20111013 Joint Application Package
resolution
79 pages
Meeting: portal event 708 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Yacht Club-adopts Neg. Dec and Referral to WAC
Resolution, 79 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Yacht Club-adopts Neg. Dec and Referral to WAC”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
20110927 DesignProtocolReportV4
Croton Yacht Club - permit application - SEQRA
Croton Yacht Club - resolution
Croton Yacht Club prelim consist 12 21 11 signed
Extracted text
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
JOIN T APPLICATION FOR PERMIT
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
Prepared For:
Prepared By:
Ocean and Coastal Consultants Engineering, P.C.
35 Corporate Drive
Trumbull, CT 06611
October 2011
OCC Project #210082
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
TABLE OF CON TEN TS
Description
Section
Transmittal Letters
Joint Application Form
Attachment 1
Location Map
Attachment 2
Application Drawings
Attachment 3
Site Photographs
Attachment 4
Short Environmental Assessment Form
Attachment 5
Permission to Inspect Property Supplement
Attachment 6
ACOE Environmental Questionnaire
Attachment 7
Federal Consistency Assessment Form
Attachment 8
Analysis of Potentially Affected Coastal Policies
Attachment 9
Village of Croton-on-Hudson Coastal Assessment Form
Attachment 10
Adjacent Property Owners
Attachment 11
Ocean and Coastal
Consultants Engineering, P.C.
35 Corporate Drive
Ste 1200
Trumbull, CT 06611
Tel 203 268 5007
Fax 203 268 8821
www.ocean-coastal.com
VIA FEDEX 2-DAY
(845)256-3054
New York State
Department of Environmental Conservation
Region 3
21 South Putt Corners Road
New Paltz, NY 12561-1696
Attention:
Regional Permit Administrator
Reference:
Croton Yacht Club - Bulkhead Replacement
Croton-on-Hudson, New York
Joint Application for Permit
To Whom It May Concern:
Date
October 3, 2011
Your ref.
Joint Application for Permit
Our ref.
Project No. 210082
Ocean and Coastal Consultants Engineering P.C. (OCCE), on behalf of the Vil-
lage of Croton-on-Hudson, is pleased to submit the enclosed Joint Application
for Permit to oversheet the existing steel sheet pile bulkhead at the Croton Yacht
Club, located along the east bank of the Hudson River, in the Village of Croton-
on-Hudson, Westchester County, New York.
Enclosed please find three (3) copies of the Application Package which includes
the following:
• Joint Application for Permit
• Location Map
• Application Drawings
• Site Photographs
• SEQR- Short Environmental Assessment Form
• Permission to Inspect Property Supplement
• ACOE Environmental Questionnaire
• Federal Consistency Assessment Form with Coastal Policy Assessment
• Village of Croton-on-Hudson Coastal Assessment From
• List of Adjacent Property Owners
One copy of the Application Package has been forwarded to each of the follow-
ing: the New York District Corps of Engineers; the New York State Department
of State, Consistency Review Unit; and the Village of Croton-on-Hudson Engi-
neering Department, to help expedite your review.
Please feel free to contact the undersigned if you have any questions regarding
this submittal.
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 DEC Transmittal.docx
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 DEC Transmittal.docx
2 / 2
.
OCEAN AN D COASTAL CON SULTAN TS, IN C.
Azure Dee Sleicher, P.E.
Project Manager
Encl:
As Stated
Copy:
Marco J. Gennarelli, Village of Croton-on-Hudson
New York District Corps of Engineers, Western Permits Section
New York State Department of State – Division of Coastal Resources
Village of Croton-on-Hudson, Engineering Department
Ocean and Coastal
Consultants Engineering, P.C.
35 Corporate Drive
Ste 1200
Trumbull, CT 06611
Tel 203 268 5007
Fax 203 268 8821
www.ocean-coastal.com
VIA FEDEX 2-DAY
(518) 474-6000
New York State Department of State
Division of Coastal Resources
99 Washington Ave, Suite 1010
Albany, NY 12231-00001
Attention:
Consistency Review Unit
Reference:
Croton Yacht Club - Bulkhead Replacement
Croton-on-Hudson, New York
Joint Application for Permit
To Whom It May Concern:
Date
October 3, 2011
Your ref.
Joint Application for Permit
Our ref.
Project No. 210082
Ocean and Coastal Consultants Engineering P.C. (OCCE), on behalf of the Vil-
lage of Croton-on-Hudson, is pleased to submit the enclosed Joint Application
for Permit to oversheet the existing steel sheet pile bulkhead at the Croton Yacht
Club, located along the east bank of the Hudson River, in the Village of Croton-
on-Hudson, Westchester County, New York.
Enclosed please one (1) copy of the Application Package which includes the fol-
lowing:
• Joint Application for Permit
• Location Map
• Application Drawings
• Site Photographs
• SEQR- Short Environmental Assessment Form
• Permission to Inspect Property Supplement
• ACOE Environmental Questionnaire
• Federal Consistency Assessment Form with Coastal Policy Assessment
• Village of Croton-on-Hudson Coastal Assessment From
• List of Adjacent Property Owners
Concurrent with this submittal, applications have been submitted to the NYS De-
partment of Environmental Conservation and the United States Army Corps of
Engineers New York District. A copy of this application has also been sent to the
Village-of-Croton on Hudson, Engineering Department, in order to facilitate the
review of the Village's Coastal Assessment Form.
Please feel free to contact the undersigned if you have any questions regarding
this submittal.
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 DOS Transmittal.docx
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 DOS Transmittal.docx
2 / 2
.
OCEAN AN D COASTAL CON SULTAN TS, IN C.
Azure Dee Sleicher, P.E.
Project Manager
Encl:
As Stated
Copy:
Marco J. Gennarelli, Village of Croton-on-Hudson
New York District Corps of Engineers, Western Permits Section
New York State Department of Environmental Conservation - Region 3
Village of Croton-on-Hudson, Engineering Department
Ocean and Coastal
Consultants Engineering, P.C.
35 Corporate Drive
Ste 1200
Trumbull, CT 06611
Tel 203 268 5007
Fax 203 268 8821
www.ocean-coastal.com
VIA FEDEX 2-DAY
(917) 790-8411
Department of the Army – Regulatory Branch
New York District, Corps of Engineers
Jacob Javits Federal Building
26 Federal Plaza – Room 1937
New York, New York 10278-0090
Attention:
Regulatory Branch - Western Permits
Reference:
Croton Yacht Club - Bulkhead Replacement
Croton-on-Hudson, New York
Joint Application for Permit
To Whom It May Concern:
Date
October 3, 2011
Your ref.
Joint Application for Permit
Our ref.
Project No. 210082
Ocean and Coastal Consultants Engineering P.C. (OCCE), on behalf of the Vil-
lage of Croton-on-Hudson, is pleased to submit the enclosed Joint Application
for Permit to oversheet the existing steel sheet pile bulkhead at the Croton Yacht
Club, located along the east bank of the Hudson River, in the Village of Croton-
on-Hudson, Westchester County, New York.
Enclosed please one (1) copy of the Application Package which includes the fol-
lowing:
• Joint Application for Permit
• Location Map
• Application Drawings
• Site Photographs
• SEQR- Short Environmental Assessment Form
• Permission to Inspect Property Supplement
• ACOE Environmental Questionnaire
• Federal Consistency Assessment Form with Coastal Policy Assessment
• Village of Croton-on-Hudson Coastal Assessment From
• List of Adjacent Property Owners
Concurrent with this submittal, applications have been submitted to the NYS De-
partment of Environmental Conservation and the NYS Department of State, Con-
sistency Review Unit. A copy of this application has also been sent to the Vil-
lage-of-Croton on Hudson, Engineering Department, in order to facilitate the re-
view of the Village's Coastal Assessment Form.
Please feel free to contact the undersigned if you have any questions regarding
this submittal.
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 USACE Transmittal.docx
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 USACE Transmittal.docx
2 / 2
.
OCEAN AN D COASTAL CON SULTAN TS, IN C.
Azure Dee Sleicher, P.E.
Project Manager
Encl:
As Stated
Copy:
Marco J. Gennarelli, Village of Croton-on-Hudson
New York District Corps of Engineers, Western Permits Section
New York State Department of Environmental Conservation - Region 3
Village of Croton-on-Hudson, Engineering Department
Ocean and Coastal
Consultants Engineering, P.C.
35 Corporate Drive
Ste 1200
Trumbull, CT 06611
Tel 203 268 5007
Fax 203 268 8821
www.ocean-coastal.com
VIA FEDEX 2-DAY
Village of Croton-on-Hudson
Engineering Department
Stanley H. Kellerhouse Municipal Building
1 Van Wyck Street
Croton-on-Hudson, New York 10520
Attention:
Ronnie Rose
Reference:
Croton Yacht Club - Bulkhead Replacement
Croton-on-Hudson, New York
Joint Application for Permit
Local Waterfront Revitalization Program
Dear Ms Rose:
Date
October 3, 2011
Your ref.
Joint Application for Permit
LWRP
Our ref.
Project No. 210082
Ocean and Coastal Consultants Engineering P.C. (OCCE), on behalf of the Vil-
lage of Croton-on-Hudson, has submited the enclosed Joint Application for Per-
mit to oversheet the existing steel sheet pile bulkhead at the Croton Yacht Club,
located along the east bank of the Hudson River, in the Village of Croton-on-
Hudson, Westchester County, New York.
As required by the New York State Department of State, we are providing you
with a copy of the Application Package which includes a consistency assessment
for compliance with the Village of Croton-on-Hudson Local Waterfront Revitali-
zation Program.
Enclosed please one (1) copy of the Application Package which includes the fol-
lowing:
• Joint Application for Permit
• Location Map
• Application Drawings
• Site Photographs
• SEQR- Short Environmental Assessment Form
• Permission to Inspect Property Supplement
• ACOE Environmental Questionnaire
• Federal Consistency Assessment Form with Coastal Policy Assessment
• Village of Croton-on-Hudson Coastal Assessment From
• List of Adjacent Property Owners
Concurrent with this submittal, applications have been submitted to the NYS De-
partment of Environmental Conservation and the NYS Department of State, Con-
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 Village Engineer - Transmittal.docx
P:\2010\OCC_210082.0\3_Project_Files\Permits\Joint Application - DEC & Army\20111003 Village Engineer - Transmittal.docx
2 / 2
.
sistency Review Unit, and the United States Army Corps of Engineers, New York
District.
Please feel free to contact the undersigned if you have any questions regarding
this submittal.
OCEAN AN D COASTAL CON SULTAN TS, IN C.
Azure Dee Sleicher, P.E.
Project Manager
Encl:
As Stated
Copy:
Marco J. Gennarelli, Village of Croton-on-Hudson
New York District Corps of Engineers, Western Permits Section
New York State Department of Environmental Conservation - Region 3
New York District Corps of Engineers, Western Permits Section
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 1
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
JOIN T APPLICATION FORM
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
New York
State
JOINT APPLICATION FORM
For Permits/Determinations to undertake activities affecting streams, waterways,
waterbodies, wetlands, coastal areas and sources of water supply.
You must separately apply for and obtain separate Permits/Determinations from
each involved agency prior to proceeding with work. Please read all instructions.
US Army Corps of
Engineers (USACE)
APPLICATIONS TO
1. NYS Department of Environmental Conservation
Check all permits that apply:
2. US Army Corps of Engineers
Check all permits that apply:
3. NYS Office of
General Services
4. NYS Depart-
ment of State
Stream Disturbance
Excavation and Fill in
Navigable Waters
Docks, Moorings or
Platforms
Dams and Impoundment
Structures
401 Water Quality
Certification
Freshwater Wetlands
Tidal Wetlands
Coastal Erosion
Management
Wild, Scenic and
Recreational Rivers
Water Supply
Long Island Well
Aquatic Vegetation Control
Aquatic Insect Control
Fish Control
Incidental Take of Endan-
gered/Threatened Species
Section 404 Clean Water Act
Section 10 Rivers and Harbors
Act
Nationwide Permit(s) - Identify
Number(s):
Preconstruction Notification -
Y / N
Check all permits that
apply:
State Owned Lands
Under Water
Utility
Easement
(pipelines,
conduits,
cables, etc.)
Docks,
Moorings or
Platforms
Check if this
applies:
Coastal
Consistency
Concurrence
I am sending this application to this agency.
I am sending this application
to this agency.
I am sending this
application to this
agency.
I am sending
this application
to this agency.
