of 3.5 to 4 feet that are drilled, Reference marker: 987032164 Sin-87011, US 9 Village of Croton- on- Hudson, Reference marker 9W85011135 Sin 85008 Village of Havershaw * * * * Enclosed is a copy of the application package for the above-referenced project for your information and preliminary review. Please contact Barbara Delaney, the Department of State reviewer assigned to this project, at Barbara.Delaney@dos.ny.gov or (518) 473-7573 to discuss applicable LWRP policies and concerns, and any additional information which may be necessary to assist you in reviewing this project. Any comments you may have will assist the Department of State in reaching a decision as to the consistency of the proposed action with the approved Village of Croton- on- Hudson LWRP and Village of Havershaw. We would appreciate hearing from you on this proposed project within 30 days. If we do not hear from you by that date, we will presume that you have no objections to the proposed project.

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.