resurfacing map 2022
map survey
1 page
Meeting: portal event 889 (no meeting page on file)
Agenda item: Correspondence — Memorandum from Village Manager Bryan Healy regarding the 2023 Street Resurfacing Program
Map / plans, 1 page. Attached to agenda item: “Correspondence — Memorandum from Village Manager Bryan Healy regarding the 2023 Street Resurfacing Program”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Memo on Street Resurfacing
Extracted text
US-9
GRAND ST
MAPLE ST
MT AIRY RD
ALBANY POST RD
CLEVELAND DR
ELLIOTT WAY
OLD POST RD S
TRUESDALE DR
OLD POST RD N
BATTEN RD
N RIVERSIDE AVE
PARK TRL
S RIVERSIDE AVE
NORDICA DR
LOUNSBURY RD
OLCOTT AVE
MORNINGSIDE DR
VETERANS PLAZA
HIGH ST
CROTON POINT AVE
YOUNG AVE
BROOK ST
HASTINGS AVE
RADNOR AVE
BRIGGS LN
ELMORE AVE
ARROWCREST DR
ONEIDA AVE
PENFIELD AVE
SENESQUA RD
LEXINGTON DR
VAN WYCK ST
PRICKLY PEAR HILL RD
WOLF RD
SUNSET TRL
FINNEY FARM RD
GEORGIA LN
IRVING AVE
BEEKMAN AVE
GLENGARY RD
UPPER N HIGHLAND PL
HUNTER PL
BALTIC PL
MOUNTAIN TRL
SCENIC DR WEST
ALEXANDER LN
SUNSET DR
FRANKLIN AVE
PROSPECT PL
LOWER N HIGHLAND PL
MELROSE AVE
HESSIAN HILLS RD
WARREN RD
THOMPSON AVE
WAYNE ST
BUNGALOW RD
RIDGE RD
EKLOF CT
GERSTEIN ST
COOK LN
QUAKER BRIDGE RD
HARRISON AVE
MUNICIPAL PL
KING ST
WOOD RD
MT GREEN RD
PARK AVE
WHELAN AVE
TERRACE PL
HALF MOON BAY DR
AMBER DR
FINNEY FARM LANE
PINEY POINT AVE
DEVON AVE
WELLS AVE
OBSERVATORY DR
GIGLIO CT
PALMER AVE
CEDAR LN
RIVERVIEW TRL
FOX RD
MEMORY LN
GLEN PL
ARLINGTON DR
DAILEY DR
MICHAELS LN
JACOBY ST
ACKERMAN CT
CHURCH ST
STEVENSON PL
ELM ST
NILES RD
KUNEY ST
LARKIN PL
PUMP HOUSE ROAD
HAMILTON AVE
CLINTON ST
JASPER RD
O'REILLY CT
BIRCH CT
PETER BEET LN
STEPHANIE LN
MT AIRY WOODS
CLEVELAND DR
HALF MOON BAY DR
US-9
OLD POST RD N
S RIVERSIDE AVE
S RIVERSIDE AVE
GRAND ST
WELLS AVE
VILLAGE OF CROTON-ON-HUDSON
RESURFACING MAP
Year of Resurfacing
PRVT
NYS
Machine-extracted for search and reference — the original PDF is the authoritative version.