NYSDE PPP 2026-06-02 - Draft Version
correspondence
29 pages
From the meeting:
Board Of Trustees — 2026-07-01
· our coverage →
Agenda item: Consent Agenda — Correspondence to the Board — Public Participation Plan from James J. Hahn Engineering for the Village of Buchanan Wastewater Treatment Plan.
Correspondence, 29 pages. Attached to agenda item: “Consent Agenda — Correspondence to the Board — Public Participation Plan from James J. Hahn Engineering for the Village of Buchanan Wastewater Treatment Plan.”
Retrieved 2026-07-14 from the village's meeting portal.
View the original PDF ↗
A Public Participation Plan prepared by James J. Hahn Engineering for the Village of Buchanan's proposed expansion of its wastewater treatment plant on Greentown Road, which would raise the allowable discharge from 0.50 MGD to 0.75 MGD under a revised SPDES permit (NYSDEC application 3-5522-00007/00002). The plan, required under NYSDEC environmental justice policy CP-29, outlines public meetings, fact sheets and stakeholder outreach for the permit review. It says the added capacity would serve two large multi-family residential projects, wastewater from the Town of Cortlandt and land redevelopment as Indian Point decommissions, with sludge hauling expected to rise from approximately 7 to approximately 9 trucks per week.
AI summary — generated from the document text; check the original before relying on details
Extracted text
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
PUBLIC PARTICIPATION PLAN
Applicant:
Village of Buchanan
Facility:
Village of Buchanan Wastewater Treatment Plant
Greentown Road, Buchanan, NY
NYSDEC Application Number:
3-5522-00007/00002
As Required by:
NYSDEC Commissioner’s Policy Guidance CP-29
Submitted to:
New York State Department of Environmental Conservation
21 South Putt Corners Rd
New Paltz, NY 12561-1696
Prepared by:
James J. Hahn Engineering, P.C.
1689 Route 22
Brewster, NY 10509
Date:
July 28, 2025
Rev. November 7, 2025
Rev. May 27, 2026
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
TABLE OF CONTENTS
I.
Introduction and Objective
II.
Project Description and Proposed Action
• Project Overview
• Nature of Proposed Project/Action and Purpose
• Potential Impacts
III.
Stakeholder Identification & Contact List
IV.
Project Liaison
V.
Public Outreach Activities
• Public Meeting(s)
• Virtual Public Meeting Notice Preparation and Distribution
• Fact Sheet Preparation and Distribution
• Distribution of Notice of Complete Application
VI.
Document Repository
VII.
Submissions
• Progress Report
• Final Summary Report and Written Certification
Figures
1. Project Location & Potential Environmental Justice Area Map
2. Project Location & NYS Disadvantage Communities (DAC) Map
Appendix
A. Contact List
B. Virtual Public Meeting Notice
C. Fact Sheet
D. Project Site Map
E. Existing Burden Report
List of Acronyms
Acronym
Definition
CP-29
Commissioner Policy 29, Environmental Justice and Permitting
DAC
Disadvantage Community
EBR
Existing Burden Report
MGD
Million Gallons Per Day
NOCA
Notice of Complete Application
NYSDEC
New York State Department of Environmental Conservation
PEJA
Potential Environmental Justice Area
PPP
Public Participation Plan
SPDES
State Pollutant Discharge Elimination System
WWTP
Wastewater Treatment Plant
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
I. INTRODUCTION AND OBJECTIVE
This Public Participation Plan (PPP) has been prepared by Village of Buchanan (hereinafter
referred to as “applicant”) to fulfill and comply with the requirements of New York State
Department of Environmental Conservation Commissioner Policy 29, Environmental
Justice and Permitting (CP-29) for their proposed Wastewater Treatment Plant
Expansion, that requires a revision to the Village’s SPDES Discharge Permit application
and which has been determined by NYSDEC to potentially impact one or more potential
environmental justice area (PEJA) and disadvantage community (DAC) (See Figures 1 and
2, respectively). An existing burden report (EBR) has been prepared and is included herein
as an appendix.
This PPP has been developed in accordance with the procedures established in CP-29
Section V.D and it aims to help ensure meaningful and effective public participation
throughout the NYSDEC environmental permit review process. Public participation in the
NYSDEC environmental permit review process means a program of activities that provides
opportunities for stakeholders to be informed about and involved during the review of a
proposed action.
The objective of this PPP is to outline and describe the program of activities that the
applicant will implement to actively seek and enhance public participation during the
application review process.
Figure 1. Project Location & Potential Environmental Justice Area (PEJA) (Source: NYSDEC Tools for Environmental Justice)
Project Location
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Figure 2. Project Location & NYS Disadvantage Communities (DAC) (Source: NYSDOS Geographic Information Gateway)
II. PROJECT DESCRIPTION AND PROPOSED ACTION
Project Overview
The applicant proposes to increase the allowable discharge from the Village of Buchanan
Wastewater Treatment Plant on Greentown Road from 0.50 MGD to 0.75 MGD. To
implement the proposed project, the applicant has submitted an application to the New York
State Department of Environmental Conservation (NYSDEC) for a revision to the WWTP’s
SPDES Discharge Permit to increase the allowable discharge rate.