5. Name of Applicant (use full name)
Applicant must be:
Owner
Operator
Lessee
(check all that apply)
6. Name of Facility or Property Owner (if different than
Applicant)
Mailing Address
Mailing Address
Post Office City
Taxpayer ID (If applicant
is NOT an individual):
Post Office City
State
Zip Code
State
Zip Code
Telephone (daytime)
Email
Telephone (daytime)
Email
7. Contact/Agent Name
8. Project / Facility Name
Property Tax Map Section / Block / Lot Number
Company Name
Project Location - Provide directions and distances to roads, bridges and bodies of waters:
Mailing Address
Street Address, if applicable
Post Office City
State
Zip Code
NY
Post Office City
Town / Village / City
County
State
Zip Code
Name of USGS Quadrangle Map
Stream/Water Body Name
Telephone (daytime)
Location Coordinates: Enter NYTMs in kilometers, OR Latitude/Longitude
Email
NYTM-E
NYTM-N
Latitude
Longitude
For Agency Use Only
DEC Application Number:
USACE Number:
JOINT APPLICATION FORM 09/10
This is a 2 Page Application
Application Form Page 1 of 2
Both Pages Must be Completed
azambrano@crotononhudson-ny.gov
Taxpayer ID (If applicant
is NOT an individual):
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
Village of Croton-on-Hudson
Attn: Abraham Zambrano, Village Manager
NWP # 3
1 Van Wyck Street
Croton-on-Hudson
NY
914-271-4848
same as applicant
Azure Dee Sleicher, P.E.
Ocean and Coastal Consultants Engineering, P.C.
35 Corporate Drive
Trumbull
CT
203-268-5007
azsl@ocean-coastal.com
Croton Yacht Club
78.01-1-3
The Croton Yacht Club is located directly adjacent to the Hudson River, on Eliott Way, directly north
of Senasqua Park.
Haverstraw
Hudson River
41 12 18.5 N
73 53 37.26 W
JOINT APPLICATION FORM - PAGE 2 OF 2
Submit this completed page as part of your Application.
9. Project Description and Purpose: Provide a complete narrative description of the proposed work and its purpose. Attach additional page(s) if
necessary. Include: description of current site conditions and how the site will be modified by the proposed project; structures and fill materials to
be installed; type and quantity of materials to be used (i.e., square ft of coverage and cubic yds of fill material and/or structures below
ordinary/mean high water) area of excavation or dredging, volumes of material to be removed and location of dredged material disposal or use;
work methods and type of equipment to be used; pollution control methods and mitigation activities proposed to compensate for resource
impacts; and where applicable, the phasing of activities. ATTACH PLANS ON SEPARATE PAGES.
Proposed Use:
Private Public Commercial
Proposed
Start Date:
Estimated
Completion Date:
Has Work Begun on Project? Yes
No
If Yes, explain.
Will Project Occupy Federal, State or Municipal Land? Yes
No
If Yes, please specify.
10. List Previous Permit / Application Numbers (if any) and Dates:
11. Will this project require additional Federal, State, or Local Permits including zoning changes? Yes
No
If yes, please list:
12. Signatures. If applicant is not the owner, both must sign the application.
I hereby affirm that information provided on this form and all attachments submitted herewith is true to the best of my knowledge
and belief. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.
Further, the applicant accepts full responsibility for all damage, direct or indirect, of whatever nature, and by whomever suffered,
arising out of the project described herein and agrees to indemnify and save harmless the State from suits, actions, damages and
costs of every name and description resulting from said project. In addition, Federal Law, 18 U.S.C., Section 1001 provides for a fine
of not more than $10,000 or imprisonment for not more than 5 years, or both where an applicant knowingly and willingly falsifies,
conceals, or covers up a material fact; or knowingly makes or uses a false, fictitious or fraudulent statement.
Signature of Applicant
Printed Name
Title
Date
Signature of Owner
Printed Name
Title
Date
Signature of Agent
Printed Name
Title
Date
For Agency Use Only
DETERMINATION OF NO PERMIT REQUIRED
Agency Project Number ______________________________________________
_____________________________________________ has determined that No Permit is required from this Agency for the project described in
(Agency Name)
this application.
Agency Representative:
Name (printed) _____________________________________________ Title __________________________________
Signature _________________________________________________ Date _________________________________
JOINT APPLICATION FORM 09/10
Application Form Page 2 of 2
Proposed
Start Date:
Estimated
Completion Date:
✔
✔
✔
✔
✔
TBD
TBD,
Property is leased by Croton Yacht Club but is owned by Village of Croton-on-Hudson
N/A
Federal: USACE NWP #3; State: NY State Consistency Certification; Local: LWRP Consistency, Building Permit
Abraham Zambrano
Village Manager
Azure Dee Sleicher, P.E.
Project Manager
See attached project description
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 2
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
LOCATION MAP
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 3
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
APPLICATION DRAWIN GS
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 4
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
SITE PHOTOGRAPHS
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
SITE PHOTOGRAPHS
N ORTH
Yacht Club
Marina
LEGEN D
Bulkhead
Proposed to be Replaced
Boat Ramp
Boat Storage
Wave Attenuation
Structure
Boat Ramp
Photograph 1: Aerial photograph of project site.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
D
C
B
A
Photograph 2: Aerial photograph identifying shoreline segments. Refer to Table 1 below.
Shoreline Segment
Linear Feet
(FT)
Adjacent Upland Description
Segment A - North Building Area
Removable Dock, Gabion Baskets,
Building
Segment B - Southwest Building Area
Gabion Baskets, Building
Segment C - Southwest Non-Building
Area
Gabion Baskets, Gravel; Boat Storage
Segment D - South Non-Building Area
Gravel; Boat Storage
Total
Table 1: Shoreline segment types.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
Photograph 3: Shoreline Segment A - N orth Building Area. View looking south. March 8, 2011.
Photograph 4: Shoreline Segment B - Southwest Building Area. View looking west. March 8, 2011.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
Photograph 5: Shoreline Segment C - Southwest N on-Building Area. View looking east. N ote timber
wave screen and marina docks in background. March 8, 2011.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
Photograph 6: Shoreline Segment D - South N on-Building Area. View looking northeast. March 8, 2011.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
Photograph 7: Typical deteriorated condition of bulkhead. March 8, 2011.
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 5
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
SHORT EN VIRON MEN TAL ASSESSMEN T FORM
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
617.20
Appendix C
State Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART I - PROJECT INFORMATION (To be completed by Applicant or Project Sponsor)
1. APPLICANT/SPONSOR
2. PROJECT NAME
3. PROJECT LOCATION:
County
4. PRECISE LOCATION (Street address and road intersections, prominent landmarks, etc., or provide map)
5. PROPOSED ACTION IS:
New
Expansion
Modification/alteration
6. DESCRIBE PROJECT BRIEFLY:
7. AMOUNT OF LAND AFFECTED:
Initially
acres
Ultimately
acres
8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
Yes
No
If No, describe briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
Residential
Industrial
Commercial
Agriculture
Park/Forest/Open Space
Other
Describe:
10.
DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY
(FEDERAL, STATE OR LOCAL)?
Yes
No
If Yes, list agency(s) name and permit/approvals:
11.
DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
Yes
No
If Yes, list agency(s) name and permit/approvals:
12.
AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
Yes
No
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
Applicant/sponsor name:
Date:
If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
Village of Croton-on-Hudson, Attn: Abraham Zambrano
Croton Yacht Club - Bulkhead Replacement
Village of Croton-on-Hudson
Westchester
Croton Yacht Club, located on Eliott Way, directly north of Senasqua Park
✔
Oversheeting of approximately 433 linear feet of existing steel sheet pile bulkhead with new steel sheet pile bulkhead with ground
anchors. The new bulkhead will be installed within 18 inches of the existing bulkhead, to the extent possible (due to driving
tolerances and existing conditions in which the existing bulkhead is not straight or plumb).
1.1
1.1
✔
✔
Yacht club/marina. Land is in WC (Waterfront Commercial) district, leased by Croton Yacht Club, owned by Village of
Croton-on-Hudson.
✔
USACE NWP#3; NYSDEC Permit; NYSDOS Consistency Cert.; Local Coastal Consistency &
Building Permit
✔
✔
Abraham Zambrano, Village Manager
Reset
PART II - IMPACT ASSESSMENT (To be completed by Lead Agency)
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.4?
If yes, coordinate the review process and use the FULL EAF.
Yes
No
B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.6? If No, a negative
declaration may be superseded by another involved agency.
Yes
No
C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten, if legible)
C1. Existing air quality, surface or groundwater quality or quantity, noise levels, existing traffic pattern, solid waste production or disposal,
potential for erosion, drainage or flooding problems? Explain briefly:
C2. Aesthetic, agricultural, archaeological, historic, or other natural or cultural resources; or community or neighborhood character? Explain briefly:
C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species? Explain briefly:
C4. A community’s existing plans or goals as officially adopted, or a change in use or intensity of use of land or other natural resources? Explain briefly:
C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain briefly:
C6. Long term, short term, cumulative, or other effects not identified in C1-C5? Explain briefly:
C7. Other impacts (including changes in use of either quantity or type of energy)? Explain briefly:
D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL
ENVIRONMENTAL AREA (CEA)?
Yes
No
If Yes, explain briefly:
E. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
Yes
No
If Yes, explain briefly:
PART III - DETERMINATION OF SIGNIFICANCE (To be completed by Agency)
INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important or otherwise significant. Each
effect should be assessed in connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d) irreversibility; (e)
geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that explanations contain
sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question D of Part II was checked
yes, the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA.
Check this box if you have identified one or more potentially large or significant adverse impacts which MAY occur. Then proceed directly to the FULL
EAF and/or prepare a positive declaration.
Check this box if you have determined, based on the information and analysis above and any supporting documentation, that the proposed action WILL
NOT result in any significant adverse environmental impacts AND provide, on attachments as necessary, the reasons supporting this determination.
Date
Print or Type Name of Responsible Officer in Lead Agency
Title of Responsible Officer
Signature of Responsible Officer in Lead Agency
Signature of Preparer (If different from responsible officer)
Reset
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 6
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
PERMISSION TO IN SPECT PROPERTY SUPPLEMEN T
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
N ew York State
Department of Environmental Conservation
PERMISSION TO IN SPECT PROPERTY
By signing this permission form for submission with an application for a permit(s) to the
Department of Environmental Conservation ("DEC"), the signer consents to inspection by DEC
staff of the project site or facility for which a permit is sought and, to the extent necessary, areas
adjacent to the project site or facility. This consent allows DEC staff to enter upon and pass
through such property in order to inspect the project site or facility, without prior notice, between
the hours of 7:00 a.m. and 7:00 p.m., Monday through Friday. If DEC staff should wish to conduct
an inspection at any other times, DEC staff will so notify the applicant and will obtain a separate
consent for such an inspection.
Inspections may take place as part of the application review prior to a decision to grant or
deny the permit(s) sought. By signing this consent form, the signer agrees that this consent
remains in effect as long as the application is pending, and is effective regardless of whether the
signer, applicant or an agent is present at the time of the inspection. In the event that the project site
or facility is posted with any form of "posted" or "keep out" notices, or fenced in with an unlocked
gate, this permission authorizes DEC staff to disregard such notices or unlocked gates at the time
of inspection.
The signer further agrees that during an inspection, DEC staff may, among other things,
take measurements, may analyze physical characteristics of the site including, but not limited to,
soils and vegetation (taking samples for analysis), and may make drawings and take photographs.
Failure to grant consent for an inspection is grounds for, and may result in, denial of the
permit(s) sought by the application.
Permission is granted for inspection of property located at the following address(es):
By signing this form, I affirm under penalty of perjury that I am authorized to give consent
to entry by DEC staff as described above. I understand that false statements made herein are
punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law.*
Print Name and Title
Signature
Date
*The signer of this form must be an individual or authorized representative of a legal entity that:
•
owns fee title and is in possession of the property identified above;
•
maintains possessory interest in the property through a lease, rental agreement or other legally binding agreement; or
•
is provided permission to act on behalf of an individual or legal entity possessing fee title or other possessory interest in
the property for the purpose of consenting to inspection of such property.
Permission to Inspect Property Application Supplement 12/08
Croton Yacht Club, Eliott Way, Croton-on-Hudson, NY 10520
Abraham Zambrano,
Village Manager
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 7
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
ACOE EN VIRON MEN TAL QUESTION N AIRE
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
EN VIRON MEN TAL QUESTION N AIRE
This is intended to supplement EN G Form 4345, Application for Department of the Army
Permit, or the Joint Application for Permit used in the State of N ew York. Please provide
complete answers to all questions below which are relevant to your project. Any answers may
be continued on separate sheet(s) of paper to be attached to this form.
PRIVACY ACT STATEMEN T
The purpose of this form is to provide the Corps of Engineers with basic information regarding
your project. This information will be used to facilitate evaluation of your permit application
and for public dissemination as required by regulation. Failure to provide complete
information may result in your application being declared incomplete for processing, thereby
delaying processing of your application.
GEN ERAL- APPLICABLE TO ALL PROJECTS
1. Explain the need for, and purpose of, the proposed work.
This application proposes the bulkhead oversheeting of a deteriorated steel sheet pile bulkhead
located at the Croton Yacht Club, on the property of the Village of Croton-on-Hudson. The
structures provide erosion protection to the site and facilitate water dependant activities.
