croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

PIN 8780 PR All

document 1 page
Meeting: portal event 705 (no meeting page on file)
Agenda item: Work Session — Croton-Harmon Parking Facility -Traffic Bicycle and Pedestrian Enhancements
Document, 1 page. Attached to agenda item: “Work Session — Croton-Harmon Parking Facility -Traffic Bicycle and Pedestrian Enhancements”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
PIN 8780.41 CROTON-ON-HUDSON PARKING FACILITY AND BICYCLE ENHANCEMENTS January 18, 2012 DESCRIPTION OF WORK COMPLETED TO DATE I. Survey / Mapping II. Traffic A. Conducted turning movement counts at the intersection of Croton Point Avenue and the US Route 9 northbound and the US Route 9 southbound ramps. B. Obtained accident data and performed accident analysis. C. Prepared a Traffic Signal Warrant Study for the Croton Point Avenue intersections with the US Route 9 northbound ramps, the US Route 9 southbound ramps, and Veteran’s Plaza. D. Performed capacity / level of service (LOS) analysis for Existing, ETC, and ETC+10 conditions. III. Environmental Studies A. Wetlands Investigation B. Asbestos Screening C. Hazardous Materials Screening D. State Historic Preservation Office (SHPO) – cultural and historic review IV. Bike Survey – Conducted September 2011 V. Conceptual Design Alternatives A. Prepared 4 conceptual design alternatives: 1. Option 1 - Bike Lane 2. Option 2 - Shared Use Path 3. Option 3 – Hybrid Alternative 4. Option 4 – 10 Ft. Combined Bike Path/Sidewalk with 5 ft. offset-on south side of Croton Point Avenue B. Preliminarily identify ROW acquisition needs. VI. Design Approval Document – Began preparation of Draft Design Report. VII. Submissions A. Preliminary Survey / Mapping files in Microstation and AutoCad to Village. B. Bike Survey and Summary of Results. C. Draft Design Criteria and Signal Warrant Analysis for concurrence - Village and NYSDOT. D. State Historic Preservation Office (SHPO) documentation for review and determination - Village and SHPO. E. Meeting minutes to attendees. VIII. Meetings / Conference Calls – CHA prepared for and attended: A. May 17, 2011 - Kickoff meeting with the Village and NYSDOT. B. October 28, 2011 - Conference call with the Village to review the status of the project. C. November 18, 2011 - meeting with the Village to review / discuss conceptual alternatives. D. December 1, 2011 - meeting with the Village and the Bicycle and Pedestrian Committee to review concept alternatives. E. December 27, 2011 - Conference call with the Village to discuss the January 4, 2012 meeting. F. January 4, 2011 – meeting with Village and NYSDOT for project review.

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.