Res 32-2021 Sewer Agreement
resolution
1 page
Meeting: portal event 745 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to sign the Sewer Connection Agreement with Ibrahim Jamal to connect the property located at 1216 Albany Post Road to the Village's sanitary sewer system.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to sign the Sewer Connection Agreement with Ibrahim Jamal to connect the property located at 1216 Albany Post Road to the Village's sanitary sewer system.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1216 Albany Post Road sewer use agreement FINAL
Extracted text
On motion of TRUSTEE____________, seconded by TRUSTEE _______, the
following resolution was adopted by the Board of Trustees of the Village of
Croton-on-Hudson, New York:
Resolution 32-2022
WHEREAS, Ibrahim Jamal, the property owner of 1216 Albany Post Road,
Croton-on-Hudson, is desirous of connecting to the sanitary sewer system; and
WHEREAS, a wastewater collection and pumping system will be installed on the
property that will connect to the Village’s sanitary sewer system force main and
then into the Ossining Sanitary Sewer system; and
WHEREAS, the parties wish to set forth their agreement as to the rights and
obligations of each of the parties with respect to the wastewater collection and
pumping system on said property,
NOW THEREFORE BE IT RESOLVED: that the Board of Trustees hereby
authorizes the Village Manager to sign the Sewer Connection Agreement with
Ibrahim Jamal to connect the property located at 1216 Albany Post Road to the
Village’s sanitary sewer system.
Dated: March 7, 2022
Machine-extracted for search and reference — the original PDF is the authoritative version.