2. Provide the names and addresses of property owners adjacent to your work site (if not
shown on the application form or project drawings).
See Attachment 11.
(Please note that depending upon the nature and extent of your project, you may be requested
to provide the names and addresses of additional property owners proximate to your project
site to ensure proper coordination.)
3. Photographs of the project site should be submitted. For projects in tidal areas, photographs
of the waterway vicinity should be taken at low tide. Using a separate copy of your plan view,
indicate the location and direction of each photograph as well as the date and time at which the
photograph was taken. Provide a sufficient number of photographs so as to provide a clear
understanding of conditions on and proximate to your project site.
See attached Site Photographs (Attachment 4) and Application Drawings (Attachment 3).
4. Provide a copy of any environmental impact statement, or any other environmental report
which was prepared for your project.
A copy of the SEQR short environmental assessment form is attached to this permit application
(Attachment 5).
5. Provide a thorough discussion of alternatives to your proposal. This discussion should
include, but not necessarily be limited to, the "no action" alternative and alternative(s)
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
resulting in less disturbance to waters of the United States. For filling projects in waters of the
United States, including wetlands, your alternatives discussion should demonstrate that there
are no practicable alternatives to your proposed filling and that your project meets with
current mitigation policy (i.e. avoidance, minimization and compensation).
Alternatives that were considered are as follows:
Do-nothing
This approach is not recommended due to the deteriorated state of the existing bulkhead. Continued
corrosion and loss of fill may compromise the yacht club building and cause loss of property in
addition to environmental harm that would occur as a result of structure collapse and deposition of
upland fill into the Hudson River.
Temporary repairs
Repairs to the existing structure are not appropriate since the structure is so badly deteriorated.
In-kind, in-place replacement
In-kind, in-place replacement of the bulkhead is also not practicable. The existing sheet piles are in a
critical deteriorated state. The force required to remove the deeply driven sheets would cause them to
break, leaving obstructions that would not allow the driving of new piles in the same location. Also,
the temporary removal of the existing bulkhead would leave the upland soil unsupported and would
cause it to be subject to erosion, potentially causing loss of land.
Installing a new bulkhead landward of the existing bulkhead
The proximity of the yacht club building, as well as the presence of the existing tie-back system
behind the existing bulkhead would not allow sheets to be driven landward of the existing bulkhead.
Stone Revetment
A stone revetment was ruled out as a possibility due to the usage of the upland area adjacent to the
shoreline, regulatory concerns, and navigational limitations. Permitting such a structure would
require limiting encroachment into the water area past the existing bulkhead. In order to maintain the
proper slope and the encroachment limitations, the bottom of the revetment would have to be in line
with the current bulkhead and the top of the revetment would fall very close to the yacht club
building. This would decrease the usable land area for yacht storage, reduce or eliminate the
proposed public access area, and would limit the ability to launch boats.
Bulkhead oversheeting was determined to be the most practicable repair solution due to the site
constraints.
DREDGIN G PROJECTS
Answer the following if your project involves dredging.
1. Indicate the estimated volume of material to be dredged and the depth (below mean low
water) to which dredging would occur. Would there be overdepth dredging?
Not Applicable
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
2. You can apply for a ten-year permit for maintenance dredging. If you wish to apply for a
ten-year permit, please provide the number of additional dredging events during the ten-year
life of the permit and the amount of material to be removed during future events.
Not Applicable
3. Indicate of your drawings the dewatering area (if applicable) and disposal site for the
dredged material (except landfill sites). Submit a sufficient number of photographs of the
dewatering and disposal sites as applicable so as to provide a clear indication of existing
conditions. For ten-year maintenance dredging permits, indicate the dewatering/disposal sites
for future dredging events, if known.
Not Applicable
4. Describe the method of dredging (i.e. clamshell, dragline, etc.) and the expected duration of
dredging.
Not Applicable
5. Indicate the physical nature of the material to be dredged (i.e. sand, silt, clay, etc.) and
provide estimated percentages of the various constituents if available. For beach nourishment
projects, grain size analysis data is required.
Not Applicable
6. Describe the method of dredged material containment (i.e. hay bales, embankment,
bulkhead, etc.) and whether return flow from the dewatering/disposal site would reenter any
waterway. Also indicate if there would be any barge overflow.
Not Applicable
MOORIN G FACILITIES
Answer the following if your project includes the construction or rehabilitation of recreational
mooring facilities.
1. It is generally recommended that any fixed piers and walk ramps be limited to four feet in
width, and that floats be limited to eight feet in width and rest at least two feet above the
waterway bottom at mean low water. Terminal floats at private, non- commercial facilities
should be limited to 20 feet in length. If you do not believe your proposal can meet with these
recommendations, please provide the reason(s).
Not Applicable
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
2. Using your plan view, show to scale the location(s), position(s) and size(s) (including length,
beam and draft) of vessel(s) to be moored at the proposed facility, including those of transient
vessel(s) if known.
Not Applicable
3. For commercial mooring sites such as marinas, indicate the capacity of the facility and
indicate on the plan view the location(s) of any proposed fueling and/or sewage pumpout
facilities. If pumpout facilities are not planned, please discuss the rationale below and indicate
the distance to the nearest available pumpout station.
Not Applicable
4. Indicate on your plan view the distance to adjacent marine structures, if any are proximate
and show the locations and dimensions of such structures.
Not Applicable
5. Discuss the need for wave protection at the proposed facility. Please be advised that if a
permit is issued, you would be required to recognize that the mooring facility may be subject to
wave action from wakes of passing vessels, whose operations would not be required to be
modified. Issuance of a permit would not relieve you of ensuring the integrity of the authorized
structure(s) and the United States would not be held responsible for damages to the
structure(s) and vessel(s) moored thereto from wakes from passing vessels.
Not Applicable
BULKHEADIN G/BAN K STABILIZATION /FILLIN G ACTIVITIES
Answer the following if your project includes construction of bulkheading (also retaining walls
and seawalls) with backfill, filling of waters/wetlands, or any other bank stabilization fills such
as riprap, revetments, gabions, etc.
1. Indicate the total volume of fill (including backfill behind a structure such as a bulkhead) as
well as the volume of fill to be placed into waters of the United States. The amount of fill in
waters of the United States can be determined by calculating the amount of fill to be placed
below the plane of spring high tide in tidal areas and below ordinary high water in non-tidal
areas.
The total amount of backfill to be used in the project is approximately 340.5 cubic yards, with
approximately 295 cubic yards of backfill below the plane of spring high tide. There will be no
fill placed directly into waters of the United States as it will all be contained behind the
bulkhead.
2. Indicate the source(s) and type(s) of fill material.
The fill material will consist of lightweight concrete fill between the existing and proposed steel
sheet pile bulkheads.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
3. Indicate the method of fill placement (i.e. by hand, bulldozer, crane, etc.). Would any
temporary fills be required in waterways or wetlands to provide access for construction
equipment? If so, please indicate the area of such waters and/or wetlands to be filled, and show
on the plan and sectional views.
The concrete fill will be delivered to the site by a ready mix concrete truck and placed by chute in a
flowable condition, directly into the cavity to be filled, or into a pump for final placement. The
concrete will fill the void between the existing and proposed steel sheet pile bulkheads, from the
mudline up to the existing grade elevation.
No temporary fills will be required in waterways or wetlands. The fill will be placed directly into its
final location.
The foregoing requests basic information on the most common types of projects requiring
Department of the Army permits. It is intended to obviate or reduce the need for requesting
additional information; however, additional information may be requested above and beyond
what is requested in this form.
Please feel free to add any additional information regarding your project which you believe
may facilitate our review.
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 8
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
FEDERAL CON SISTEN CY ASSESSMEN T FORM
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NEW YORK STATE DEPARTMENT OF STATE
COASTAL MANAGEMENT PROGRAM
Federal Consistency Assessment Form
An applicant, seeking a permit, license, waiver, certification or similar type of approval from a federal agency which is
subject to the New York State Coastal Management Program (CMP), shall complete this assessment form for any proposed
activity that will occur within and/or directly affect the State's Coastal Area. This form is intended to assist an applicant
in certifying that the proposed activity is consistent with New York State's CMP as required by U.S. Department of
Commerce regulations (15 CFR 930.57). It should be completed at the time when the federal application is prepared. The
Department of State will use the completed form and accompanying information in its review of the applicant's
certification of consistency.
A. APPLICANT (please print)
1. Name: _______________________________________________________________________________
2. Address:______________________________________________________________________________
3. Telephone: Area Code ( ) _____________________________________________________________
B. PROPOSED ACTIVITY
1. Brief description of activity:
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
2. Purpose of activity:
_____________________________________________________________________________________
_____________________________________________________________________________________
3. Location of activity:
________________________ ____________________________ ____________________________
County
City, Town, or Village Street or Site Description
4. Type of federal permit/license required:_____________________________________________________
5. Federal application number, if known:______________________________________________________
6. If a state permit/license was issued or is required for the proposed activity, identify the state agency and provide the
application or permit number, if known:
_____________________________________________________________________________________
Village of Croton-on-Hudson, Attn: Marco Gennarelli, Superintendent of Public Works
1 Van Wyck Street, Croton-on-Hudson, NY 10520
271-3775
Oversheeting approximatley 433 linear feet of existing steel sheet pile bulkhead with new steel
sheet pile bulkhead with ground anchors. The new bulkhead will be installed within 18 inches of
existing bulkhead, to the extent possible (due to driving tolerances and existing conditions in
which the existing bulkhead is not straight or plumb).
Replace an existing severely deteriorated bulkhead.
Croton Yacht Club
Nationwide Permit No. 3
N/A
NYS DEC Permit & NYS DOS Coastal Consistency Certification - pending
C. COASTAL ASSESSMENT Check either "YES" or "NO" for each of these questions. The numbers following each
question refer to the policies described in the CMP document (see footnote on page 2) which may be affected by the
proposed activity.
1. Will the proposed activity result in any of the following:
YES / NO
a. Large physical change to a site within the coastal area which will require the preparation
of an environmental impact statement? (11, 22, 25, 32, 37, 38, 41, 43) . . . . . . . . . . . . . . . .
b. Physical alteration of more than two acres of land along the shoreline, land
under water or coastal waters? (2, 11, 12, 20, 28, 35, 44) . . . . . . . . . . . . . . . . . . . . . . . . . .
c. Revitalization/redevelopment of a deteriorated or underutilized waterfront site? (1) . . . . . .
d. Reduction of existing or potential public access to or along coastal waters? (19, 20) . . . . . .
e. Adverse effect upon the commercial or recreational use of coastal fish resources? (9,10) . . .
f. Siting of a facility essential to the exploration, development and production of energy resources
in coastal waters or on the Outer Continental Shelf? (29) . . . . . . . . . . . . . . . . . . .
g. Siting of a facility essential to the generation or transmission of energy? (27) . . . . . . . . . . .
h. Mining, excavation, or dredging activities, or the placement of dredged or fill material in
coastal waters? (15, 35) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
i. Discharge of toxics, hazardous substances or other pollutants into coastal waters? (8, 15, 35)
j. Draining of stormwater runoff or sewer overflows into coastal waters? (33) . . . . . . . . . . . .
k. Transport, storage, treatment, or disposal of solid wastes or hazardous materials? (36, 39) .
l. Adverse effect upon land or water uses within the State's small harbors? (4) . . . . . . . . . . . .
2. Will the proposed activity affect or be located in, on, or adjacent to any of the following:
YES / NO
a. State designated freshwater or tidal wetland? (44) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b. Federally designated flood and/or state designated erosion hazard area? (11, 12, 17,) . . . . .
c. State designated significant fish and/or wildlife habitat? (7) . . . . . . . . . . . . . . . . . . . . . . . .
d. State designated significant scenic resource or area? (24) . . . . . . . . . . . . . . . . . . . . . . . . . .
e. State designated important agricultural lands? (26) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
f. Beach, dune or barrier island? (12) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g. Major ports of Albany, Buffalo, Ogdensburg, Oswego or New York? (3) . . . . . . . . . . . . . . .
h. State, county, or local park? (19, 20) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
i. Historic resource listed on the National or State Register of Historic Places? (23) . . . . . . . .
3. Will the proposed activity require any of the following:
YES / NO
a. Waterfront site? (2, 21, 22) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b. Provision of new public services or infrastructure in undeveloped or sparsely populated
sections of the coastal area? (5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c. Construction or reconstruction of a flood or erosion control structure? (13, 14, 16) . . . . . . .
d. State water quality permit or certification? (30, 38, 40) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e. State air quality permit or certification? (41, 43) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. Will the proposed activity occur within and/or affect an area covered by a State approved local
waterfront revitalization program? (see policies in local program document) . . . . . . . . . . . . . .
D. ADDITIONAL STEPS
1. If all of the questions in Section C are answered "NO", then the applicant or agency shall complete Section
E and submit the documentation required by Section F.