Nature of Proposed Project/Action and Purpose
The proposed action is for the increase in the allowable discharge from the Village of
Buchanan Wastewater Treatment Plant from 0.50 MGD to 0.75 MGD. The proposed
increase in allowable discharge would allow the WWTP to process more wastewater from
the Village and neighboring communities. The Village has recently committed to treating
the wastewater from two large multi-family residential projects and wastewater from the
Town of Cortlandt. Additionally, as the Indian Point Energy Center decommissions, land will
become available for redevelopment. To enable these new projects, the Village’s WWTP
needs the necessary capacity and discharge limits to process the additional wastewater.
Project Location
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
The proposed increase in allowable discharge will not significantly increase the footprint of
the existing treatment system. New aeration equipment that the Village is required to install
would be sized for the additional flow rates.
The WWTP currently operates 24 hours, seven days a week. The increase in the discharge
permit would not change the operating hours of the WWTP.
The Village currently uses Allied Pollution Control (APC) and Village staff to oversee
operation of the WWTP. A licensed operator from APC visits the WWTP every work day.
The Village employes a full-time staff employee to assist the operator in plant operations
and to quickly respond to emergencies. It is anticipated that additional staff would not be
required to operate the plant at a higher flow rate. The licensed operator would continue to
visit the WWTP every workday.
A Project Site Map is provided in Appendix D.
Potential Impacts
The direct potential impacts are anticipated to be limited. There may be temporary impacts
during construction, but there should be no adverse direct impacts to the environment as a
result of this action. There will also be indirect impacts as a result of the project.
Temporary Impacts:
The construction required for the expansion of treatment capacity will depend upon grant
funding. During construction one tank will be taken offline and reconstructed. Once the first
tank is completed and accepted, the second tank will be reconstructed. As each treatment
tank is sized for the maximum capacity, taking one offline will not significantly adversely
impact the Village’s treatment system. As there are no residences abutting the WWTP
property or along Greentown Road, construction activities, including, noise, dust, and
vehicles, will not have an impact on Village residents. It not anticipated construction vehicles
accessing the WWTP property along Greentown Road would have a negative impact to the
commercial properties on Greentown Road.
Direct Impacts:
The increase in treatment capacity at the WWTP will not have direct adverse impacts on
the environment. The physical footprint of the treatment system would be similar to the
existing treatment tanks. As a result, there will be no significant increase in stormwater
runoff. Additionally, all work will be performed within previously disturbed areas. Natural
environment disturbance, such as tree removal or animal habitats, are anticipated to be
impacted.
Wastewater will be treated to applicable standards and discharged into the Hudson River
at Lent’s Cove. The additional flow into the Hudson River will not have a significant impact
on the river.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
The additional treatment will not result in a significant increase in noise or odor. Truck traffic
at the WWTP may increase due to additional sludge hauling. By increasing the WWTP
allowable discharge, the Village could expect an increase in sludge hauling from
approximately 7 trucks per week to approximately 9 trucks per week. The actual increase
would be dependent on plant efficiency. Truck traffic would likely travel down Greentown
Rd and Bleakley Ave to Albany Post Rd (NYS Route 9A) or down Greentown Rd and
Bleakley Ave to Westchester Ave. Either route is primarily through commercial and light
industrial zones. Approximately 11 residences would be affected by traveling towards
Albany Post Road and 9 residences would be affected by traveling towards Westchester
Ave. The traffic increase is not anticipated to significantly adversely impact surrounding
properties.
It is likely electrical usage at the WWTP would increase. The increase in usage would not
be significant and would be offset by the additional sewer rates collected.
As mentioned above, the potential increase is not anticipated to result in an increase in
staffing or operator requirements at the WWTP. One licensed operator would visit the
WWTP each work day. One Village staff will assist the operator.
Indirect Impacts:
As a result of the increase in the discharge permit, the Village will be able to treat more
wastewater at the WWTP. This would enable more development projects and sewer
services in the Village. Those indirect impacts are subject to individual design projects and
cannot be quantified or evaluated as part of this project. As result, indirect impacts are not
further considered.
III. STAKEHOLDER IDENTIFICATION & CONTACT LIST
A contact list consisting of the names, addresses, phone numbers, or email addresses of
stakeholders to the proposed action is provided in Appendix A. The contact list includes
individuals and organizations with a direct stake in the proposed action and people and
individuals and organizations that have expressed interest in the proposed project or similar
projects affecting the same neighborhood or community.
To develop a draft contact list, the applicant reached out to residents/neighborhood groups
who are near or adjacent to the proposed project and that will be or potentially will be
affected by the project; community boards, community leaders, local community, civic and
recreational organizations, and environmental and business groups to help identify
stakeholders and develop an initial contact list.
The current contact list has been developed in consultation with NYSDEC by identifying
stakeholders from the following categories: local government and elected officials; business
owners, residents, and occupants; local civic, community, environmental and religious
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
organizations; local news media; administrator/operator of any school or day care that live,
work and/or represent a neighborhood or community within 500 feet of the project area.
