Croton Point CAF rev 20240917
document
6 pages
Meeting: portal event 984 (no meeting page on file)
Agenda item: Referral from Village Board for a Local Waterfront Revitalization Program (LWRP) Consistency Review for a proposed 100-unit residential building located at 1-3 Croton Point Avenue and Parking Lot A (79.17-1-3,4,5)
Document, 6 pages. Attached to agenda item: “Referral from Village Board for a Local Waterfront Revitalization Program (LWRP) Consistency Review for a proposed 100-unit residential building located at 1-3 Croton Point Avenue and Parking Lot A (79.17-1-3,4,5)”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1CrotonPoint LWRP 20240917
1CrotonPoint Part1EAF rev 20240717
2024-07-11 Croton Point Village Submission Full Set SS
2024-09-03T17-10-25 24PR07889 effect finding no impact
240906 1CrotonPoint VisualAnalysis low
LWRP 2024 Updated2
SWPPP24154 071124
Visual Analysis Cross Section CS-1 SS
WBP Croton Point updated architectural drawings with...
wer24154 071124 REV
wwer24154 071124 REV
Extracted text
A. INSTRUCTIONS (Please print or type all answers)
1.
Applicants, or in the case of direct actions (city, town, village) agencies, shall complete this CAF for
proposed actions which are subject to the consistency review law. This assessment is intended to supplement other
information used by a (city, town, village) agency in making a determination of consistency.
2.
Before answering the questions in Section C, the preparer of this form should review the policies and
explanations of policy contained in the Local Waterfront Revitalization Program (LWRP), a copy of which is on file
in the (city, town, village) clerk's office. A proposed action should be evaluated as to its significant beneficial and
adverse effects upon the coastal area.
3.
If any question in Section C on this form is answered "yes", then the proposed action may affect the
achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, the action
should be analyzed in more detail and, if necessary, modified prior to making a determination that it is consistent to
the maximum extent practicable with the LWRP policy standards and conditions. If an action cannot be certified as
consistent with the LWRP policy standards and conditions, it shall not be undertaken.
1. Type of (city, town, village) agency action (check appropriate response):
a) Directly undertaken (e.g. capital construction, planning activity, agency
regulation, land transaction) _____________________________________________
b) Financial assistance (e.g. grant, loan, subsidy) ______________________________
c) Permit, approval, license, certification _____________________________________
d) Agency undertaking action ______________________________________________
2. Describe nature and extent of action: _________________________________________
3. Location of actions: _______________________________________________________
(street or site description)
Financial assistance by NYSHCR and Westchester County
Village Special Use Permit and Site Plan Approvals
Croton-on-Hudson Village Board of Trustees and Planning Board
1 Croton Point Avenue, just north of the Croton Point Avenue and Veterans Plaza intersection
WBP Development, LLC has been selected by the Village as the purchaser and developer of Village
Parking Lot A (Tax Lots 3 and 5) and is in contract to purchase Tax Lot 4 from Croton Point Realty,
Inc. Collectively, the property is proposed to be developed with a 5-story, 100 unit, affordable
multifamily building with amenity space and on-site parking; units are proposed to be in condominium
ownership and available to homebuyers at income levels up to 80% Area Median Income (AMI), with
some availability to homebuyers at income levels up to 100% AMI. The property is located within the
Collectively 1.7578 acres
Surface parking and 2-story commercial building (office)
Transit-Oriented Development in Light Industrial (LI) District (Section 230-18.c(9))
7. List and describe any unique or unusual land forms within or contiguous to the project
site (i.e. bluffs, dunes, swales, ground depressions, other geological formations):
8. Percent of site which contains slopes of 15% or greater: __________________________
9. List and describe streams, lakes, ponds or wetlands existing within or contiguous to the
project area. Give name and size of each if available:
a)
b)
10. If an application for the proposed action has been filed with the (city, town, village)
a)
b)
c)
d)
11. Will the action be directly undertaken, require funding or approval by a state or federal
agency?
If yes, which state or federal agency? ___________________________
12. If the proposed action is a law, or planning or zoning document, SKIP Section “C” and go to Section “E”.
YES
NO
N/A
1. Will the proposed action be located in, or contiguous to,
or have a potentially adverse effect upon any of the resource
areas identified on the coastal area map:
b) Scenic resources of local or statewide significance?
c) Natural protective features in an erosion hazard area?
If the answer to any question above is "yes", please explain in Section D any measures which will be
undertaken to mitigate any adverse effects.
