Croton on Hudson PPU.V4.
resolution
5 pages
Meeting: portal event 708 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Bond-15 year
Resolution, 5 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Bond-15 year”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Bond Resolution-15yr
Extracted text
Comprehensive Infrastructure Maintenance
Total Cost with Fee
PPU
Years
2011-2012
Streets, Sidewalks and Parking Lots
1.)General Road Repairs
$112,200.00 20C
110,000
2.)Sidewalks and Curbs
$102,000.00 20C
100,000
3.)Bicycle Pedestrian Improvement Project-CPA & S. Riverside
$204,000.00 20C
200,000
4.)Half Moon Bay Drive stockade fence
$61,200.00 20C
60,000
Comprehensive Projects
1. Farrington Rd - Phase I - design - CDBG project
$102,000.00 20C
100,000
Comprehensive Infrastructure Maintenance
$581,400.00
$570,000
EQUIPMENT
2011-2012
4X4 Pickup
$34,680.00
34,000
Compact wheel loader with attachments
$58,140.00
57,000
Police 4X4 Expedition
$30,600.00
30,000
Refurbish equipment & cement mixer
$51,000.00
50,000
EQUIPMENT TOTAL
$174,420.00
$171,000
FIRE DEPARTMENT
2011-2012
Thermal Imaging Cameras (1)
$12,240.00
12,000
SCBA Bottle Replacement Plan
$12,240.00
12,000
Sprinkler System for Washington Engine Fire House
$26,520.00
26,000
FIRE DEPARTMENT TOTAL
$51,000.00
$50,000
EMERGENCY MEDICAL SERVICE
2011-2012
1 CPR Assists Units
$13,260.00
13,000
Pagers (20)
$9,792.00
9,600
Repairs and Graphics to 55 B2
$9,588.00
9,400
EMERGENCY MEDICAL SERVICE TOTAL
$32,640.00
$32,000
Police Department
2011-2012
Voice Recorder
$25,500.00
25,000
TOTAL MUNICIPAL BUILDING RENOVATIONS
$25,500.00
$25,000
RECREATION
2011-2012
Duck Pond park improvements
$0.00 19c
Security Camera - Croton Landing Park
$8,670.00
8,500
Dobbs Park Playground
$16,830.00 19c
16,500
RECREATION TOTALS
$25,500.00
$25,000
PROJECT:
PLANNING INITIATIVES
2011-2012
Planning Studies (Is this in connectino with anything here?)
$30,600.00 62a
30,000
PLANNING - TOTAL
$30,600.00
$30,000
2010-2011
TOTAL GENERAL CAPITAL COSTS
$903,000
WATER SYSTEM IMPROVEMENTS
2011-2012
Water Source and Well Field Improvements
$102,000.00
100,000
Water Distribution System Improvements
2.)Distribution Model
$102,000.00
100,000
3.) Wolf and Cook
$51,000.00
$50,000
TOTAL WATER SYSTEM IMPROVEMENTS
$255,000.00
$250,000
Sanitary Sewer System Improvements
2011-2012
1.)Nordica Sewer Pump Station Phase 2: Pumps and Forcemain
$408,000.00
400,000
2, Half Moon Bay Pump Station Generator Replacement
$102,000.00
100,000
TOTAL SEWER SYSTEM IMPROVEMENTS
$510,000.00
$500,000
FUNDING SOURCE RECAP FOR 2011-2012
$1,350,000
$303,000
$1,686,060.00
1,653,000
Comprehensive Infrastructure Maintenance
Total Cost with Fee
PPU
Years
2011-2012
4X4 Pickup
$34,680.00
34,000
Police 4X4 Expedition
$30,600.00
30,000
$65,280.00
Thermal Imaging Cameras (1)
$12,240.00
12,000
SCBA Bottle Replacement Plan
$12,240.00
12,000
1 CPR Assists Units
$13,260.00
13,000
Pagers (20)
$9,792.00
9,600
Repairs and Graphics to 55 B2
$9,588.00
9,400
Security Camera - Croton Landing Park
$8,670.00
8,500
$65,790.00
Planning Studies (Is this in connectino with anything here?)
$30,600.00 62a
30,000
5 year total $161,670.00
1.)Nordica Sewer Pump Station Phase 2: Pumps and Forcemain
$408,000.00
400,000
2, Half Moon Bay Pump Station Generator Replacement
$102,000.00
100,000
$510,000.00
Voice Recorder
$25,500.00
25,000
Sprinkler System for Washington Engine Fire House
$26,520.00
26,000
10 Year Total $562,020.00
Compact wheel loader with attachments
$58,140.00
57,000
Refurbish equipment & cement mixer
$51,000.00
50,000
$109,140.00
Duck Pond park improvements
$0.00 19c
Dobbs Park Playground
$16,830.00 19c
16,500
$16,830.00
1.)General Road Repairs
$112,200.00 20C
110,000
2.)Sidewalks and Curbs
$102,000.00 20C
100,000
3.)Bicycle Pedestrian Improvement Project-CPA & S. Riverside
$204,000.00 20C
200,000
4.)Half Moon Bay Drive stockade fence
$61,200.00 20C
60,000
1. Farrington Rd - Phase I - design - CDBG project
$102,000.00 20C
100,000
$581,400.00
15 year total
$707,370.00
Water Source and Well Field Improvements
$102,000.00
100,000
2.)Distribution Model
$102,000.00
100,000
3.) Wolf and Cook
$51,000.00
$50,000
Streets, Sidewalks and Parking Lots
$255,000.00
12/30/2011
$1,686,060.00
$1,686,060.00
12/30/2011
Machine-extracted for search and reference — the original PDF is the authoritative version.