CAF 7-8-11 2
resolution
9 pages
Meeting: portal event 724 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Type II
Resolution, 9 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Type II”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
EAF 7-7-11
EAF attach 7-7-11-redlined
Memo to VB on Supplementing List of Type II Actions
PB memo to VB
Resolution recirculating revised law CAF and EAF-Type II
Revised Local Law Type II clean version
Revised Local Law Type II redlined version
Revised Planning Board Resolution clean version
Revised Planning Board Resolution redlined
TypeII-VillEngineer
Type II-PolChief
Type II actions prelim consistency 4-27-11 DRAFT
Extracted text
COASTAL ASSESSMEN T FORM
A. IN STRUCTION S (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
B. DESCRIPTION OF SITE AN D PROPOSED ACTION : N OT APPLICABLE,
EXCEPT WHERE AN SWERED – SEE ATTACHMEN T
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction): Adoption of additional Type II actions
b) Financial assistance (e.g. grant, loan, subsidy): ______________________________
c) Permit, approval, license, certification: _____________________________________
d) Agency undertaking action: Village Board of Trustees, Zoning Board of Appeals,
Planning Board, Village Engineer and Police Chief of Village of Croton-on-
Hudson
2. Describe nature and extent of action: Adoption of additional Type II actions pursuant
to the N ew York State Environmental Quality Review Act
3. Location of actions: _______________________________________________________
(street or site description)
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations:
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
NO X
YES ______
If yes, which state or federal agency?___________________________
C. COASTAL ASSESSMEN T:
(Check either "yes" or "no" for each of the following questions)
YES NO
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon any of the resource
areas identified on the coastal area map: N OT APPLICABLE – SEE ATTACHMEN T
a) Significant fish or wildlife habitats?
_____ _____
b) Scenic resources of local or statewide significance?
_____ _____
c) Important agricultural lands?
_____ _____
d) Natural protective features in an erosion hazard area?
_____ _____
If the answer to any question above is "yes", please explain in Section D any measures which
will be undertaken to mitigate any adverse effects.
YES
NO
2.
Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ X
b) Scenic quality of the coastal environment?
_____ X
c) Development of future or existing water dependent uses?
_____ X
d) Operation of the State's major ports?
_____ X
e) Land or water uses within a small harbor area?
_____ X
f) Stability of the shoreline?
_____ X
g) Surface or groundwater quality?
_____ X
h) Existing or potential public recreation opportunities?
_____ X
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
_____ X
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
_____ X
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
_____ X
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
_____ X
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
_____ X
e) Mining, excavation, filling or dredging in coastal waters?
_____ X
f) Reduction of existing or potential public access to or along
the shore?
_____ X
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
_____ X
h) Development within a designated flood or erosion hazard area? _____ X
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
_____ X
j) Construction or reconstruction of erosion protective structures? _____ X
k) Diminished surface or groundwater quality?
_____ X
l) Removal of ground cover from the site?
_____ X
4. Project N OT APPLICABLE – SEE ATTACHMEN T
a) If project is to be located adjacent to shore:
YES NO
1. Will water-related recreation be provided?
_____ _____
2. Will public access to the foreshore be provided?
_____ _____
3. Does the project require a waterfront site?
_____ _____
4. Does it supplant a recreational or maritime use?
_____ _____
5. Do essential public services and facilities presently exist at
or near the site?
_____ _____
6. Is it located in a flood prone area?
_____ _____
7. Is it located in an area of high erosion?
_____ _____
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and types of public access to water-related recreation
resources and facilities?
_____ _____
2. If located in the foreshore, will access to those and
adjacent lands be provided?
_____ _____
3. Will it involve the siting and construction of major energy
facilities?
_____ _____
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
_____ _____
c) Is the project site presently used by the community neighborhood
an open space or recreation area?
_____ _____
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
_____ _____
e) Is the project site presently used for commercial fishing or fish
processing?
_____ _____
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
_____ _____
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
_____ _____
h) Will the project involve any waste discharges into coastal waters? _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
_____ _____
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
_____ _____
k) Does the project involve shipment or storage of petroleum
products?
_____ _____
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
_____ _____
m) Does the project involve or change existing ice management
practices?
_____ _____
n) Will the project affect any area designated as a tidal or
freshwater wetland?
_____ _____
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
_____ _____
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
_____ _____
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
_____ _____
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
_____ _____
D. REMARKS OR ADDITION AL IN FORMATION .
For questions answered “yes” in Section C, explain methods you will undertake to reduce
adverse effects. Review the LWRP to see if the project is consistent with each policy. List
policies the project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
N OT APPLICABLE
E. SUBMISSION REQUIREMEN TS.
The final version of this form shall be sent to the Department of State (N ew York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, N Y 12231) if any
question in Section C is answered “yes” and either of the following conditions is met.
• Section B.1 (a) or B.1 (b) is checked OR
• Section B.1 (c) and B.11 is answered “yes”
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Preparer’s Name: David H. Stolman, AICP, PP
Title: President
Agency: Frederick P. Clark Associates, Inc.