*Section skipped as directed above
*Hudson River is +/-1,700 feet and the Croton Bay is +/- 880 feet from project site and both are separated by roads,
buildings and parking
None present - site is relatively flat and is developed with surface parking and a commercial building
None within the project area
None
None
WBP Development, LLC
480 Bedford Road, Chappaqua, NY 10514
610-3638
X
NYSHCR's Affordable Homeownership Opportunity Program (AHOP)
X
X
X
X
YES
NO
N/A
2. Will the proposed action have a significant effect upon:
a) Commercial or recreational use of fish and wildlife resources? _____ _____ _____
b) Scenic quality of the coastal environment?
c) Development of future or existing water dependent uses?
e) Land or water uses within a small harbor area?
i) Structures, sites or districts of historic, archeological or
cultural significance to the (city, town, village), State or
nation?
3. Will the proposed action involve or result in any of the following:
a) Physical alteration of land along the shoreline, land under
water or coastal waters?
b) Physical alteration of two (2) acres or more of land located
elsewhere in the coastal area?
c) Expansion of existing public services or infrastructure in
undeveloped or low density areas of the coastal area?
d) Energy facility not subject to Article VII or VIII of the
Public Service Law?
e) Mining, excavation, filling or dredging in coastal waters?
f) Reduction of existing or potential public access to or along
the shore?
g) Sale or change in use of publicly-owned lands located on
shoreline or under water?
h) Development within a designated flood or erosion hazard area? _____ _____ _____
i) Development on a beach, dune, barrier island or other natural
feature that provides protection against flooding or erosion?
j) Construction or reconstruction of erosion protective structures? _____ _____ _____
k) Diminished surface or groundwater quality?
l) Removal of ground cover from the site?
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4.
Project
YES
NO
N/A
a) If project is to be located adjacent to shore:
2. Will public access to the foreshore be provided?
3. Does the project require a waterfront site?
4. Does it supplant a recreational or maritime use?
5. Do essential public services and facilities presently exist at
or near the site?
6. Is it located in a flood prone area?
7. Is it located in an area of high erosion?
b) If the project site is publicly owned:
1. Will the project protect, maintain and/or increase the level
and industrial facilities into coastal facilities?
2. If located in the foreshore, will access to those and adjacent
lands be provided?
3. Will it involve the siting and construction of major energy
facilities?
4. Will it involve the discharge of effluent from major steam
electric generating and industrial facilities into coastal
facilities?
c) Is the project site presently used by the community neighborhood
as an open space or recreation area?
d) Does the present site offer or include scenic views or vistas
known to be important to the community?
e) Is the project site presently used for commercial fishing or fish
processing?
f) Will the surface area of any waterways or wetland area be
increased or decreased by the proposals?
g) Does any mature forest (over 100 years old) or other locally
important vegetation exist on this site which will be removed
by the project?
h) Will the project involve any waste discharges into coastal waters? _____ _____ _____
i) Does the project involve surface or subsurface liquid waste
disposal?
j) Does the project involve transport, storage, treatment or disposal
of solid waste or hazardous materials?
k) Does the project involve shipment or storage of petroleum
products?
* A portion of the site is owned by the Village and is in contract for sale to the applicant
*Connect to the existing municipal sewer system
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
4. Project (continued)
YES
NO
N/A
l) Does the project involve discharge of toxic hazardous
substances or other pollutants into coastal waters?
m) Does the project involve or change existing ice management
practices?
n) Will the project affect any area designated as a tidal or
freshwater wetland?
o) Will the project alter drainage flow, patterns or surface water
runoff on or from the site?
p) Will best management practices be utilized to control storm
water runoff into coastal waters?
q) Will the project utilize or affect the quality or quantity of sole
source or surface water supplies?
r) Will the project cause emissions which exceed federal or state
air quality standards or generate significant amounts of nitrates
or sulfates?
For questions answered “yes” in Section C, explain methods you will undertake to reduce adverse
effects. Review the LWRP to see if the project is consistent with each policy. List policies the
project is not consistent with and explain all mitigating actions.
(Add any additional sheets necessary to complete this form)
X
x
x
x
x
x
x
According to NYSDEC standards for assessing water demand, which are conservative,
the project will generate 16,940 gallons of wastewater per day. Connection to the
existing County sewer system will be made and no anticipated impacts to the sewer
system are anticipated. Note that the entire Village is located within the designated
coastal area. See memorandum from KSCJ Consulting, dated September 17, 2024,
which demonstrates the project's consistency with the applicable LWRP policies.
The final version of this form shall be sent to the Department of State (New York State Dept. of
State, Coastal Management Program, 162 Washington Avenue, Albany, NY 12231) if any question
in Section C is answered “yes” and either of the following conditions is met.
If assistance or further information is needed to complete this form, please contact the Village
Engineer at (914) 271-4783.
Jan K. Johannessen, RLA, AICP
Principal, KSCJ Consulting
273-2323
July 11, 2024; Revised 9/17/2024
jjohannessen@kscjconsulting.com
Machine-extracted for search and reference — the original PDF is the authoritative version.