2. If any of the questions in Section C are answered "YES", then the applicant or agent is advised to consult the CMP, or
where appropriate, the local waterfront revitalization program document*. The proposed activity must be analyzed in more
detail with respect to the applicable state or local coastal policies. On a separate page(s), the applicant or agent shall: (a)
identify, by their policy numbers, which coastal policies are affected by the activity, (b) briefly assess the effects of the
activity upon the policy; and, (c) state how the activity is consistent with each policy. Following the completion of this
written assessment, the applicant or agency shall complete Section E and submit the documentation required by Section
F.
E. CERTIFICATION
The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved local
waterfront revitalization program, as appropriate. If this certification cannot be made, the proposed activity shall not be
undertaken. If this certification can be made, complete this Section.
"The proposed activity complies with New York State's approved Coastal Management Program, or with the applicable
approved local waterfront revitalization program, and will be conducted in a manner consistent with such program."
Applicant/Agent's Name:_____________________________________________________________________
Address:__________________________________________________________________________________
Telephone: Area Code ( )________________________________________________________________
Applicant/Agent's Signature:__________________________________________ Date:___________________
F. SUBMISSION REQUIREMENTS
1. The applicant or agent shall submit the following documents to the New York State Department of State, Office
of Coastal, Local Government and Community Sustainability, Attn: Consistency Review Unit, 1 Commerce
Plaza, 99 Washington Avenue - Suite 1010, Albany, New York 12231.
a. Copy of original signed form.
b. Copy of the completed federal agency application.
c. Other available information which would support the certification of consistency.
2. The applicant or agent shall also submit a copy of this completed form along with his/her application to the federal
agency.
3. If there are any questions regarding the submission of this form, contact the Department of State at
(518) 474-6000.
*These state and local documents are available for inspection at the offices of many federal agencies, Department of environmental
Conservation and Department of State regional offices, and the appropriate regional and county planning agencies. Local program
documents are also available for inspection at the offices of the appropriate local government.
Azure Dee Sleicher, P.E., Ocean and Coastal Consultants Engineering, P.C.
35 Corporate Drive, Trumbull CT 06611
268-5007
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 9
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
AN ALYSIS OF POTEN TIALLY AFFECTED COASTAL
POLICIES
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
N EW YORK STATE COASTAL POLICIES
DEVELOPMEN T POLICIES
POLICY 1: RESTORE, REVITALIZE, AN D REDEVELOP DETERIORATED AN D
UN DERUTILIZED
WATERFRON T
AREAS
FOR
COMMERCIAL,
IN DUSTRIAL,
CULTURAL,
RECREATION AL,
AN D
OTHER
COMPATIBLE USES.
The proposed project involves replacing an existing deteriorated steel sheet pile bulkhead at the
Croton Yacht Club. The site is currently utilized for recreational boating access to the Hudson
River. The proposed bulkhead replacement will allow for continued safe recreational use of the
site, and is therefore in compliance with this policy.
POLICY 2: FACILITATE THE SITIN G OF WATER-DEPEN DEN T USES AN D
FACILITIES ON OR ADJACEN T TO COASTAL WATERS.
Croton Yacht Club is a yacht club and marina. The project site currently facilitates water
dependant uses by providing access for boaters to the Hudson River. The proposed bulkhead
replacement will protect the site and will enable continued use of the Club’s facilities, consistent
with this policy.
FISH AN D WILDLIFE POLICIES
POLICY 7: SIGN IFICAN T COASTAL FISH AN D WILDLIFE HABITATS WILL BE
PROTECTED, PRESERVED, AN D WHERE PRACTICAL, RESTORED
SO AS TO MAIN TAIN THEIR VIABILITY AS HABITATS.
According to the Village of Croton-on-Hudson Local Waterfront Revitalization Program,
Haverstraw Bay is designated by both the NYSDEC and NYSDOS as a significant fish and
wildlife habitat area.
Haverstraw Bay regularly comprises a substantial part of the nursery area for striped bass,
tomcod, and Atlantic sturgeon that are produced in the Hudson. Other anadromous species, such
as American shad, blueback herring, and alewife, spawn in upstream freshwater areas, but move
south and feed in this area before returning to the River in the fall. Haverstraw Bay is also an
important nursery and feeding area within the Hudson for certain marine species, most notably
bay anchovy, Atlantic menhaden, bluefish, weakfish, and blue claw crab. Depending on location
of the salt front, a majority of the spawning and juvenile Atlantic sturgeon wintering in the
Hudson may reside in Haverstraw Bay. A portion of the shortnose sturgeon population, a Federal
endangered species, also winters in this area.
Because the nature of the proposed activities is limited to driving steel sheet pile directly
adjacent to an existing steel sheet pile bulkhead, any disturbances from such activities will be
temporary and localized, and are not expected to have a significant effect upon essential fish
habitat. These organisms have experienced regular disturbances in the Haverstraw Bay from
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
such activities as dredging and boating, and it is presumed that their migratory and feeding
patterns have adapted to such activities.
The proposed activity will not substantially degrade water quality, increase turbidity or
sedimentation, or alter water salinities or temperatures in Haverstraw Bay, and therefore are not
expected to result in a significant impairment of habitat. Although the project does involve
bulkhead oversheeting and placing approximately 295 cubic yards of fill below the Spring High
Tide Line, the fill will not be placed directly into the habitat area as it will be contained behind
the bulkhead. The new bulkhead will be driven within 18 inches of the existing bulkhead and
therefore will not result in a significant loss of habitat. Although impacts from the proposed
activities are expected to be temporary and localized, the applicant will comply with any State or
Federally issued time restrictions on the proposed work, if deemed necessary.
FLOODIN G AN D EROSION HAZARDS POLICIES
POLICY 11: BUILDIN GS AN D OTHER STRUCTURES WILL BE SITED IN THE
COASTAL AREA SO AS TO MIN IMIZE DAMAGE TO PROPERTY AN D
THE EN DAN GERIN G OF HUMAN LIVES CAUSED BY FLOODIN G
AN D EROSION .
There are no new structures proposed, only the replacement of existing erosion control
structures. This bulkhead replacement will provide structural stability to inland areas and
structures, as well as provide continued erosion control to the site.
POLICY 12: ACTIVITIES OR DEVELOPMEN T IN THE COASTAL AREA WILL BE
UN DERTAKEN SO AS TO MIN IMIZE DAMAGE TO N ATURAL
RESOURCES AN D PROPERTY FROM FLOODIN G AN D EROSION BY
PROTECTIN G N ATURAL PROTECTIVE FEATURES IN CLUDIN G
BEACHES, DUN ES, BARRIER ISLAN DS AN D BLUFFS.
The proposed project will have no adverse impacts to natural resources and/or property. The
plan to oversheet the existing bulkhead will not cause adverse impacts to the site. The site is
currently bordered on three sides by a steel sheet pile bulkhead, and no natural protective
features such as beaches, dunes, or bluffs exist at the site. The proposed work will maintain the
current nature of the shoreline by replacing the existing bulkhead which is severely deteriorated,
thereby preventing future erosion that could occur if the bulkhead were allowed to deteriorate
further. In addition, the top of new bulkhead elevation will be 3 feet above existing and
proposed grade elevation. The increased elevation of the top of the bulkhead will afford some
additional protection from flooding to the upland property. The above-grade portion of the
bulkhead will have scuppers at 20 feet on-center, in order to allow drainage of surface water
from the upland to the Hudson River, as it currently exists.
POLICY 13: THE
CON STRUCTION
OR
RECON STRUCTION
OF
EROSION
PROTECTION STRUCTURES SHALL BE UN DERTAKEN ON LY IF
THEY HAVE A REASON ABLE PROBABILITY OF CON TROLLIN G
EROSION FOR AT LEAST THIRTY YEARS AS DEMON STRATED IN
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
DESIGN AN D CON STRUCTION STAN DARDS AN D/OR ASSURED
MAIN TEN AN CE OR REPLACEMEN T PROGRAMS.
The existing bulkhead is estimated to have been constructed in the late 1950's but is at the end of
its service life. The steel sheet pile bulkhead oversheeting will provide a minimum of 30 years
of protection. While the standard steel sheet pile bulkhead has a design life of approximately 30
years, routine maintenance can prolong the design life. Newer technology such as protective
coatings and cathodic protection can help maintain a bulkhead in good condition for a longer
period of time. The applicant is considering the installation of an impressed current cathodic
protection (ICCP) system on the bulkhead, and intends to perform routine inspections and
maintenance such as protective coating repair, in order to maximize the bulkhead's service life.
With the ICPP system and protective coating in place and properly maintained, the anticipated
design life of the bulkhead is 50 years.
POLICY14: ACTIVITIES
AN D
DEVELOPMEN T,
IN CLUDIN G
THE
CON STRUCTION
OR
RECON STRUCTION
OF
EROSION
PROTECTION STRUCTURES, SHALL BE UN DERTAKEN SO THAT
THERE WILL BE N O MEASUREABLE IN CREASE IN EROSION OR
FLOODIN G AT THE SITE OF SUCH ACTIVITIES OR DEVELOPMEN T,
OR AT OTHER LOCATION S.
All proposed structures are to be built equal to, if not better than, the erosion control structures in
place at the site now. The proposed structures will have no measurable increase in erosion or
flooding at the site. The proposed replacement structures will not increase erosion or flooding off
site.
POLICY 15: MIN IN G, EXCAVATION OR DREDGIN G IN COASTAL WATERS SHALL
N OT SIGN IFICAN TLY IN TERFERE WITH THE N ATURAL COASTAL
PROCESSES
WHICH
SUPPLY
BEACH
MATERIALS
TO
LAN D
ADJACEN T TO SUCH WATERS AN D SHALL BE UN DERTAKEN IN A
MAN N ER WHICH WILL N OT CAUSE AN IN CREASE IN EROSION OF
SUCH LAN D.
The proposed work will not involve any mining, excavation, or dredging in coastal waters. The
proposed work involves oversheeting of an existing steel sheet pile bulkhead. Therefore, the
current nature of the shoreline will be maintained and the proposed work will not significantly
interfere with natural coastal processes or cause an increase in erosion for adjacent lands.
POLICY 16: PUBLIC FUN DS SHALL ON LY BE USED FOR EROSION PROTECTIVE
STRUCTURES WHERE N ECESSARY TO PROTECT HUMAN LIFE,
AN D N EW DEVELOPMEN T WHICH REQUIRES A LOCATION
WITHIN OR ADJACEN T TO AN EROSION HAZARD AREA TO BE
ABLE TO FUN CTION , OR EXISTIN G DEVELOPMEN T; AN D ON LY
WHERE THE PUBLIC BEN EFITS OUTWEIGH THE LON G TERM
MON ETARY AN D OTHER COSTS IN CLUDIN G THE POTEN TIAL FOR
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
IN CREASIN G EROSION AN D ADVERSE EFFECTS ON N ATURAL
PROTECTIVE FEATURES.
The project site is owned by the Village of Croton-on-Hudson, and therefore the proposed
project will be undertaken using public funds. The use of public funds for this project is
compliant with this policy because it involves the replacement of an existing erosion protection
structure at an existing development. The existing site is currently leased by and used by the
Croton Yacht Club, which facilitates water dependent use by members of the community. The
proposed repair will allow for continued water dependent use of the site. In addition, the
proposed project includes a 10 foot wide walkway which is intended for public access along the
Hudson River waterfront.
POLICY 17: WHEN EVER POSSIBLE, USE N ON -STRUCTURAL MEASURES TO
MIN IMIZE DAMAGE TO N ATURAL RESOURCES AN D PROPERTY
FROM FLOODIN G AN D EROSION . SUCH MEASURES SHALL
IN CLUDE: (1) THE SET BACK OF BUILDIN GS AN D STRUCTURES; (2)
THE PLAN TIN G OF VEGETATION AN D THE IN STALLATION OF
SAN D FEN CIN G AN D DRAIN IN G; (3) THE RESHAPIN G OF BLUFFS;
AN D (4) THE FLOOD-PROOFIN G OF BUILDIN GS OR THEIR
ELEVATION ABOVE THE BASE FLOOD LEVEL.
It is estimated that the existing structures have been in place since the late 1950's. Due to the age
and location of the existing structures, non-structural measures to protect the property from
flooding and erosion are not feasible. Future improvements to the property may include non-
structural measures such as elevating and flood proofing new buildings.
POLICY 19: PROTECT, MAIN TAIN , AN D IN CREASE THE LEVEL AN D TYPES OF
ACCESS TO PUBLIC WATER-RELATED RECREATION RESOURCES
AN D FACILITIES.
The proposed project will protect and maintain the existing publicly owned property and its use
as a yacht club and marina. While the yacht club is private, many members of the local
community are members and utilize the club’s facilities for recreation.