The applicant will utilize this contact list to communicate and disseminate information about
the proposed project/action and permit application review process to the affected
community and stakeholders. At minimum, this includes distribution of the written
information and outreach materials described in Section V to inform the community about
upcoming public meetings and opportunities for public participation.
The contact list will be reviewed periodically and updated as appropriate throughout the
permit application review process. The applicant will update the contact list with any new
stakeholders identified during the public meeting or execution of other PPP components. In
addition, individuals and organizations will be added to the contact list upon request. Such
requests should be submitted to the project liaison identified in Section IV. Other additions
to the contact list may be made at the discretion of the applicant or, at the request of the
NYSDEC project manager, in consultation with other NYSDEC staff, as appropriate.
IV. PROJECT LIAISON
A representative from the project team will be available during business hours at:
Marcus Serrano, Village Administrator
914-737-1033
mserrano@buchananny.gov
236 Tate Avenue, Buchanan, NY 10511
Impacted residents and interested stakeholders can contact the project liaison listed above
to provide input to the project team, discuss any issues or concerns and/or to ask questions
or request information. The project liaison shall respond in a timely manner and in the
manner appropriate to question or information request received. The project liaison will be
responsible for tracking and documenting public input, inquires, questions, and information
requests received, along with responses provided.
V. PUBLIC OUTREACH ACTIVITIES
The applicant will utilize a range of engagement strategies and conduct various public
outreach activities to facilitate participation, involvement, and direct communication with the
affected community during the permit application review process. The applicant will
implement the public outreach activities outlined below upon finalization and approval of
this PPP by NYSDEC.
In compliance with the requirements of CP-29, the applicant will hold public information
meeting(s) to keep the public informed about the proposed action and the environmental
permit review process. At minimum, the applicant will prepare, distribute and post written
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
information and materials, including a meeting notice and fact sheet, to encourage dialogue
and solicit input from interested stakeholders during the permit application review process.
All public outreach materials and information will be prepared and presented in an easy-to-
read, understandable format, using plain language free of legal terminology, and geared
towards a non-technical audience.
The public meeting notice and fact sheet will be made available and disseminated in
English. In addition, the public can contact the project liaison regarding the availability of
language assistance and to request that the notice and fact sheet are translated into another
language for comprehension by non-English speaking or limited proficiency stakeholders.
Public Meeting(s)
At the discretion of NYSDEC and, depending on the scale and nature of a project, one or
more virtual public meeting(s) must be conducted to satisfy the intent of CP-29.
A meeting is typically required near the end of the permit application review process to
inform the public about: the status of, or, if applicable, the availability of, final application
materials and draft permits for review; the pending NYSDEC public comment period, and
deadline to submit written comments to NYSDEC, if established; and eventual final
decision. Meetings may also be held earlier, either pursuant to this plan or possibly even
earlier during the initial design phase. If meetings were held prior to submission of this PPP,
a summary of them would be included as an appendix.
Public Meeting: At or Near Completeness
The Applicant will facilitate a virtual public meeting on June 2, 2026 and July 7, 2026 at
7:00 p.m. to:
Inform the public about the proposed project/action and permit application review
status.
Provide the opportunity to for stakeholders to ask questions and express
concerns about the project and identify how to obtain information or answers to
questions after the meeting has concluded.
Inform attendees how they may submit written comments on the permit
application to the NYSDEC during the public comment period and, if available,
identify any applicable deadlines.
Necessary Meeting Discussion Points and Requirements
All meetings will be facilitated by the applicant and/or representatives from their project
team
(project
personnel)
via
a
link
posted
on
the
Village
Website
(https://buchananny.gov/meeting-videos). During the meeting, the applicant and/or
representatives from their project team will present a brief overview of the project, including
any relevant background information, details on the permitting action, scope of work,
schedule, and community impacts. The second part of the meeting will include a question-
and answer-portion where the floor will be open for attendees to ask questions, make
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
remarks, and/or express concerns. In addition, the following discussion points will be
addressed:
• Provide an update on the permit application review process and identify outstanding
application requirements and future milestones in the application review process.
• Make it clear that the meeting is being held prior to NYSDEC’s permitting decision
for the project/action.
• Identify the location of the online document repository and provide directions on how
attendees may obtain and review materials relevant to the application, documents
related to the meeting and other public participation plan components.
• Identify and provide contact information for the project liaison and announce
procedures for how attendees may obtain answers to questions after the meeting
has concluded and interested stakeholders can submit questions, express concerns,
or request additional information by telephone, email, and in writing.
• Announce any future outreach, opportunities for public participation, and /or required
follow-up with attendees including, but not limited to: additional meetings and future
mailings, including, but not limited to the Notice of Complete Application.
Attendance will be recorded during the virtual meeting by virtual sign-in sheet and recording
of the virtual meeting. The applicant will track the number of attendees for all meetings held
during implementation of this PPP and, where feasible and applicable, identify any affiliation
of participants and interests represented at the meeting. In addition, the applicant will be
responsible for documenting meeting notes or minutes, along with a record of comments
and questions raised in the meeting and respective responses and answers provided.
