EGIEERS OFFICE
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street, 2nd floor
Croton-on-Hudson, NY 10520-2501
MEMORADUM
To:
Abe Zambrano, Village Manager
From: Daniel O’Connor, Village Engineer
Mayor
Leo A.W. Wiegman
Trustees
Ann H. Gallelli
Ian W. Murtaugh
Casey Raskob
Gregory Schmidt
Village Manager
Abraham Zambrano
Assistant Village Manager
Janine King
Village Treasurer
Sandra Bullock
Village Engineer/Building Inspector
Daniel O’Connor, P.E.
Asst. Building Inspector/Assessor
Joseph Sperber
Fire Inspector
Peter Anfiteatro
Date: June 8, 2011
Re:
7 Ackerman Court
Sec. 67.20 Block 3 Lot 34.03
Request for Building Permit Extension – Permit #20090001
We have received a request for an extension of the above-referenced building permit for a new
single family residence.
Due to the extenuating circumstances that are described in the attached letter, the property owner
Brian Fitzpatrick and his contractor were unable to complete the work under this building permit
by the expiration date of January 5, 2011.
The attached letter from the architect indicates that the work is expected to be completed by the
first week of July. Based on this anticipated completion date, it is recommended that the
Building Permit be extended seven months until August 5, 2011.
It should also be noted that the neighbor directly across the street has complained a few times
about the condition of the property and also about the length of time that the construction has
been ongoing. It is therefore recommended that the extension of the permit be conditioned on all
exterior work on the house and site being completed by August 5, 2011, with the exception of
landscaping and paving of the driveway. No further extensions of the building permit should be
granted without the above noted exterior work being completed by August 5, 2011.
Please put this request for an extension on the Village Board agenda for Monday, June 20, 2011.