Telephone No.: (914) 967-6540 E-mail: dstolman@fpclark.com
Date: July 8, 2011
J:\DOCS2\100\Croton\Type II\CAF 7-8-11.dhs.doc
ATTACHMEN T
COASTAL ASSESSMEN T FORM
ADOPTION OF ADDITION AL TYPE II ACTION S
BY THE VILLAGE BOARD OF TRUSTEES, ZON IN G BOARD
OF APPEALS, PLAN N IN G BOARD, VILLAGE EN GIN EER AN D
POLICE CHIEF OF THE VILLAGE OF CROTON -ON -HUDSON
The Proposed Action consists of the adoption of additional Type II actions by the Village
Board of Trustees, the Zoning Board of Appeals, the Planning Board, the Village
Engineer and the Police Chief of the Village of Croton-on-Hudson pursuant to the State
Environmental Quality Review Law. Type II actions are those which are not subject to
review under Part 617 because they have been determined not to have a significant
adverse impact upon the environment (or are other wise precluded from environmental
review under Environmental Conservation Law, article 8.) The Proposed Action does not
directly involve site-specific construction or development activity.
The following are the additional proposed Type II actions (in bold) and the informational
details as to why there will be no significant adverse impact upon the environment in
adopting these Type II actions.
A.
Granting by the Village Board of a Special Permit (including the allowable
waiving of any requirements) for the construction, expansion or use of a primary
or accessory/appurtenant, structure or facility involving less than 4,000 square feet
of gross floor area and less than 10,000 square feet of land disturbance and not
involving a change in zoning or a use variance and consistent with local land use
controls, but not radio communication or microwave transmission facilities nor
other
structures
related
to
radio,
television,
telephone
or
data
transmission/reception.
B.
A decision on the request for an extension of the expiration date for: a special
permit by the Village Board of Trustees or the Zoning Board of Appeals; an area
variance by the Zoning Board of Appeals; and site plan or minor site plan approval
by the Planning Board.
C.
The approval of a Storm Water Pollution Prevention Plan (SWPPP) under Chapter
196 of the Village Code in connection with any Type II action by the Village
Board of Trustees, the Zoning Board of Appeals or the Planning Board.
D.
The approval of a Tree Removal Permit under Chapter 208 of the Village Code in
connection with any Type II action by the Village Board of Trustees or the
Planning Board.
E.
A decision by the Zoning Board of Appeals on an interpretation of the Zoning
Code or an appeal of an administrative decision, except an appeal for a variance
which is not otherwise made a Type II action hereunder or by State law/regulation.
Accordingly, ZBA variances which are not made Type II actions by another
paragraph hereof, or by State law or regulation, are not intended to be made Type
II actions by this paragraph.
F.
Sign Permit issued under Chapter 230 of the Village Code by the Planning Board
or Village Engineer.
G.
Granting of Site Plan or Minor Site Plan Approval (including the allowable
waiving of any requirements) by the Planning Board for the construction or
expansion of a primary or accessory/appurtenant, structure or facility involving
less than 4,000 square feet of gross floor area and less than 10,000 square feet of
land disturbance and not involving a change in zoning or a use variance and
consistent with local land use controls, but not radio communication or microwave
transmission facilities nor other structures related to radio, television, telephone or
data transmission/reception.
H.
The granting of Minor Site Plan Approval (including the allowable waiving of any
requirements), not requiring a Wetland or Steep Slope permit, by the Planning
Board for the construction or expansion of a single-family, or a two-family
residence on an existing lot including provision of necessary utility connections
and the installation, maintenance and/or upgrade of a drinking water well and a
septic system.
I.
The approval of an Excavation and Filling Permit by the Planning Board under
Chapter 120 of the Village Code in connection with any Type II action.
J.
Wetlands Permit issued by the Village Engineer under Chapter 227 of the Village
Code.
K.
Steep Slope Permit issued by the Village Engineer under Chapter 195 of the
Village Code.
L.
Fill or Excavation Permit issued by the Village Engineer under Chapter 120 of the
Village Code.
M.
Minor Land Disturbance Activity or Storm Water Pollution Prevention Plan
approvals issued by the Stormwater Management Officer (SMO) under Chapter
196 of the Village Code.
N.
Tree Removal Permit issued by the Village Engineer under Chapter 208 of the
Village Code
O.
Permit for Improvement in the Street Line or Street Use Approval Issued by the
Village Engineer under Chapter 197 of the Village Code
P.
Blasting Permit issued by the Village Engineer under Chapter 81 of the Village
Code.
Q.
Public Display of Fireworks Permit issued by the Police Chief under Chapter 127
of the Village Code.
R.
Minor improvements by the Village designed or intended to correct localized
water, sewer, or drainage problems alone or in conjunction with street resurfacing
projects.
S.
Seasonal salting and/or sanding of roads, sidewalks, and parking lots.
J:\DOCS2\100\Croton\Type II\CAF attach 7-8-11.dhs.doc:ev
Machine-extracted for search and reference — the original PDF is the authoritative version.