Attendees not identified on the contact list will have the option to be added in the event of
future meetings or information sharing.
Virtual Public Meeting Notice Preparation and Distribution
Information regarding the details of the virtual public meeting(s) and how to participate via
computer and/or telephone is contained in the reader-friendly meeting notice(s) shown in
Appendix B. The notice has been prepared in English and will be translated into Spanish
by a certified translator. Through this notice, the public will be invited and encouraged to
attend the public virtual meeting scheduled on June 2, 2026 and July 7, 2026 at 7:00 p.m.
Once the PPP has been approved by NYSDEC the public meeting notice will be posted and
available in the online document repository described in Section VI of this document. At
least two weeks in advance of the public virtual meeting, the notice will be published in The
Journal News which is a daily newspaper printed, published, and circulated daily in
Westchester County. In addition, the public meeting notice will be emailed, mailed, and/or
hand delivered (door-to-door) to the stakeholders identified in the contact list in Appendix A
at least two weeks prior to the public virtual meeting.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Fact Sheet Preparation and Distribution
Factual information on the proposed project/action, including an overview, purpose
statement, and potential impacts, is outlined in the reader-friendly fact sheet shown in
Appendix C. In addition, the fact sheet outlines how interested stakeholders can: participate
in the permit application review process; access the online document repository to review
relevant application materials prior to the public meeting; and contact the project team to
obtain additional information. The fact sheet has been prepared in English and will be
translated into Spanish.
Once the PPP has been approved by NYSDEC the fact sheet will be posted and available
in the online document repository described in Section VI of this document. No later than 2
weeks prior to the public meeting, the applicant will distribute the fact sheet to provide
stakeholders with relevant background on the proposed project/action and facilitate
meaningful participation during the meeting. The fact sheet will be distributed together with
the public meeting notice via email, mail and/or hand delivery (door-to-door).
The fact sheet(s) will also be posted within the vicinity of the project site and visible to the
public. For example, they may be posted on some streetlight lampposts or bulletin boards
located in the lobby of residential complex buildings or public facilities such as libraries,
schools, or community centers within the project site.
Distribution of Notice of Complete Application
Once NYSDEC determines the application(s) for the proposed action/project is complete
and provides the Notice of Complete Application (NOCA) to the applicant, the applicant will
distribute the NOCA and draft permit, if applicable, to the meeting attendees and any
identified interested parties, to provide notification regarding the start of the NYSDEC public
comment period and to announce the deadline for submission of written comments to
NYSDEC. If the NOCA is available at the time of the meeting, the applicant will distribute
the NOCA at the public meeting. If the NOCA is not available at the time of the meeting, the
applicant will provide explicit instructions on how to access the online repository and inform
the attendees that, once available, the NOCA will be posted to the online document
repository and will be distributed to attendees via email or mail as soon as possible, but no
later than the date that the NOCA is published by the applicant in the print edition of a paid
local newspaper that is circulated at least weekly and available in the municipality in which
the project is located.
VI. DOCUMENT REPOSITORY
An online document repository has been established for the community and interested
stakeholders to access and review information about the project. The online repository
available at https://buchananny.gov/WWTP will provide information and documents relating
to the project and permit application.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
The repository will be updated throughout the application process with project-related
information and written materials (i.e., application forms and supporting materials, draft
permit, fact sheet, statement of basis (where applicable), the Notice of Complete Application
provided by the NYSDEC, etc.).
VII. SUBMISSIONS
Final Summary Report and Written Certification
Upon completion of the enhanced public participation plan, the applicant will submit written
certification to NYSDEC to certify that it has fully executed and complied with the approved
PPP. The certification shall be signed by the applicant, or the applicant's agent, and
submitted to NYSDEC prior to a final decision on the application.
As part of the certification, the applicant shall submit a final summary report documenting
the implementation of this PPP. The report will summarize the activities that occurred in
accordance with the PPP and will identify any substantive concerns raised by stakeholders
during the public meeting, or, at any time throughout the permitting process and detail the
applicant’s response(s) to any such concerns or questions. The applicant will include, or
append, any documentation that supports the final summary report, such as: the meeting
sign-in sheet(s), record of attendees/participants, meeting presentation, notes or minutes,
summary of questions and answers, and copy of newspaper notice or other proof of
publication. In addition, the report will identify any changes or modifications to the proposed
project that were made or considered by the applicant to address or reduce concerns
surrounding the permit application.
The final summary report and written certification will become part of the application record
and will be posted to the online document repository so that it is readily available to the
public.
