memo to Village manager on Change order 2
resolution
5 pages
Meeting: portal event 702 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution- Paladino - Change Order Number 2
Resolution, 5 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution- Paladino - Change Order Number 2”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Duck Pond- Paladino Concrete
Prospect Place- Drainage- Paladino Concrete
backuppaladino
Extracted text
EN GIN EERS OFFICE
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street, 2nd floor
Croton-on-Hudson, NY 10520-2501
Mayor
Leo A.W. Wiegman
Trustees
Ann H. Gallelli
Ian W. Murtaugh
Gregory Schmidt
Casey Raskob
Village Manager
Abraham Zambrano
Assistant Village Manager
Janine King
Village Treasurer
Sandra Bullock
Village Engineer/Building Inspector
Daniel O’Connor, P.E.
Asst. Building Inspector/Assessor
Joseph Sperber
Fire Inspector
Peter Anfiteatro
MEMORANDUM
Date:
February 13, 2012
To:
Abe Zambrano
From:
Daniel O’Connor
Subject:
Sidewalk and Curb Improvement Program Contract
Change Order #2 (Duck Pond Park Drainage Work along new Sidewalk)
The Village entered into a contract with Paladino Concrete Creations Corp. on 6/7/10 for the
Sidewalk and Curb Improvement Program. This contract was extended by mutual agreement
until 6/7/12. At the request of the Village the contractor performed sidewalk and curb
installation work on Bungalow Road between the two parking lots in the Duck Pond Park.
While working on the sidewalk and curb on Bungalow Road the contractor was requested to
perform additional work not included in the base contract.
This additional work consisted of drainage improvements that were necessary to handle storm
water runoff from the Duck Pond Park. The drainage improvements collect the storm water
before it crosses the sidewalk, reducing impacts to the sidewalk and possible surface water
ponding conditions in the park. Yard drains and drainage pipes were installed and connected to
the existing storm water drainage system on Bungalow Road. This work was previously
contemplated in the 2008 Park Improvement Plan that was submitted with a grant application for
park improvements; the grant application however was not approved by the State.
In 2008 the Village had hired a landscape architect to prepare the grant application and bid
documents if the grant was approved. Purchase order #00900507-00 was issued in the amount of
$20,000; the balance of the PO was $16,456.90. The PO was recently closed and the balance of
$16,456.90 was returned to the Duck Pond capital account (#H7140-2103-09196) bringing the
balance to $23,658.49. Change order #2 for Paladino Concrete Creations will be charged to this
capital account leaving a balance of $6274.70. The balance is slated to be used for the following
at this time: removal of a few dangerous trees near the play ground, trash rack over drainage inlet
structure behind home plate to reduce flooding and erosion of the ball field, mechanical
skimming of the pond to remove aquatic plants, and storm water flyers and magnets for Phase 2
Education and Outreach program in the Duck Pond watershed, these are being designed by
CHHS AP Environment Studies students and other students.
Sidewalk and Curb Improvement Program Contract
Change Order #2 (Duck Pond Park Drainage Work along new Sidewalk)
Please place this on the next Village Board agenda if required for the Village Board to approve
the change order #2 in the amount of $17,383.79. This should be charged to capital account
H7140-2103-09196 (Capital Account for Duck Pond Park).
If any additional information is needed please let me know.
Enc. (Change Order)
cc:
Janine King, w/enc. (email only)
Paula DiSanto, w/enc. (email only)
Sandra Baker, w/enc. (email only)
Joseph Sperber, w/enc. (email only)
Ronnie Rose, w/enc. (email only)
File, w/enc.
$17,383.79
$143,314.74
PO #01200525-01, Including CO#1
1/30/2012
Sidewalk and Curbs Improvement Program
Village of Croton-on-Hudson
Paladino Concrete Creations, Corp
6/7/2010 (extended to 6/7/2012)
Sidewalk and Curbs Improvement Program
Paladino Concrete Creations, Corp
Installation of drainage improvements (yard drains and drainage pipes) for
new sidewalk and curb. The new sidewalk and curb was installed on
Bungalow Road to provide a pedestrian link between the two park parking
lots. Drainage improvements were needed to prevent drainage flow over the
new sidewalk and prevent ponding of water in the park.
Paladino Invoice #1749, dated 1/11/12
$125,930.95
Abe Zambrano, Village Manager
Daniel O'Connor, P.E.
2/13/2012