Resolution 170-2026 Salt Shed
resolution
1 page
From the meeting:
Board Of Trustees — 2026-07-15
· our coverage →
Agenda item: Consent Agenda — Resolutions — Consider authorizing the submission of a Water Quality Improvement Project grant for the relocation of the Village's salt shed.
Resolution, 1 page. Attached to agenda item: “Consent Agenda — Resolutions — Consider authorizing the submission of a Water Quality Improvement Project grant for the relocation of the Village's salt shed.”
Retrieved 2026-07-14 from the village's meeting portal.
View the original PDF ↗
Resolution 170-2026, dated July 15, 2026, authorizing the Village Manager to apply for $600,000 under the state DEC Water Quality Improvement Project salt storage grant to remove the existing salt shed at Veterans Plaza and build a new salt storage structure on Westchester County-owned land in Croton Point Park. The project's estimated cost is $750,000, with the Village committing a $150,000 match if the grant is funded.
AI summary — generated from the document text; check the original before relying on details
Extracted text
On motion of TRUSTEE ---, seconded by TRUSTEE ---, the following resolution was
adopted by the Board of Trustees of the Village of Croton- on- Hudson, New York with
a - vote.
Resolution #170-2026
RESOLUTION AUTHORIZING SUBMISSION OF WATER QUALITY
IMPROVEMENT PROJECT (WQIP) SALT STORAGE GRANT
APPLICATION FOR SALT SHED CONSTRUCTION AT CROTON POINT
PARK
WHEREAS, to improve water quality and enhance flood and climate resiliency, the
Village of Croton-on-Hudson is looking to remove the existing salt shed at Veterans
Plaza and build a new salt storage structure on a new site owned by Westchester
County in Croton Point Park (“Project”); and
WHEREAS the Village of Croton-on-Hudson is seeking funding under the NYS
Department of Environmental Conservation (DEC) WQIP grant; and
WHEREAS, the cost estimate for the Project is $750,000; and
NOW, THEREFORE, BE IT FURTHER RESOLVED that the Board of Trustees of
the Village of Croton-on-Hudson hereby authorizes the Village Manager to take all
necessary action to submit an application for $600,000 in DEC’s Consolidated Funding
Application (CFA) to design and construct the new salt storage structure upon the
funding of said amount, commits to provide the match of $150,000.
Dated: July 15, 2026
Machine-extracted for search and reference — the original PDF is the authoritative version.