P:\Village of Buchanan\Sewage Treatment Plant\Permits\NY-2A Form 2024\Support Items\NYSDEC PPP Revised 2026-05-27.docx
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
APPENDIX A
Contact List
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Stakeholders Contact List
Name
Address
Phone
Number
Email Address
Village of Buchanan
Board of Trustees
236 Tate Avenue
Buchanan, NY 10511
(914) 737-1033
villageboard@buchananny.gov
Village of Buchanan
Village Mayor
Theresa Knickerbocker
236 Tate Avenue
Buchanan, NY 10511
(914) 737-1033
theresak@buchananny.gov
Town of Cortlandt
Town Supervisor
1 Heady St
Cortlandt Manor, NY 10567
(914) 734-1002
supervisor@townofcortlandt.com
Town of Cortlandt
Town Clerk
1 Heady St
Cortlandt Manor, NY 10567
(914) 734-1020
townclerk@townofcortlandt.com
City of Peekskill
City Manager
840 Main Street
Peekskill, NY 10566
(914) 734-4246
malexander@cityofpeekskillny.gov
City of Peekskill
City Clerk
840 Main Street
Peekskill, NY 10566
(914) 737-3400
credd@cityofpeekskillny.gov
Village of Croton-on-
Hudson
Village Manager
1 Van Wyck Street
Croton-on-Hudson, NY
(914) 271-4848
managersoffice@crotononhudson-ny.gov
Village of Croton-on-
Hudson
Village Clerk
1 Van Wyck Street
Croton-on-Hudson, NY
(914) 271-4848
Pdisanto@crotononhudson-ny.gov
New York Senate
Senator Pete Harckham
1 Park Place
Suites 302 & 303
Peekskill , NY 10566
(914) 241-4600
harckhamz@nysenate.gov
New York State Assembly
Assemblymember Dana
Levenberg
8 Revolutionary Road
Ossining, NY 10562
(914) 941-1111
levenbergd@nyassembly.gov
Westchester County
Executive Ken Jenkins
Michaelian Office Building
148 Martine Ave
White Plains, NY 10601.
(914) 995-2000
jenkins-ce@westchestercountyny.gov
Sustainable Westchester
40 Green Street
Mount Kisco, NY 10549
(914) 242-4725
info@sustainablewestchester.org
communications@sustainablewestchester.org
Groundwork Hudson
Valley
22 Main St., 2nd Floor
|Yonkers NY 10701
(914) 375-2151
oded@groundworkhv.org
Federated
Conservationists of
Westchester County
(FCWC)
78 North Broadway
Gerber Glass Library,
Room 108
White Plains, NY 10603
(914) 422-4053
fcwc@fcwc.org
Sierra Club- Lower
Hudson Valley Group
(914) 772-3916
lowerhudson@gmail.com
Environmental Leaders
of Color
15 South 1st Ave. #2327,
Mount Vernon, NY 10550
(914) 901-3562
contactus@eloc.earth
Riverkeeper
20 Secor Rd
Ossining, NY 10562
(914) 478-4501
info@riverkeeper.org
Scenic Hudson
One Civic Center Plaza,
Suite 200, Poughkeepsie,
NY
(845) 473-4440
info@scenichudson.org
Westchester Land Trust
403 Harris Rd
Bedford Hills, NY 10507
(914) 234-6992
kim@westchesterlandtrust.org
Hudson Highlands
Land Trust
20 Nazareth Way
Garrison, NY 10524
(845) 424-3358
katrina.shindledecker@hhlt.org
Environmental Leaders
Learning Alliance
1600 Spring Valley Rd
Ossining, New York, 10562
(914) 762-2912
info@ellalhv.org
Hudson River
Environmental Society
hudsonriverenvironmental@gmail.com
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Stakeholders Contact List
Name
Address
Phone
Number
Email Address
Citizens Campaign for the
Environment
aesposito@citizenscampaign.org
We Act for Environmental
Justice
info@weact.org
NYC Environmental
Justice Alliance
info@nyc-eja.org
Westchester Alliance for
Sustainable Solutions
(WASS)
wasspeekskill@gmail.com
NAACP
Peekskillnaacp@gmail.com
Peekskill100
Communications@cure100.org
Ecological Citizens Project
jason.angell@ecologicalcitizens.org
Center for Economic and
Environmental Partnership
Connect@CEEPartnership.org
News 12
1 Media Crossways,
Woodbury, NY 11797
(718) 861-6800
news12bx@news12.com
Journal News
1133 Westchester Ave
White Plains, NY 10604
(914) 694-9300
thejournal-news@consolidated.net
Mid-Hudson News,
Peekskill Herald
206 Walnut St.
Peekskill, NY 10566
PO Box 548 Peekskill NY
(914) 382-6259
regina@peekskillherald.com
Westchester Examiner
Examiner Media
PO BOX 611
Mount Kisco, NY 10549
astone@theexaminernews.com
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
APPENDIX B
Virtual Public Meeting Notice
(English and Spanish)
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Virtual Public Meeting
June 2, 2026 and July 7, 2025 at 7:00 p.m.
VILLAGE OF BUCHANAN
WASTEWATER TREATMENT PLANT
DISCHARGE PERMIT INCREASE
The Village of Buchanan has submitted an application to the New York State Department
of Environmental Conservation (NYSDEC) for an increase in a SPDES Discharge Permit
for the increased treatment capacity at the Village’s wastewater treatment plant and
increased discharge of treated water into the Hudson River. A Public Participation Plan has
been developed in accordance with NYSDEC Commissioner Policy 29, Environmental
Justice and Permitting (CP-29). The purpose of this meeting is to inform the public about
the project and to involve the community during the SPDES Discharge Permit application
review process.
