From the meeting:
Board of Trustees Work Session — 2026-06-24
· our coverage →
Agenda item: Review of potential RFP for battery energy storage systems (BESS) at Village-owned properties with Lindsay Audin, Sustainability Committee Chair.
Bid / RFP, 10 pages. Attached to agenda item: “Review of potential RFP for battery energy storage systems (BESS) at Village-owned properties with Lindsay Audin, Sustainability Committee Chair.”
Retrieved 2026-07-14 from the village's meeting portal.
View the original PDF ↗
A presentation to the Village Board of Trustees dated June 24, 2026, by Lindsay Audin, chair of the Croton Sustainability Committee, on revenue from hosting battery energy storage systems (BESS) on Village-owned land, with the Pumphouse Road campus cited as an example site. Audin says developers are paying roughly $30,000 to $40,000 per megawatt per year to rent sites, so a 5 MW system on Village property could boost Village revenue by $150,000 to $200,000 per year. He asks the Village to pay a local consultant $2,000 to help him run the site list, RFI/RFP and bid-analysis work, which he says could be completed by early fall.
AI summary — generated from the document text; check the original before relying on details
Extracted text
Revenue Opportunities From
Revenue Opportunities From Batt
Battery Energy Storage Systems (BE
(BESS) In CrotonPresented to Croton’s Village B
Presented to Croton’s Village Board of TrusteesJune 24, 2026
June 24, 2026b
by (Mr.) Lindsay
y (Mr.) Lindsay Audin
AudinCEM LEED
CEM LEED-AP
APchair, Croton Sustainability
chair, Croton Sustainability Committee
Committee
BESS As An Opportunity, Not A Risk
BESS As An Opportunity, Not A RiskVia
Via its local
its local government, a community can
government, a community can secure fi
secure financial benefits from a BESS.Due to recent
Due to recent changes in federal incentives, a “batte
a “battery gold rush” has BESS developers seeking p
seeking potential sites in our region.Some property o
Some property owners are now sharing in that opport
that opportunity by utilizing available sites and power
and power lines for commercial-scale BESS.
scale BESS.Think o
Think of a BESS as an “avenue to revenue
avenue to revenue.”
.”2
BESS Come In Several Sizes
BESS Come In Several Sizes
(EV battery is ~50-100 kWh)
All help reduce grid stress, cut GHGs, support renewable energy, and other non-financial benefits.
Croton’s 3.5 MW / 15
Croton’s 3.5 MW / 15 MWhr
MWhrBESS…
BESS……has ~100
…has ~100 tons of lithium
lithium-iron
iron-phosphate
phosphate(LFP)
(LFP) batte
batteries in four ~50-foot white steel cabinets. The
foot white steel cabinets. They are
are heavier/larger than
than the old Li
the old Li-I NMC units, but
I NMC units, but LFPs
LFPs have a much better fire safety record.Each cabin
Each cabinet holds
holds hundreds of batteries, each
hundreds of batteries, each enclose
enclosed in a plastic housing. They
housing. They hold enough
hold enough power
power to run ~700 average homes for 24 hours.
homes for 24 hours. Our sy
Our system is charged up by the ~4.2 MW of solar pane
panels atop the canopies. Due to changes in BESS ince
incentives, “standalone” installations (i.e., no solar) are
are now instead the norm.4
But Why Host
But Why Host Another
AnotherBESS?
BESS?Think of it as
Think of it as a big ATM that dispenses wealth.A B
A BESS “arbitrages” the value of
“arbitrages” the value of electricity
electricity by
by char
charging up when
up when wholesale
wholesale power
power pricing is
pricing is low
low, and discharging
, and discharging when it
when it spikes
spikes, earning a
, earning a bundl
bundle off the spread. It also gets $ from grid “ancil
“ancillary services”
services” and govt. incentives
and govt. incentives.So
So -what might that be worth to Croton?
what might that be worth to Croton?To rent a
To rent a site, developers are paying ~$30,000 to ~
to ~$40,000 per
peryear
year per
perMW.
MW. 5
5A
A 5 MW system
5 MW system on
on Village property could
Village property could boost
boost Village annual
Village annual rev
revenueby
by $150,000
$150,000 to $200,000 per
to $200,000 per year.
year.
BESS Installations Are Now Standardized
BESS Installations Are Now Standardized As
As of
of 1/1/2026, NY
1/1/2026, NY State’s fire
State’s fire code
code adopted NFPA
adopted NFPA-855
855 specs for
specs for BESS
BESS project
project design
design, installation
, installation, etc
, etc.Product
Productspecs
specs are now standard
are now standard in
in the
the industry and
industry and adhere
adhere to
to both UL
both UL codes and to NYSERDA standards.
codes and to NYSERDA standards.6
Yorktown 5 MW BESSFollo
Following those stds
stds./specs enforces fire safety
./specs enforces fire safety.
BESS Opportunities in Croton
BESS Opportunities in CrotonThe Village own
The Village owns plots of land that could be reviewed as potential BESS
could be reviewed as potential BESS sites, e.g.,
sites, e.g., Pumphouse
PumphouseRoad campus.
Road campus.Each must be near a power line wi
Each must be near a power line with “hosting capacity”, i.e., able to supp
“hosting capacity”, i.e., able to supply power to, and accept power from,
power to, and accept power from, a BESS. Croton has several, e.g., the
BESS. Croton has several, e.g., the one serving the train station PV/BE
one serving the train station PV/BESS.BESS
BESS developers identify and qualify
developers identify and qualify such sites. Through a competitive b
such sites. Through a competitive bid, the winner is the one who offers t
the winner is the one who offers the highest rent
highest rentto use the best site(s).
to use the best site(s).7
8To pu
To pursue these competitive opportunities requires a lot of work, e.g., cr
e.g., create lists of acceptable sites and qualified developers, write/dist
write/distribute a RFI and RFP, analyze/compare/summarize bids, propos
propose a winner, etc.I’m asking the Village to
I’m asking the Village to pay a local consultant $
pay a local consultant $2,000 to help me
2,000 to help me do it
do it. In 2024, they did a great job managing the renewal of our
. In 2024, they did a great job managing the renewal of our Silver C
Silver Climate Smart Community (CSC) Certification.Based on a detail
Based on a detailed Scope Of Work (SOW) approved by the Village Man
Village Manager, we could complete the work by early fall. Doing so woul
so would expedite identifying an acceptable site and reserving the requi
the required hosting capacity beforeit’s gone.
it’s gone.What Lindsay W
What Lindsay Wants
Thank you for
Thank you for your
your time and a
time and attention.
.
Machine-extracted for search and reference — the original PDF is the authoritative version.