croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

shorteaf-bondresolutions

resolution 2 pages
Meeting: portal event 706 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Environmental Compliance for Bonds
Resolution, 2 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Environmental Compliance for Bonds”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Enviro resolution
617.20 Appendix C State Environmental Quality Review SHORT ENVIRONMENTAL ASSESSMENT FORM For UNLISTED ACTIONS Only PART I - PROJECT INFORMATION (To be completed by Applicant or Project Sponsor) 1. APPLICANT/SPONSOR 2. PROJECT NAME 3. PROJECT LOCATION: County 4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map) 5. PROPOSED ACTION IS: New Expansion Modification/alteration 6. DESCRIBE PROJECT BRIEFLY: 7. AMOUNT OF LAND AFFECTED: Initially acres Ultimately acres 8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? Yes No If No, describe briefly 9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? Residential Industrial Commercial Agriculture Park/Forest/Open Space Other Describe: 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL, STATE OR LOCAL)? Yes No If Yes, list agency(s) name and permit/approvals: 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? Yes No If Yes, list agency(s) name and permit/approvals: 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? Yes No I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: Date: If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment OVER Village of Croton on Hudson Adoption of 4 Bond Resolutions totalling $1,686,060 Croton on Hudson Westchester County 1 Van Wyck Street, Croton on Hudson, NY 10520  The Village Board of Trustees will be adopting 4 bond resolutions totalling $1,686,060 for road improvements and drainage, the acquisition of machinery and apparatus, park improvements, improvements to sanitary sewer systems, and improvements to the Village’s water supply system N/A N/A   The projects are in various parts of the Village, within residential, commercial, office, light industrial, and parks zones.    Daniel F. O'Connor, P.E., Village Engineer 01-03-12 Reset PART II - IMPACT ASSESSMENT (To be completed by Lead Agency) A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.4? If yes, coordinate the review process and use the FULL EAF. Yes No B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.6? If No, a negative declaration may be superseded by another involved agency. Yes No C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten, if legible) C1. Existing air quality, surface or groundwater quality or quantity, noise levels, existing traffic pattern, solid waste production or disposal, potential for erosion, drainage or flooding problems? Explain briefly: C2. Aesthetic, agricultural, archaeological, historic, or other natural or cultural resources; or community or neighborhood character? Explain briefly: C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species? Explain briefly: C4. A community’s existing plans or goals as officially adopted, or a change in use or intensity of use of land or other natural resources? Explain briefly: C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain briefly: C6. Long term, short term, cumulative, or other effects not identified in C1-C5? Explain briefly: C7. Other impacts (including changes in use of either quantity or type of energy)? Explain briefly: D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL ENVIRONMENTAL AREA (CEA)? Yes No If Yes, explain briefly: E. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? Yes No If Yes, explain briefly: PART III - DETERMINATION OF SIGNIFICANCE (To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important or otherwise significant. Each effect should be assessed in connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d) irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part II was checked yes, the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA. Check this box if you have identified one or more potentially large or significant adverse impacts which MAY occur. Then proceed directly to the FULL EAF and/or prepare a positive declaration. Check this box if you have determined, based on the information and analysis above and any supporting documentation, that the proposed action WILL NOT result in any significant adverse environmental impacts AND provide, on attachments as necessary, the reasons supporting this determination. Date Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer (If different from responsible officer)   No No No No No No No    Village Board of Trustees 01-03-12 Abraham Zambrano Village Manager Reset

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.