To Join Online
Click the link posted on the Village
website: https://buchananny.gov/meeting-
videos
To Call-in Using a Phone
Dial in using the following number:
TBD
When prompted, enter the Meeting ID:
TBD
Agenda:
Project Overview
Background
Scope of work
Project schedules
Community Impacts
Proposed Mitigation Measures
Questions and Answers
Your Attendance is Important!
Project personnel will be available to answer questions from the community. For additional
information on the proposed project:
Contact: Marcus Serrano, Village Administrator by phone at 914-737-1033 or by
email at mserrano@buchananny.gov
Visit the repository at: https://buchananny.gov/WWTP
Contact the project liaison to request reasonable accommodation for a disability or interpreter
services in a language other than English, so that you can participate in the call and/or to request a
translation of any of the event documents into a language other than English.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Reunión Pública Virtual
2 DE JUNIO DE 2026 Y 7 DE JULIO DE 2026 A LAS 7:00
p.m.
VILLAGE OF BUCHANAN
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
AUMENTO DEL PERMISO DE DESCARGA
El Village of Buchanan (Pueblo), ha enviado una aplicación al New York State Department
of Environmental Conservation (NYSDEC) para un aumento en el Permiso de Descarga
SPDES, para aumentar la capacidad de tratamiento en la Planta de Tratamiento de aguas
residuales del Pueblo, y aumentar la descarga de agua tratada en el río Hudson. Se ha
desarrollado un Plan de Participación Pública de conformidad con el NYSDEC
Commissioner Policy 29, Environmental Justice and Permitting (CP-29). El propósito de
esta reunión es para informar al público sobre el proyecto y involucrar a la comunidad
durante el proceso de revisión de la aplicación del Permiso de Descarga SPDES.
Para Participar en Línea
Haga clic en el enlace publicado en el
sitio web del Pueblo:
https://buchananny.gov/meeting-videos
Para Llamar por Teléfono
Marque usando el siguiente número:
TBD
Cuando se le solicite, ingrese el ID de la
reunión:
TBD
Agenda:
Descripción General del Proyecto
Información de fondo
Alcance del trabajo
Programa del Proyecto
Impactos Comunitarios
Medidas de Mitigación Propuestas
Preguntas y Respuestas
¡Su Asistencia es Importante!
Personal del proyecto estará disponible para responder a las preguntas de la comunidad.
Para más información sobre el proyecto propuesto:
Contacto: Marcus Serrano, Administrador del Pueblo al teléfono: 914-737-1033 o
por correo electrónico al: mserrano@buchananny.gov
Visite el repositorio en la página web: https://buchananny.gov/WWTP
Comuníquese con el enlace del proyecto para solicitar adaptaciones razonables para una
discapacidad o servicios de interpretación en un idioma distinto del inglés, para que pueda participar
en la reunión o para solicitar una traducción de cualquiera de los documentos del evento a un
idioma distinto del inglés.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
APPENDIX C
Fact Sheet
(English and Spanish)
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Village Of Buchanan
Wastewater Treatment Plant
Discharge Permit Increase Fact Sheet
Project: Wastewater Treatment Plant Discharge Permit Increase
Applicant: Village of Buchanan
Facility: Village of Buchanan Wastewater Treatment Plant (WWTP)
NYSDEC Application Number: 3-5522-00007/00002
A Public Participation Plan (PPP) has been developed in accordance with NYSDEC
Commissioner Policy 29, Environmental Justice and Permitting (CP-29)
What is the Proposed Project?
The Proposed Project will increase the treatment capacity of the WWTP and allowable discharge of
treated water into the Hudson River. To implement the proposed project, the Village of Buchanan has
submitted an application for an increase in a SPDES Discharge Permit to the New York State
Department of Environmental Conservation (NYSDEC) to increase the allowable discharge of treated
water into the Hudson River. The purpose of this fact sheet is to inform the public about this proposed
project and to involve the community during the NYSDEC permit application review process.
Why does the Village of Buchanan need to increase a SPDES Discharge Permit?
The Village of Buchanan is currently allowed to discharge up to 500,000 gallons per day of treated
water from the Village WWTP into the Hudson River. With the recent approval of major development
projects in the Village and the agreement to 100,000 gallons per day of treat wastewater from the Town
of Cortlandt, the Village needs an increase in capacity at the Village WWTP. The Village is requesting
to increase the allowable discharge of treated water into the Hudson River to 750,000 gallons per day.
As part of the increase in allowable discharge, two treatment tanks at the WWTP will be reconstructed.
The increase will allow for the approved projects and future development projects in the Village.
How might the project affect the surrounding community?
There are no significant direct adverse impacts to the residents of the Village from the project or
temporarily from construction. There may be indirect impacts as a result from the project.