POLICY 20: ACCESS TO THE PUBLICLY-OWN ED FORESHORE AN D TO LAN DS
IMMEDIATELY ADJACEN T TO THE FORESHORE OR THE WATER'S
EDGE THAT ARE PUBLICLY-OWN ED SHALL BE PROVIDED AN D IT
SHALL BE PROVIDED IN A MAN N ER COMPATIBLE WITH
ADJOIN IN G USES.
The proposed project includes a 10 foot wide walkway immediately adjacent to the water's edge,
which is intended for public access along the Hudson River waterfront. This proposed walkway
will replace an existing, narrower walkway, and will be entirely compatible with existing
adjoining uses of the property, such as boating, by yacht club members.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
RECREATION
POLICY 21: WATER-DEPEN DEN T AN D WATER-EN HAN CED RECREATION WILL
BE EN COURAGED AN D FACILITATED, AN D WILL BE GIVEN
PRIORITY OVER N ON -WATER RELATED USES ALON G THE COAST
The proposed project will encourage water-dependent and water-enhanced recreation by
maintaining the existing water-dependent use of the property as a yacht club and marina.
POLICY22: DEVELOPMEN T, WHEN LOCATED ADJACEN T TO THE SHORE,
WILL PROVIDE FOR WATER-RELATED RECREATION , WHEN EVER
SUCH USE IS COMPATIBLE WITH REASON ABLY AN TICIPATED
DEMAN D FOR SUCH ACTIVITIES, AN D IS COMPATIBLE WITH THE
PRIMARY PURPOSE OF THE DEVELOPMEN T.
Croton Yacht Club is a yacht club and marina. The proposed structures are intended to provide
continued protection the property and to provide access to the Hudson River so that water-related
recreation is allowed to continue.
WATER AN D AIR RESOURCES POLICIES
POLICY 30: MUN ICIPAL, IN DUSTRIAL, AN D COMMERCIAL DISCHARGE OF
POLLUTAN TS, IN CLUDIN G BUT N OT LIMITED TO, TOXIC AN D
HAZARDOUS
SUBSTAN CES,
IN TO
COASTAL
WATERS
WILL
CON FORM
TO
STATE
AN D
N ATION AL
WATER
QUALITY
STAN DARDS.
No discharge of pollutants into coastal waters is anticipated to result from the proposed activity.
The proposed work involves driving steel sheet pile 18 inches outboard of the existing steel sheet
pile bulkhead, and filling the void between the existing and new steel sheet pile bulkhead with
lightweight concrete fill. The fill will be isolated from coastal waters since it will be contained
behind the new steel sheet pile bulkhead. Therefore the proposed work is in compliance with this
policy.
POLICY 35: DREDGIN G AN D FILLIN G IN COASTAL WATERS AN D DISPOSAL OF
DREDGED MATERIAL WILL BE UN DERTAKEN IN A MAN N ER THAT
MEETS EXISTIN G STATE PERMIT REQUIREMEN TS, AN D PROTECTS
SIGN IFICAN T FISH AN D WILDLIFE HABITATS, SCEN IC RESOURCES,
N ATURAL PROTECTIVE FEATURES, IMPORTAN T AGRICULTURAL
LAN DS, AN D WETLAN DS.
The proposed work involves backfilling with lightweight concrete fill between the existing and
proposed steel sheet pile bulkheads. The total amount of backfill to be used in the project is
approximately 340.5 cubic yards, with approximately 295 cubic yards of backfill below the plane
of spring high tide. The concrete fill will be delivered to the site by a ready mix concrete truck and
placed by chute in a flowable condition, directly into the cavity to be filled, or into a pump for final
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
placement. The concrete will fill the void between the existing and proposed steel sheet pile
bulkheads, from the mudline up to the existing grade elevation. There will be no fill placed directly
into coastal waters, as it will all be contained behind the bulkhead; therefore, the proposed
placement of fill is not anticipated to have an adverse impact on water quality, fish and wildlife
habitats, or other important coastal resources. The applicant will comply with any State or
Federally issued permit requirements.
POLICY 38: THE QUALITY AN D QUAN TITY OF SURFACE WATER AN D
GROUN DWATER
SUPPLIES
WILL
BE
CON SERVED
AN D
PROTECTED,
PARTICULARLY
WHERE
SUCH
WATERS
CON STITUTE THE PRIMARY OR SOLE SOURCE OF WATER
SUPPLY.
The proposed work will have no effect on the quality or quantity of surface or groundwater
supplies. Therefore, this policy is not applicable.
POLICY 40: EFFLUEN T
DISCHARGED
FROM
MAJOR
STEAM
ELECTRIC
GEN ERATIN G AN D IN DUSTRIAL FACILITIES IN TO COASTAL
WATERS WILL N OT BE UN DULY IN JURIOUS TO FISH AN D
WILDLIFE AN D SHALL CON FORM TO STATE WATER QUALITY
STAN DARDS.
The proposed site is not an electric generating or industrial facility. Therefore, this policy is not
applicable.
WETLAN DS POLICY
POLICY 44: PRESERVE AN D PROTECT TIDAL AN D FRESHWATER WETLAN DS
AN D PRESERVE THE BEN EFITS DERIVED FROM THESE AREAS.
By definition, all lands surrounding the coastal waters of New York are considered tidal
wetlands. Therefore, by definition, the proposed activity will be located in an area of Tidal
Wetlands. The impact of the proposed structures on the natural environment will be minimized
through proper planning and design, replacing damaged erosion control structures with steel
sheet pile bulkhead oversheeting.
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 10
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
VILLAGE OF CROTON -ON -HUDSON COASTAL
ASSESSMEN T FORM
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
Village of Croton-on-Hudson
COASTAL ASSESSMENT FORM
A. INSTRUCTIONS (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction) _____________________________________________
b) Financial assistance (e.g. grant, loan, subsidy) ______________________________
c) Permit, approval, license, certification _____________________________________
d) Agency undertaking action ______________________________________________
2. Describe nature and extent of action: _________________________________________
3. Location of actions: _______________________________________________________
(street or site description)
construction
Village of Croton-on-Hudson
replacement of approximately 433 LF of existing steel sheet pile bulkhead, by oversheeting
with new steel sheet pile bulkhead
Croton Yacht Club
1.1 acres
yacht cub, marina
WC (Waterfront Commercial)
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations:
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
If yes, which state or federal agency?___________________________
C. COASTAL ASSESSMENT:
(Check either "yes" or "no" for each of the following questions)
YES NO
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon any of the resource
areas identified on the coastal area map:
_____ _____
a) Significant fish or wildlife habitats?
_____ _____
b) Scenic resources of local or statewide significance?
_____ _____
c) Important agricultural lands?
_____ _____
d) Natural protective features in an erosion hazard area?
_____ _____
If the answer to any question above is "yes", please explain in Section D any measures which
will be undertaken to mitigate any adverse effects.
N/A. Site is currently surrounded on 3 sides by a steel sheet pile bulkhead.
N/A
NYSDEC, NYSDOS, USACE
(approvals required)
YES
NO
2.
Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ _____
b) Scenic quality of the coastal environment?
_____ _____
c) Development of future or existing water dependent uses?
_____ _____
d) Operation of the State's major ports?
_____ _____
e) Land or water uses within a small harbor area?
_____ _____
f) Stability of the shoreline?
_____ _____
g) Surface or groundwater quality?
_____ _____
h) Existing or potential public recreation opportunities?
_____ _____
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
_____ _____
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
_____ _____
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
_____ _____
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
_____ _____
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
_____ _____
e) Mining, excavation, filling or dredging in coastal waters?
_____ _____
f) Reduction of existing or potential public access to or along
the shore?
_____ _____
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
_____ _____
h) Development within a designated flood or erosion hazard area? _____ _____
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
_____ _____
j) Construction or reconstruction of erosion protective structures? _____ _____
k) Diminished surface or groundwater quality?
_____ _____
l) Removal of ground cover from the site?
_____ _____
4. Project
a) If project is to be located adjacent to shore:
YES NO
1. Will water-related recreation be provided?
_____ _____
2. Will public access to the foreshore be provided?
_____ _____
3. Does the project require a waterfront site?
_____ _____
4. Does it supplant a recreational or maritime use?
_____ _____
5. Do essential public services and facilities presently exist at
or near the site?
_____ _____
6. Is it located in a flood prone area?
_____ _____
7. Is it located in an area of high erosion?
_____ _____
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and types of public access to water-related recreation
resources and facilities?
_____ _____
2. If located in the foreshore, will access to those and
adjacent lands be provided?
_____ _____
3. Will it involve the siting and construction of major energy
facilities?
_____ _____
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
_____ _____
c) Is the project site presently used by the community neighborhood
an open space or recreation area?
_____ _____
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
_____ _____
e) Is the project site presently used for commercial fishing or fish
processing?
_____ _____
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
_____ _____
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
_____ _____
h) Will the project involve any waste discharges into coastal waters? _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
_____ _____
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
_____ _____
YES
NO
k) Does the project involve shipment or storage of petroleum
products?
_____ _____
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
_____ _____
m) Does the project involve or change existing ice management
practices?
_____ _____
n) Will the project affect any area designated as a tidal or
freshwater wetland?
_____ _____
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
_____ _____
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
_____ _____
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
_____ _____
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
_____ _____
D. REMARKS OR ADDITIONAL INFORMATION.
For questions answered “yes” in Section C, explain methods you will undertake to reduce
adverse effects. Review the LWRP to see if the project is consistent with each policy. List
policies the project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
See attachment.
The final version of this form shall be sent to the Department of State (New York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any
question in Section C is answered “yes” and either of the following conditions is met.
• Section B.1 (a) or B.1 (b) is checked OR
• Section B.1 (c) and B.11 is answered “yes”
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Azure Dee Sleicher, P.E.
Project Manager
Ocean and Coastal Consultants Engineering, P.C.
268-5007
azsl@ocean-coastal.com
October 2011
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
VILLAGE OF CROTON -ON -HUDSON COASTAL ASSESSMEN T
C. COASTAL ASSESSMEN T
1. Will the proposed action be located in, or contiguous to, or have a potentially adverse effect
upon any of the resource areas identified on the coastal area map?
a) Significant fish or wildlife habitats? YES
According to the Village of Croton-on-Hudson Local Waterfront Revitalization Program,
Haverstraw Bay is designated by both the NYSDEC and NYSDOS as a significant fish and
wildlife habitat area.
Haverstraw Bay regularly comprises a substantial part of the nursery area for striped bass,
tomcod, and Atlantic sturgeon that are produced in the Hudson. Other anadromous species,
such as American shad, blueback herring, and alewife, spawn in upstream freshwater areas,
but move south and feed in this area before returning to the River in the fall. Haverstraw Bay
is also an important nursery and feeding area within the Hudson for certain marine species,
most notably bay anchovy, Atlantic menhaden, bluefish, weakfish, and blue claw crab.
Depending on location of the salt front, a majority of the spawning and juvenile Atlantic
sturgeon wintering in the Hudson may reside in Haverstraw Bay. A portion of the shortnose
sturgeon population, a Federal endangered species, also winters in this area.
Because the nature of the proposed activities is limited to driving steel sheet pile directly
adjacent to an existing steel sheet pile bulkhead, any disturbances from such activities will be
temporary and localized, and are not expected to have a significant effect upon essential fish
habitat. These organisms have experienced regular disturbances in the Haverstraw Bay from
such activities as dredging and boating, and it is presumed that their migratory and feeding
patterns have adapted to such activities.
The proposed activity will not substantially degrade water quality, increase turbidity or
sedimentation, or alter water salinities or temperatures in Haverstraw Bay, and therefore are
not expected to result in a significant impairment of habitat. Although the project does
involve bulkhead oversheeting and placing approximately 295 cubic yards of fill below the
Spring High Tide Line, the fill will not be placed directly into the habitat area as it will be
contained behind the bulkhead. The new bulkhead will be driven within 18 inches of the
existing bulkhead and therefore will not result in a significant loss of habitat. Although
impacts from the proposed activities are expected to be temporary and localized, the
applicant will comply with any State or Federally issued time restrictions on the proposed
work, if deemed necessary.
2. Will the proposed action have a significant effect upon:
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
a) Commercial or recreational use of fish and wildlife resources? YES
The proposed project will have a beneficial effect upon recreational use of fish and wildlife
resources. The proposed work involves replacing an existing deteriorated steel sheet pile
bulkhead at the Croton Yacht Club, and therefore will allow continued use of this facility for
boating and access to the Hudson River for such activities as fishing and passive viewing of
the wildlife resources in the area.
b) Scenic quality of the coastal environment? YES
The proposed project will have a positive impact upon the scenic quality of the coastal
environment because it will involve the rehabilitation of the shoreline by installing a new
steel sheet pile bulkhead to replace an existing deteriorated steel sheet pile bulkhead. The
appearance of this portion of the shoreline will therefore be improved.
c) Development of future or existing water dependent uses? YES
The proposed project will maintain a site that has existing water dependent uses, by replacing
an existing deteriorated steel sheet pile bulkhead. In addition, this project involves the
construction of a 10 foot wide public access walkway along the water's edge.
e) Land or water uses within a small harbor area? YES
Croton Yacht Club is a yacht club and marina. The project site currently facilitates water
dependant uses by providing access for boaters to the Hudson River. The proposed bulkhead
replacement will protect the site and will enable continued use of the Club’s facilities,
consistent with this policy.
f) Stability of the shoreline? YES
The proposed bulkhead replacement will provide structural stability to inland areas and
structures, as well as provide continued erosion control to the site.
h) Existing or potential public recreation opportunities? YES
The proposed project involves replacing an existing deteriorated steel sheet pile bulkhead at
the Croton Yacht Club. The site is currently utilized for recreational boating access to the
Hudson River. The proposed bulkhead replacement will allow for continued safe
recreational use of the site.