How can I participate in the permit review process?
Attend the upcoming virtual public meeting scheduled for June 2, 2026 and July 7, 2026 at 7:00
p.m. to learn about the project, ask questions and/or express concerns about the project.
Ask questions, express concerns, provide input or submit by comments in writing, by phone or
email to the project contact person identified below.
Where can I get more information about the proposed project?
Visit the online document repository at: https://buchananny.gov/WWTP to obtain application
materials, relevant documents, and information about the project.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Contact Marcus Serrano, Village Administrator by phone at: 914-737-1033, by email at:
mserrano@buchananny.gov or in writing at: 236 Tate Avenue, Buchanan, NY 10511 for
information on the project, instructions on how to attend the upcoming virtual public meeting, or
to find out about the status of the permit application and public comment period.
Who is responsible for reviewing the Permit Application?
NYSDEC Region 2 Headquarters, 47-40 21st St., Long Island City, NY 11101, is responsible for
reviewing and issuing the required permits. Tel: (718) 482-4997; email: DEP.R2@dec.ny.gov
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
Village of Buchanan
Planta de Tratamiento de Aguas Residuales
Aumento del Permiso de Descarga
Hoja Informativa
El Proyecto: Wastewater Treatment Plant Discharge Permit Increase
El Solicitante: Village of Buchanan
El Instalación: Village of Buchanan Wastewater Treatment Plant (WWTP)
NYSDEC Numero de Aplicación: 3-5522-00007/00002
Se ha desarrollado un Plan de Participación Pública de conformidad con el NYSDEC
Commissioner Policy 29, Environmental Justice and Permitting (CP-29)
¿Qué es el Proyecto Propuesto?
El proyecto propuesto aumentará la capacidad de tratamiento de la Planta de Tratamiento de aguas
residuales, y la descarga permitida de agua tratada en el río Hudson. Para implementar el proyecto
propuesto, el Village of Buchanan (Pueblo) ha enviado una aplicación para un aumento del Permiso
de Descarga SPDES al New York State Department of Environmental Conservation (NYSDEC) para
aumentar la descarga de agua tratada en el río Hudson. El propósito de esta hoja informativa es
informar al público sobre este proyecto propuesto, y involucrar a la comunidad durante el proceso de
revisión de la aplicación con el NYSDEC.
¿Por qué necesita aumentar el Permiso de Descarga SPDES del Village of Buchanan?
Actualmente, el Pueblo está permitido descargar 500.000 galones por día de agua tratada de la Planta
de Tratamiento de aguas residuales al río Hudson. Con la reciente aprobación de proyectos
importantes de desarrollo en el Pueblo, y el acuerdo para tratar 100.000 galones por día de aguas
residuales del Town of Cortlandt, el Pueblo necesita un aumento en la capacidad de su Planta de
Tratamiento de aguas residuales. El Pueblo está solicitando una aumenta a la descarga permitida de
agua tratada en el río Hudson a 750.000 galones por día. Parte del aumento de la descarga permitida
incluye la reconstrucción de dos tanques de tratamiento en la Planta de Tratamiento. El aumento
permitirá los proyectos aprobados, y futuros proyectos de desarrollo en el Pueblo.
¿Cómo podría afectar el proyecto a la comunidad circundante?
No hay impactos adversos directos significativos para los residentes del Pueblo por el proyecto o
temporalmente por la construcción. Puede haber impactos indirectos como resultado del proyecto.
¿Cómo puedo participar en el proceso de revisión de permisos?
Asista a la próxima reunión pública virtual programada para el 2 de Junio de 2026 y 7 de Julio de
2026 a las 7:00 p.m. para conocer el proyecto, hacer preguntas y/o expresar inquietudes sobre el
proyecto.
Haga preguntas, exprese inquietudes, proporcione información o envíe comentarios por escrito,
por teléfono o correo electrónico a la persona de contacto del proyecto identificada a continuación.
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
¿Dónde puedo obtener más información sobre el proyecto propuesto?
Visite el repositorio en la página web: https://buchananny.gov/WWTP para obtener materiales de
solicitud, documentos relevantes y información sobre el proyecto.
Comuníquese con: Marcus Serrano, Administrador del Pueblo al teléfono: 914-737-1033, o por
correo electrónico al: mserrano@buchananny.gov o por escrito a la dirección: 236 Tate Avenue,
Buchanan, NY 10511 para obtener información sobre el proyecto, instrucciones sobre como
atender a la próxima reunión pública virtual, o para más información sobre el estado de la aplicación
de permiso y el periodo de comentarios públicos.
¿Quién es responsable de revisar la Aplicación de Permiso?
NYSDEC Region 2 Headquarters, 47-40 21st St., Long Island City, NY 11101, es responsable de
revisar
y
emitir
los
permisos
requeridos.
Tel:
(718) 482-4997;
correo electrónico:
DEP.R2@dec.ny.gov
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
APPENDIX D
Project Site Map
!
!
"#$%&"'($)'' %*+
,-./"#)
*)0'#)*
)0!/*+
1.