3. Will the proposed action involve or result in any of the following:
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
a) Physical alteration of land along shoreline, land under water, or coastal waters? YES
The proposed work will involve very minor alteration of land along the shoreline. The work
involves oversheeting an existing steel sheet pile bulkhead, and therefore will not change the
character of the shoreline. The new bulkhead structure will be located 18 inches offshore of
the existing bulkhead, resulting in minimal encroachment into coastal waters.
h) Development within a designated flood or erosion hazard area? YES
The project site is located in a flood zone. The existing grade of the upland is only
approximately 2 feet above Mean Higher High Water (MHHW) and therefore the site
floods regularly. A 3-foot-high rock gabion currently lines the offshore perimeter of the
property, on the northwest and southwest sides. The gabion serves as additional
protection for the upland during flood events. The proposed work involves removing this
rock gabion, and constructing the new bulkhead such that the top of new bulkhead
elevation will be 3 feet above existing and proposed grade elevation. The increased
elevation of the top of the bulkhead will afford some additional protection from flooding
to the upland property. The above-grade portion of the bulkhead will have scuppers at 20
feet on-center, in order to allow drainage of surface water from the upland to the Hudson
River, as it currently exists.
j) Construction or reconstruction of erosion protective structures? YES
The proposed project will involve replacement of the existing erosion control structure by
oversheeting the existing steel sheet pile bulkhead with new a steel sheet pile bulkhead.
4. Project
a) If project is to be located adjacent to shore:
1) Will water-related recreation be provided? YES
The site is a yacht club and marina that facilitates water dependant uses by providing access
for boaters to the Hudson River. The proposed replacement of the existing bulkhead will
enable continued use of the Club’s facilities for water-related recreation.
2) Will public access to the foreshore be provided? YES
The proposed structures will enable access to the foreshore as it currently exists.
3) Does the project require a waterfront site? YES
See item (1) above.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
5) Do essential public services and facilities presently exist at or near the site? YES
The site is an established yacht club and marina. Services and facilities that exist at the site
will remain.
6) Is it located in a flood prone area? YES
The project site is located in a flood zone. The proposed structures will aid to reduce the
adverse impacts of floods.
b) If the project site is publicly owned:
1) Will the project protect, maintain and/or increase the level and types of public access to
water-related recreation resources and facilities? YES
The proposed project will protect and maintain the existing publicly owned property and its
use as a yacht club and marina. While the yacht club is private, many members of the local
community are members and utilize the club’s facilities for recreation. In addition, the
proposed project includes a 10 foot wide walkway immediately adjacent to the water's edge,
which is intended for public access along the Hudson River waterfront. This proposed
walkway will replace an existing, narrower walkway, and will be entirely compatible with
existing adjoining uses of the property, such as boating, by yacht club members.
2) If located in the foreshore, will access to those and adjacent lands be provided? YES
The project site is located above the high tide line and therefore not in the foreshore.
However, access to the adjacent upland will be provided to the public by means of a newly
constructed 10 foot wide public access walkway.
c) Is the project site presently used by the community neighborhood as an open space or
recreation area? YES
While the club is private, many members of the local community are members and utilize the
club’s facilities for recreation.
d) Does the present site offer or include scenic views or vistas known to be important to the
community? YES
Similar to above, while the club is private, it does provide important scenic views to its
members. The proposed public access walkway will encourage use of the site by the public.
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
f) Will the surface area of any waterways or wetland area be increased or decreased by the
proposals? YES
The new steel sheet pile bulkhead will be driven 18 inches outboard of the existing steel
sheet pile bulkhead. This will result in a net decrease of approximately 830 square feet of
surface area of the adjacent waterway. This decrease in waterway surface area is considered
to be minimal, as it will be distributed over 433 linear feet of bulkhead shoreline.
n) Will the project affect any area designated as a tidal or freshwater wetland? YES
By definition, all lands surrounding the coastal waters of New York are considered tidal
wetlands. Therefore, by definition, the proposed activity will be located in an area of
Tidal Wetlands. The impact of the proposed structures on the natural environment will
be minimized through proper planning and design.
p) Will best management practices be utilized to control storm water runoff into coastal
waters? YES
The new bulkhead is proposed to be constructed such that the top of new bulkhead
elevation will be 3 feet above existing and proposed grade elevation. The increased
elevation of the top of the bulkhead will afford some additional protection from flooding
to the upland property. The above-grade portion of the bulkhead will have scuppers at 20
feet on-center, in order to allow drainage of surface water from the upland to the Hudson
River, as it currently exists. Therefore, the proposed work will not significantly alter
drainage, flow patterns, or surface water runoff.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
VILLAGE OF CROTON -ON -HUDSON COASTAL POLICIES
DEVELOPMEN T POLICIES
POLICY 1: RESTORE, REVITALIZE, AN D REDEVELOP DETERIORATED AN D
UN DERUTILIZED
WATERFRON T
AREAS
FOR
COMMERCIAL,
IN DUSTRIAL, CULTURAL, RECREATION AL
AN D
OTHER
COMPATABLE USES.
The proposed project involves replacing an existing deteriorated steel sheet pile bulkhead at the
Croton Yacht Club. The site is currently utilized for recreational boating access to the Hudson
River. The proposed bulkhead replacement will allow for continued safe recreational use of the
site, and is therefore in compliance with this policy.
POLICY 2: FACILITATE THE SITIN G OF WATER DEPEN DEN T USES AN D
FACILITIES ON OR ADJACEN T TO COASTAL WATERS.
Croton Yacht Club is a yacht club and marina. The project site currently facilitates water
dependant uses by providing access for boaters to the Hudson River. The proposed bulkhead
replacement will protect the site and will enable continued use of the Club’s facilities, consistent
with this policy.
POLICY 3: THE STATE COASTAL POLICY REGARDIN G THE DEVELOPMEN T
OF MAJOR PORTS IS N OT APPLICABLE TO CROTON .
Not applicable.
POLICY 4: THE STATE COASTAL POLICY REGARDIN G THE STREN GTHEN IN G
OF SMALL HARBORS IS N OT APPLICABLE TO CROTON .
Not applicable.
POLICY 5: EN COURAGE THE LOCATION OF DEVELOPMEN T IN AREAS
WHERE PUBLIC SERVICES AN D FACILITIES ESSEN TIAL TO SUCH
DEVELOPMEN T
ARE
ADEQUATE,
EXCEPT
WHEN
SUCH
DEVELOPMEN T HAS SPECIAL FUN CTION AL REQUIREMEN TS OR
OTHER CHARACTERISTICS WHICH N ECESSITATE ITS LOCATION
IN OTHER COASTAL AREAS.
The proposed project involves replacing a deteriorated steel sheet pile bulkhead at an existing
marina and yacht club facility, which will allow for continued safe recreational use of the site.
Services and facilities at this location are adequate and will be maintained. Therefore, the
proposed work is in compliance with this policy.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
POLICY 6: EXPEDITE PERMIT PROCEDURES IN ORDER TO FACILITATE THE
SITIN G OF DEVELOPMEN T ACTIVITIES AT SUITABLE LOCATION S.
Since the Village of Croton-on-Hudson is the applicant, it is likely that coordination between
State and Town can be streamlined in order to expedite permit procedures.
FISH AN D WILDLIFE POLICIES
POLICY 7: SIGN IFICAN T COASTAL FISH AN D WILDLIFE HABITATS WILL BE
PROTECTED, PRESERVED, AN D, WHERE PRACTICAL, RESTORED
SO AS TO MAIN TAIN THEIR VIABILITY AS HABITATS.
According to the Village of Croton-on-Hudson Local Waterfront Revitalization Program,
Haverstraw Bay is designated by both the NYSDEC and NYSDOS as a significant fish and
wildlife habitat area.
Haverstraw Bay regularly comprises a substantial part of the nursery area for striped bass,
tomcod, and Atlantic sturgeon that are produced in the Hudson. Other anadromous species, such
as American shad, blueback herring, and alewife, spawn in upstream freshwater areas, but move
south and feed in this area before returning to the River in the fall. Haverstraw Bay is also an
important nursery and feeding area within the Hudson for certain marine species, most notably
bay anchovy, Atlantic menhaden, bluefish, weakfish, and blue claw crab. Depending on location
of the salt front, a majority of the spawning and juvenile Atlantic sturgeon wintering in the
Hudson may reside in Haverstraw Bay. A portion of the shortnose sturgeon population, a Federal
endangered species, also winters in this area.
Because the nature of the proposed activities is limited to driving steel sheet pile directly
adjacent to an existing steel sheet pile bulkhead, any disturbances from such activities will be
temporary and localized, and are not expected to have a significant effect upon essential fish
habitat. These organisms have experienced regular disturbances in the Haverstraw Bay from
such activities as dredging and boating, and it is presumed that their migratory and feeding
patterns have adapted to such activities.
The proposed activity will not substantially degrade water quality, increase turbidity or
sedimentation, or alter water salinities or temperatures in Haverstraw Bay, and therefore are not
expected to result in a significant impairment of habitat. Although the project does involve
bulkhead oversheeting and placing approximately 295 cubic yards of fill below the Spring High
Tide Line, the fill will not be placed directly into the habitat area as it will be contained behind
the bulkhead. The new bulkhead will be driven within 18 inches of the existing bulkhead and
therefore will not result in a significant loss of habitat. Although impacts from the proposed
activities are expected to be temporary and localized, the applicant will comply with any State or
Federally issued time restrictions on the proposed work, if deemed necessary.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
POLICY 8: PROTECT FISH AN D WILDLIFE RESOURCES IN THE COASTAL
AREA FROM THE IN TRODUCTION OF HAZARDOUS WASTES AN D
OTHER POLLUTAN TS WHICH BIO-ACCUMULATE IN THE FOOD
CHAIN OR WHICH CAUSE SIGN IFICAN T SUBLETHAL OR LETHAL
EFFECT ON THOSE RESOURCES.
This policy is not applicable. The proposed work is not anticipated to result in the introduction
of hazardous wastes or other pollutants into the coastal area.
POLICY 9: EXPAN D
RECREATION AL
USE
OF
FISH
AN D
WILDLIFE
RESOURCES IN COASTAL AREAS BY IN CREASIN G ACCESS TO
EXISTIN G RESOURCES, SUPPLEMEN TIN G EXISTIN G STOCKS, AN D
DEVELOPIN G N EW RESOURCES. SUCH EFFORTS SHALL BE MADE
IN
AMAN N ER
WHICH
EN SURES
THE
PROTECTION
OF
REN EWABLE FISH AN D WILDLIFE RESOURCES AN D CON SIDERS
OTHER ACTIVITIES DEPEN DEN T ON THEM.
The proposed work will maintain an existing facility that provides access for recreational use of
fish and wildlife resources in a coastal area. Therefore, the proposed work is compliant with this
policy.
POLICY 10: FURTHER DEVELOP COMMERCIAL FlN FISH, SHELLFISH AN D
CRUSTACEAN
RESOURCES
IN
THE
COASTAL
AREA
BY
EN COURAGIN G THE CON STRUCTION OF N EW OR IMPROVEMEN T
OF EXISTIN G ON -SHORE COMMERCIAL FISHIN G FACILITIES,
IN CREASIN G MARKETIN G OF THE STATE'S SEAFOOD PRODUCTS,
MAIN TAIN IN G
ADEQUATE
STOCKS,
AN D
EXPAN DIN G
AQUACULTURE FACILITIES. SUCH EFFORTS SHALL BE MADE IN
A MAN N ER WHICH EN SURES THE PROTECTION OF REN EWABLE
FISH AN D WILDLIFE RESOURCES AN D CON SIDERS OTHER
ACTIVITIES DEPEN DEN T ON THEM.
This policy is not applicable. The project site is not a commercial fishing facility.
FLOODIN G AN D EROSION POLICIES
POLICY 11: BUILDIN GS AN D OTHER STRUCTURES WILL BE SITED IN THE
COASTAL AREA SO AS TO MIN IMIZE DAMAGE TO PROPERTY AN D
THE EN DAN GERIN G OF HUMAN LIVES CAUSED BY FLOODIN G
AN D EROSION .
There are no new structures proposed, only the replacement of existing erosion control
structures. This bulkhead replacement will provide structural stability to inland areas and
structures, as well as provide continued erosion control to the site.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
POLICY 12: ACTIVITIES OR DEVELOPMEN T IN THE COASTAL AREA WILL BE
UN DERTAKEN SO AS TO MIN IMIZE DAMAGE TO N ATURAL
RESOURCES AN D PROPERTY FROM FLOODIN G AN D EROSION BY
PROTECTIN G N ATURAL PROTECTIVE FEATURES IN CLUDIN G
BEACHES, DUN ES, BARRIER ISLAN DS AN D BLUFFS. PRIMARY
DUN ES WILL BE PROTECTED FROM ALL EN CROACHMEN TS THAT
COULD IMPAIR THEIR N ATURAL PROTECTIVE CAPACITY.
The proposed project will have no adverse impacts to natural resources and/or property. The
plan to oversheet the existing bulkhead will not cause adverse impacts to the site. The site is
currently bordered on three sides by a steel sheet pile bulkhead, and no natural protective
features such as beaches, dunes, or bluffs exist at the site. The proposed work will maintain the
current nature of the shoreline by replacing the existing bulkhead which is severely deteriorated,
thereby preventing future erosion that could occur if the bulkhead were allowed to deteriorate
further. In addition, the top of new bulkhead elevation will be 3 feet above existing and
proposed grade elevation. The increased elevation of the top of the bulkhead will afford some
additional protection from flooding to the upland property. The above-grade portion of the
bulkhead will have scuppers at 20 feet on-center, in order to allow drainage of surface water
from the upland to the Hudson River, as it currently exists.
POLICY 13: THE
CON STRUCTION
OR
RECON STRUCTION
OF
EROSION
PROTECTION STRUCTURES SHALL BE UN DERTAKEN ON LY IF
THEY HAVE A REASON ABLE PROBABILITY OF CON TROLLIN G
EROSION FOR AT LEAST THIRTY YEARS AS DEMON STRATED IN
DESIGN AN D CON STRUCTION STAN DARDS AN D/OR ASSURED
MAIN TEN AN CE OR REPLACEMEN T PROGRAMS.
The existing bulkhead is estimated to have been constructed in the late 1950's but is at the end of
its service life. The steel sheet pile bulkhead oversheeting will provide a minimum of 30 years
of protection. While the standard steel sheet pile bulkhead has a design life of approximately 30
years, routine maintenance can prolong the design life. Newer technology such as protective
coatings and cathodic protection can help maintain a bulkhead in good condition for a longer
period of time. The applicant is considering the installation of an impressed current cathodic
protection (ICCP) system on the bulkhead, and intends to perform routine inspections and
maintenance such as protective coating repair, in order to maximize the bulkhead's service life.
With the ICCP system and protective coating in place and properly maintained, the anticipated
design life of the bulkhead is 50 years.
POLICY 14: ACTIVITIES
AN D
DEVELOPMEN T,
IN CLUDIN G
THE
CON STRUCTION
OR
RECON STRUCTION
OF
EROSION
PROTECTION STRUCTURES, SHALL BE UN DERTAKEN SO THAT
THERE WILL BE N O MEASURABLE IN CREASE IN EROSION OR
FLOODIN G AT THE SITE OF SUCH ACTIVITIES OR DEVELOPMEN T,
OR AT OTHER LOCATION S.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
All proposed structures are to be built equal to, if not better than, the erosion control structures in
place at the site now. The proposed structures will have no measurable increase in erosion or
flooding at the site. The proposed replacement structures will not increase erosion or flooding off
site.
POLICY 15: MIN IN G, EXCAVATION OR DREDGIN G IN COASTAL WATERS
SHALL N OT SIGN IFICAN TLY IN TERFERE WITH THE N ATURAL
COASTAL PROCESSES WHICH SUPPLY BEACH MATERIALS
TO
LAN D ADJACEN T TO SUCH WATERS AN D SHALL BE UN DERTAKEN
IN A MAN N ER WHICH WILL N OT CAUSE AN IN CREASE IN
EROSION OF SUCH LAN D.
The proposed work will not involve any mining, excavation, or dredging in coastal waters. The
proposed work involves oversheeting of an existing steel sheet pile bulkhead. Therefore, the
current nature of the shoreline will be maintained and the proposed work will not significantly
interfere with natural coastal processes or cause an increase in erosion for adjacent lands.
POLICY 16: PUBLIC FUN DS SHALL ON LY BE USED FOR EROSION PROTECTIVE
STRUCTURES WHERE N ECESSARY TO PROTECT HUMAN LIFE,
AN D N EW DEVELOPMEN T WHICH REQUIRES A LOCATION
WITHIN OR ADJACEN T TO AN EROSION HAZARD AREA TO BE
ABLE TO FUN CTION , OR EXISTIN G DEVELOPMEN T; AN D ON LY
WHERE THE PUBLIC BEN EFITS
OUTWEIGH THE LON G TERM
MON ETARY AN D OTHER COSTS IN CLUDIN G THE POTEN TIAL FOR
IN CREASIN G EROSION AN D ADVERSE EFFECTS ON N ATURAL
PROTECTIVE FEATURES.
The project site is owned by the Village of Croton-on-Hudson, and therefore the proposed
project will be undertaken using public funds. The use of public funds for this project is
compliant with this policy because it involves the replacement of an existing erosion protection
structure at an existing development. The existing site is currently leased by and used by the
Croton Yacht Club, which facilitates water dependent use by members of the community. The
proposed repair will allow for continued water dependent use of the site. In addition, the
proposed project includes a 10 foot wide walkway which is intended for public access along the
Hudson River waterfront.
POLICY 17: WHEN EVER POSSIBLE, USE N ON -STRUCTURAL MEASURES TO
MIN IMIZE DAMAGE TO N ATURAL RESOURCES AN D PROPERTY
FROM FLOODIN G AN D EROSION . SUCH MEASURES SHALL
IN CLUDE: (i) THE SETBACK OF BUILDIN GS AN D STRUCTURES; (ii)
THE PLAN TIN G OF VEGETATION AN D THE IN STALLATION OF
SAN D FEN CIN G AN D DRAIN IN G; (iii) THE RE-SHAPIN G OF BLUFFS;
AN D (iv) THE FLOOD-PROOFIN G OF BUILDIN GS OR THEIR
ELEVATION ABOVE THE BASE FLOOD LEVEL.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
It is estimated that the existing structures have been in place since the late 1950's. Due to the age
and location of the existing structures, non-structural measures to protect the property from
flooding and erosion are not feasible. Future improvements to the property may include non-
structural measures such as elevating and flood proofing new buildings.
POLICY 18: TO
SAFEGUARD
THE
VITAL
ECON OMIC,
SOCIAL
AN D
EN VIRON MEN TAL IN TERESTS OF THE STATE AN D OF ITS
CITIZEN S, PROPOSED MAJOR ACTION S IN THE COASTAL AREA
MUST GIVE FULL CON SIDERATION TO THOSE IN TERESTS, AN D
TO THE SAFEGUARDS WHICH THE STATE HAS ESTABLISHED TO
PROTECT VALUABLE COASTAL RESOURCE AREAS.
The proposed work is not considered to be a major action, since it involves oversheeting of an
existing steel sheet pile bulkhead at an existing facility. The proposed work will allow the
current use of the site to be maintained, and is therefore is in the best interest of the State,
Village, and its Citizens. The work will be performed using best management practices and in
accordance with any applicable permit conditions, and is not anticipated to have any significant
environmental impact. Therefore the proposed work is compliant with this policy.
POLICY 19: PROTECT, MAIN TAIN , AN D IN CREASE THE LEVEL AN D TYPES OF
ACCESS TO PUBLIC WATER-RELATED RECREATION RESOURCES
AN D FACILITIES SO THAT THESE RESOURCES AN D FACILITIES
MAY BE FULLY UTILIZED IN ACCORDAN CE WITH REASON ABLY
AN TICIPATED
PUBLIC
RECREATION
N EEDS
AN D
THE
PROTECTION OF HISTORIC
AN D
N ATURAL
RESOURCES.
IN
PROVIDIN G SUCH ACCESS, PRIORITY WILL BE GIVEN TO PUBLIC
BEACHES,
BOATIN G
FACILITIES,
FISHIN G
AREAS
AN D
WATERFRON T PARKS.
The proposed project will protect and maintain the existing publicly owned property and its use
as a yacht club and marina. While the yacht club is private, many members of the local
community are members and utilize the club’s facilities for recreation. The proposed work is
consistent with this policy.
POLICY 20: ACCESS TO THE PUBLICLY-OWN ED FORESHORE AN D TO LAN DS
IMMEDIATELY ADJACEN T TO THE FORESHORE OR THE WATER'S
EDGE THAT ARE PUBLICLY-OWN ED SHALL BE PROVIDED AN D IT
SHOULD BE PROVIDED IN A MAN N ER COMPATIBLE WITH
ADJOIN IN G USES. SUCH LAN DS SHALL BE RETAIN ED IN PUBLIC
OWN ERSHIP.
The proposed project includes a 10 foot wide walkway immediately adjacent to the water's edge,
which is intended for public access along the Hudson River waterfront. This proposed walkway
will replace an existing, narrower walkway, and will be entirely compatible with existing
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
adjoining uses of the property, such as boating, by yacht club members. Therefore, the proposed
work is consistent with this policy.
RECREATION POLICIES
POLICY 21: WATER DEPEN DEN T AN D WATER EN HAN CED RECREATION WILL
BE EN COURAGED AN D FACILITATED, AN D WILL BE GIVEN
PRIORITY OVER N ON -WATER RELATED USES ALON GTHE COAST,
PROVIDED IT IS CON SISTEN T WITH THE PRESERVATION AN D
EN HAN CEMEN T OF OTHER COASTAL RESOURCES AN D TAKES
IN TO
ACCOUN T
DEMAN D
FOR
SUCH
FACILITIES.
IN
FACILITATIN G SUCH ACTIVITIES, PRIORITY SHALL BE GIVEN TO
AREAS WHERE ACCESS TO THE RECREATION OPPORTUN ITIES OF
THE COAST CAN BE PROVIDED BY N EW OR EXISTIN G PUBLIC
TRAN SPORTATION SERVICES AN D TO THOSE AREAS WHERE THE
USE OF THE SHORE IS SEVERELY RESTRICTED BY EXISTIN G
DEVELOMEN T.
The proposed project will encourage water-dependent and water-enhanced recreation by
maintaining the existing water-dependent use of the property as a yacht club and marina.
Therefore, the proposed work is consistent with this policy.
POLICY 22: DEVELOPMEN T WHEN LOCATED ADJACEN T TO THE SHORE WILL
PROVIDE FOR WATER-RELATED RECREATION , AS A MULTIPLE
USE, WHEN EVER SUCH RECREATION AL USE IS APPROPRIATE IN
LIGHT OF REASON ABLY AN TICIPATED DEMAN D FOR SUCH
ACTIVITIES
AN D
THE
PRIMARY
PURPOSE
OF
THE
DEVELOPMEN T.
Croton Yacht Club is a yacht club and marina. The proposed structures are intended to provide
continued protection the property and to provide access to the Hudson River so that water-related
recreation is allowed to continue. Therefore, the proposed work is consistent with this policy.
POLICY 23: PROTECT, EN HAN CE AN D RESTORE STRUCTURES, DISTRICTS,
AREAS OF SITES THAT ARE OF SIGN IFICAN CE IN THE HISTORY,
ARCHITECTURE, ARCHAEOLOGY OR CULTURE OF THE STATE,
ITS COMMUN ITIES, OR THE N ATION .
The project site is not located in an area of historic, archeologic, architectural, or cultural
significance. Therefore, this policy is not applicable.
POLICY 24: PREVEN T IMPAIRMEN T OF SCEN IC RESOURCES OF STATE WIDE
SIGN IFICAN CE AS IDEN TIFIED ON THE COASTAL AREA MAP.
IMPAIRMEN T
SHALL
IN CLUDE:
(i)
THE
IRREVERSIBLE
MODIFICATION OF GEOLOGIC FORMS, THE DESTRUCTION OR
REMOVAL OF VEGETATION , THE DESTRUCTION , OR REMOVAL
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
OF
STRUCTURES,
WHEN EVER
THE
GEOLOGIC
FORMS,
VEGETATION OR STRUCTURES ARE SIGN IFICAN T TO THE SCEN IC
QUALITY OF AN IDEN TIFIED RESOURCE; AN D (ii) THE ADDITION
OF STRUCTURES WHICH BECAUSE OF SITIN G OR SCALE WILL
REDUCE IDEN TIFIED VIEWS OR WHICH BECAUSE OF SCALE,
FORM, OR MATERIALS WILL DIMIN ISH THE SCEN IC QUALITY OF
AN IDEN TIFIED RESOURCE.
The proposed work will not impair any scenic resources. Therefore, this policy is not applicable.