)234-15.6
789:;<=>?>?9@@@ABCDEFGDHIJGLM>?N9OP<>NQP?R>S9>TMQ>OSO>?UVWXYBZ@[ZCAC@C8\]8[^G_
3
1
E`abcd8eJEc`fdbLJEegFghi
Public Participation Plan
July 2025
Buchanan WWTP
Rev. May 2026
APPENDIX E
Existing Burden Report
May 22, 2026
Village of Buchanan Wastewater Treatment Plant
Village of Buchanan; Westchester County
DEC ID: 3-5522-00007/00002 (P2S)
The Village of Buchanan is located within Census Tract 36119014000 (population 2,140).
Existing Burden Report
NYS DEC is required to consider as part of the permitting process the existing burdens on a
Disadvantaged Community (DAC) and whether the proposed action will cause a significant
increase in the existing disproportionate pollution burden on a DAC.
This report is prepared as part of the Village of Buchanan’s application to NYS DEC to increase
the capacity of the Village’s wastewater treatment plant (WWTP). The Village has recently
committed to treating the wastewater from two large multi-family residential projects and
wastewater from the Town of Cortlandt. Additionally, the Indian Point Energy Center is currently
being decommissioned and that land will eventually become available for redevelopment. To
enable these new projects, the Village’s WWTP needs the necessary capacity and discharge
limits to process the additional wastewater.
As part of correspondence from NYS DEC as part of a Notice of Incomplete Application dated
4/16/26, DEC has determined that the location of the sewage treatment plant (STP) is within half
a mile of a DAC, and the project involves a modification to a facility with an applicable permit,
therefore the Village must prepare an existing burden report (EBR).
Based on the DEC’s Statewide Disadvantaged Communities (DAC) mapping, see below, the
Village of Buchanan is identified as having comparatively lower burdens and vulnerabilities.
Based on this designation having comparatively lower existing burdens or vulnerabilities there is
a decreased likelihood that a proposed action may have a moderate or large impact on the DAC.
An EBR must include an assessment of the following information:
1.
Relevant baseline data on existing burdens, including from relevant criteria used to
designate the particular disadvantaged communities pursuant to subdivision one of
section 75–0111 of the Environmental Conservation Law;
Response: The Village has an Environmental Burden, see below, is higher than 94 % of the
census tracts statewide. The Village maintains that this relates to two main factors: (1) inland
flooding risks associated with the areas along Dickey Brook and Lake Meahagh; and, (2) the
continued presence of the former Indian Point Energy Center which is being decommissioned
and remediated. In addition, based on the most recent census data, the vacancy rate for housing
units in the Village is only 3 percent compared to approximately 10 percent state-wide1. Further,
it is noted that the Village is the home to a gypsum manufacturing plant which has a 24/7 operation
that requires large trucks for delivery of product.
Figure 1 hƩps://climate.ny.gov/Resources/Disadvantaged-CommuniƟes-Criteria
1 hƩps://data.census.gov/proĮle/Buchanan_village,_New_York?g=160XX00US3610341#housing
2.
The environmental or public health stressors already borne by the disadvantaged
community as a result of existing conditions located in or affecting the disadvantaged
community;
Response: It is noted that given that the Village already has a WWTP, the Environmental Burden
for wastewater discharge is only 3 percent higher than all of the census tracts in the state. As
noted above, inland flooding as well as Village’s location adjacent to the Hudson River contribute
to the existing environmental burden. Further, remediation of the former Indian Point Energy
Center is a long term process, although it is noted that the Village is in the process of considering
a new zoning designation that would allow for mixed-use residential development.
3.
The potential or projected contribution of the proposed action to existing pollution
burdens in the disadvantaged community;
Response: The proposed action is for the increase in the allowable discharge from the Village of
Buchanan Wastewater Treatment Plant from 0.50 MGD to 0.75 MGD. The proposed increase in
allowable discharge would allow the WWTP to process more wastewater from the Village and
neighboring communities. The Village has recently committed to treating the wastewater from two
large multi-family residential projects and wastewater from the Town of Cortlandt. Additionally, as
the Indian Point Energy Center decommissions, land will become available for redevelopment.
To enable these new projects, the Village’s WWTP needs the necessary capacity and discharge
limits to process the additional wastewater.
4.
Existing and potential benefits of the project to the community, including increased
housing supply, or alleviation of existing pollution burdens that may be provided by the
project, including operational changes to the project that would reduce the pollution burden
on the disadvantaged community; and
Response: The proposed improvements to the Village’s WWTP relates to its commitment to
treating the wastewater from two large multi-family residential projects and wastewater from the
Town of Cortlandt. The Village is currently in the process of creating new zoning for the properties
located on the west side of Broadway. As currently proposed, that zoning amendment could yield
approximately 1,300 new multi-family residential units with associated retail uses. The closing of
the former Indian Point Energy Center has created a significant fiscal strain to not only the Village
of Buchanan but also the local school district as tax revenue from that site has all but disappeared.
Discharge is subject to NYS DEC mandated State Pollutant Discharge Elimination System.