POLICY 25: PROTECT, RESTORE OR EN HAN CE N ATURAL AN D MAN MADE
RESOURCES WHICH ARE N OT IDEN TIFIED AS BEIN G OF STATE
WIDE
SIGN IFICAN CE,
BUT
WHICH
CON TRIBUTE
TO
THE
OVERALL SCEN IC QUALITY OF THE COASTAL AREA.
Oversheeting the existing deteriorated steel sheet pile bulkhead will improve the appearance of
the shoreline. Therefore, the proposed work is in compliance with this policy.
POLICY 26: THE STATE COASTAL POLICY REGARDIN G THE PROTECTION OF
AGRICULTURAL LAN DS IS N OT APPLICABLE TO CROTON .
Not applicable.
POLICY 27: DECISION S ON THE SITIN G AN D CON STRUCTION OF MAJOR
EN ERGY FACILITIES IN THE COASTAL AREA WILL BE BASED ON
PUBLIC EN ERGY N EEDS, COMPATIBILITY OF SUCH FACILITIES
WITH THE EN VIRON MEN T, AN D THE FACILITY'S N EED FOR A
SHOREFRON T LOCATION .
The proposed work does not involve an energy facility. Therefore, this policy is not applicable.
POLICY 28: ICE
MAN AGEMEN T
PRACTICES
SHALL
N OT
DAMAGE
SIGN IFICAN T FISH AN D WILDLIFE AN D THEIR HABITATS,
IN CREASE SHORELIN E EROSION OR FLOODIN G, OR IN TERFERE
WITH THE PRODUCTION OF HYDROELECTRIC POWER.
The proposed work does not include ice management practices. Therefore, this policy is not
applicable.
POLICY 29: THE STATE COASTAL POLICY REGARDIN G THE DEVELOPMEN T
OF EN ERGY RESOURCES IS N OT APPLICABLE TO CROTON .
Not applicable.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
WATER AN D AIR RESOURCES POLICIES
POLICY 30: MUN ICIPAL, IN DUSTRIAL, AN D COMMERCIAL DISCHARGE OF
POLLUTAN TS, IN CLUDIN G BUT N OT LIMITED TO, TOXIC AN D
HAZARDOUS
SUBSTAN CES,
IN TO
COASTAL
WATERS
WILL
CON FORM
TO
STATE
AN D
N ATION AL
WATER
QUALITY
STAN DARDS.
No discharge of pollutants into coastal waters is anticipated to result from the proposed activity.
The proposed work involves driving steel sheet pile 18 inches outboard of the existing steel sheet
pile bulkhead and filling the void between the existing and new steel sheet pile bulkhead with
lightweight concrete fill. The fill will be isolated from coastal waters since it will be contained
behind the new steel sheet pile bulkhead. Therefore the proposed work is in compliance with this
policy.
POLICY 31: STATE COASTAL AREA POLICIES AN D PURPOSES OF APPROVED
LOCAL WATERFRON T REVITALIZATION PROGRAMS WILL BE
CON SIDERED
WHILE
REVIEWIN G
COASTAL
WATER
CLASSIFICATION S AN D WHILE MODIFYIN G WATER QUALITY
STAN DARDS; HOWEVER, THOSE WATERS ALREADY OVER-
BURDEN ED WITH CON TAMIN AN TS WILL BE RECOGN IZED AS
BEIN G A DEVELOPMEN T CON STRAIN T.
The proposed work is entirely compliant with State and Village of Croton-on-Hudson Coastal
Policies and LWRP.
POLICY 32: EN COURAGE THE USE OF ALTERN ATIVE OR IN N OVATIVE
SAN ITARY WASTE SYSTEMS IN SMALL COMMUN ITIES WHERE
THE COSTS OF CON VEN TION AL FACILITIES ARE UN REASON ABLY
HIGH, GIVEN THE SIZE OF THE EXISTIN G TAX BASE OF THESE
COMMUN ITIES.
The proposed work involves maintenance of shoreline erosion protection structures at an existing
yacht club and marina. The existing sanitary waste system will be maintained. Therefore the
proposed work is in compliance with this policy.
POLICY 33: BEST MAN AGEMEN T PRACTICES WILL BE USED TO EN SURE THE
CON TROL OF STORMWATER RUN OFF AN D COMBIN ED SEWER
OVERFLOWS DRAIN IN G IN TO COASTAL WATERS.
The proposed work does not involve any stormwater or sewage outfalls. The new bulkhead is
proposed to be constructed such that the top of new bulkhead elevation will be 3 feet above
existing and proposed grade elevation. The increased elevation of the top of the bulkhead will
afford some additional protection from flooding to the upland property. The above-grade portion
of the bulkhead will have scuppers at 20 feet on-center, in order to allow drainage of surface
water from the upland to the Hudson River, as it currently exists. Therefore, the proposed work
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
will not significantly alter drainage, flow patterns, or surface water runoff, and is compliance
with this policy.
POLICY 34: DISCHARGE OF WASTE IN TO COASTAL WATERS FROM VESSELS
WILL BE LIMITED SO AS TO PROTECT SIGN IFICAN T FISH AN D
WILDLIFE HABITATS, RECREATION AL AREAS AN D WATER
SUPPLY AREAS.
The proposed work is intended to replace shoreline erosion control structures at the project site
so that its current use as a yacht club and marina can be maintained. The Croton Yacht Club
intends to maintain its existing facilities and control measures which limit the discharge of waste
into coastal waters from vessels. Therefore the proposed work is in compliance with this policy.
POLICY 35: DREDGIN G AN D DREDGE SPOIL DISPOSAL IN COASTAL WATERS
WILL BE UN DERTAKEN IN A MAN N ER THAT MEETS EXISTIN G
STATE DREDGIN G PERMIT REQUIREMEN TS, AN D PROTECTS
SIGN IFICAN T
FISH
AN D
WILDLIFE
HABITATS,
SCEN IC
RESOURCES, N ATURAL PROTECTIVE FEATURES, IMPORTAN T
AGRICULTURAL LAN DS, AN D WETLAN DS.
The proposed work involves backfilling with lightweight concrete fill between the existing and
proposed steel sheet pile bulkheads. The total amount of backfill to be used in the project is
approximately 340.5 cubic yards, with approximately 295 cubic yards of backfill below the plane
of spring high tide. The concrete fill will be delivered to the site by a ready mix concrete truck and
placed by chute in a flowable condition, directly into the cavity to be filled, or into a pump for final
placement. The concrete will fill the void between the existing and proposed steel sheet pile
bulkheads, from the mudline up to the existing grade elevation. There will be no fill placed directly
into coastal waters, as it will all be contained behind the bulkhead; therefore, the proposed
placement of fill is not anticipated to have an adverse impact on water quality, fish and wildlife
habitats, or other important coastal resources. The applicant will comply with any State or
Federally issued permit requirements.
POLICY 36: ACTIVITIES RELATED TO THE SHIPMEN T AN D STORAGE OF
PETROLEUM AN D OTHER HAZARDOUS MATERIALS WILL BE
CON DUCTED IN A MAN N ER THAT WILL PREVEN T OR AT LEAST
MIN IMIZE SPILLS IN TO COASTAL WATERS; ALL PRACTICABLE
EFFORTS WILL BE UN DERTAKEN TO EXPEDITE THE CLEAN UP OF
SUCH DISCHARGES; AN D RESTITUTION FOR DAMAGES WILL BE
REQUIRED WHEN THESE SPILLS OCCUR.
The current use of the site and the proposed work do not involve any shipment or storage of
petroleum or other hazardous materials. Therefore, this policy is not applicable.
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
POLICY 37: BEST
MAN AGEMEN T
PRACTICES
WILL
BE
UTILIZED
TO
MIN IMIZE THE N ON -POIN T DISCHARGE OF EXCESS N UTRIEN TS,
ORGAN ICS AN D ERODED SOILS IN TO COASTAL WATERS.
The proposed work involves oversheeting an existing deteriorated steel sheet pile bulkhead. The
new steel sheet pile bulkhead will provide continued erosion protection to the site. No adverse
impacts or discharge of excess nutrients or organics are anticipated. Therefore, the proposed
work is in compliance with this policy.
POLICY 38: THE QUALITY AN D QUAN TITY OF SURFACE WATER AN D GROUN D
WATER SUPPLIES, WILL BE CON SERVED AN D PROTECTED,
PARTICULARLY WHERE SUCH WATERS CON STITUTE
THE
PRIMARY OR SOLE SOURCE OF WATER SUPPLY.
The proposed work will have no effect on the quality or quantity of surface or groundwater
supplies. Therefore, this policy is not applicable.
POLICY 39: THE TRAN SPORT, STORAGE, TREATMEN T AN D DISPOSAL OF
SOLID WASTES, PARTICULARLY HAZARDOUS WASTES, WITHIN
COASTAL AREAS WILL BE CON DUCTED IN SUCH A MAN N ER SO AS
TO PROTECT GROUN DWATER AN D SURFACE WATER SUPPLIES,
SIGN IFICAN T FISH AN D WILDLIFE HABITATS, RECREATION
AREAS,
IMPORTAN T
AGRICULTURAL
LAN DS
AN D
SCEN IC
RESOURCES.
The proposed work does not involve transport, storage, treatment, or disposal of solid or
hazardous wastes. Therefore, this policy is not applicable.
POLICY 40: EFFLUEN T
DISCHARGED
FROM
MAJOR
STEAM
ELECTRIC
GEN ERATIN G AN D IN DUSTRIAL FACILITIES IN TO COASTAL
WATERS WILL N OT BE UN DULY IN JURIOUS TO FISH AN D
WILDLIFE AN D SHALL CON FORM TO STATE WATER QUALITY
STAN DARDS.
The proposed site is not an electric generating or industrial facility. Therefore, this policy is not
applicable.
POLICY 41: LAN D USE OR DEVELOPMEN T IN THE COASTAL AREA WILL N OT
CAUSE N ATION AL OR STATE AIR QUALITY STAN DARDS TO BE
VIOLATED.
The proposed work is not anticipated to have a significant effect on air quality. Therefore, this
policy is not applicable.
POLICY 42: COASTAL MAN AGEMEN T POLICIES WILL BE CON SIDERED IF THE
STATE
RECLASSIFIES
LAN D
AREAS
PURSUAN T
TO
THE
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
PREVEN TION OF SIGN IFICAN T DETERIORATION REGULATION S
OF THE FEDERAL CLEAN AIR ACT.
The proposed work is entirely compliant with State and Village of Croton-on-Hudson Coastal
Policies and LWRP.
POLICY 43: LAN D USE OR DEVELOPMEN T IN THE COASTAL AREA MUST N OT
CAUSE THE GEN ERATION OF SIGN IFICAN T AMOUN TS OF THE
ACID RAIN PRECURSORS: N ITRATES AN D SULFATES.
The proposed work involves oversheeting an existing steel sheet pile bulkhead and is not
anticipated to generate any nitrates and sulfates. Therefore, this policy is not applicable.
WETLAN DS POLICY
POLICY 44: PRESERVE AN D PROTECT TIDAL AN D FRESHWATER WETLAN DS
AN D PRESERVE THE BEN EFITS DERIVED FROM THESE AREAS
By definition, all lands surrounding the coastal waters of New York are considered tidal
wetlands. Therefore, by definition, the proposed activity will be located in an area of Tidal
Wetlands. The impact of the proposed structures on the natural environment will be minimized
through proper planning and design, replacing damaged erosion control structures with steel
sheet pile bulkhead oversheeting.
NYSDEC & USACE Joint Permit Application
Village of Croton-on-Hudson
Croton Yacht Club - Bulkhead Replacement
October 2011
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
ATTACHMEN T 11
N EW YORK STATE
DEPARTMEN T OF EN VIRON MEN TAL CON SERVATION
&
UN ITED STATES ARMY CORPS OF EN GIN EERS
ADJACEN T PROPERTY OWN ERS
CROTON YACHT CLUB - BULKHEAD REPLACEMEN T
CROTON -ON -HUDSON
N EW YORK
NYSDEC & USACE Joint Permit Application
October 2011
Croton Yacht Club - Bulkhead Replacement
OCEAN AND COASTAL CONSULTANTS ENGINEERING, P.C.
PROPERTY OWN ERS
Reference:
Village of Croton-on-Hudson Town Hall
Research Date:
September 2011
APPLICAN T
The applicant, Village of Croton-on-Hudson, is the property owner. The property is leased by the
Croton Yacht Club.
Property Designation
(Section-Block-Lot)
Property Owner
Designated Use
78.01-1-3
Village of Croton-on-Hudson
Yacht Club, Marina
ABUTTERS (FROM N ORTH TO SOUTH)
Property Designation
(Section-Block-Lot)
Property Owner
Designated Use
78.08-1-1
Village of Croton-on-Hudson
Croton Landing Park
78.12-1-1
Village of Croton-on-Hudson
Senasqua Park (Village
Park)