2022-03-21 Westchester Power 2022- Croton.pptx
presentation
16 pages
Meeting: portal event 749 (no meeting page on file)
Agenda item: Presentation by Westchester Power on the Community Choice Aggregation Program Renewal
Presentation, 16 pages. Attached to agenda item: “Presentation by Westchester Power on the Community Choice Aggregation Program Renewal”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Extracted text
Westchester Power Program
2022 Path Forward
March 21, 2022
COMMUNITY SOLAR
COMMUNITY
ENERGY
ENERGYSMART HOMES
CLEAN TRANSPORTATION PROJECT
ELECTRIFICATION
SOLUTIONS
ZERO
WASTE
WESTCHESTER POWER
SUSTAINABLE WESTCHESTER
GRID
EFFICIENCY
SUSTAINABLE
LANDSCAPING
GRID REWARDS™
RECYCLE RIGHT APP
LAND CARE AND ELECTRIC CONVERSION
Shared services for a cleaner, greener Westchester
GETTING READY FOR OPT-OUT COMMUNITY
SOLAR CREDITS
• Sustainable Westchester is preparing to launch an exciting, new Solar Credit offering within the Westchester Power program that
will provide guaranteed savings to participating households and small businesses.
• The offering prioritizes the delivery of the Solar Credit savings to low- to moderate-income households. We will start with those
enrolled in the existing utility’s low-income assistance program, i.e. Assistance Program Participants.
• Your first step is to amend your local CCA enabling law to add the Solar Credit to accompany the Supply offering. We have
prepared a template of the enabling law for you. Look out for our email!
• For more information, please contact Leo Wiegman, Director of Solar Programs, at leo@sustainablewestchester.org.
Municipalities 147,000
Residents and
Small Businesses
ELECTRICITY GENERATION (SUPPLY) AND DELIVERY
SOURCE (SUPPLY)
WESTCHESTER
POWER
contracts and administers
electricity supply
Adapted from original Lean Energy image
DELIVERY
CON EDISON
delivers energy, maintains lines,
bills customers
CUSTOMER
YOU
have energy choice, support
clean energy
ELECTRIC INDUSTRY NEED-TO-KNOW
OPT-OUT FORMAT – COMMUNITY DEFAULT
• There is always a default supply (Con Edison is an opt-out format also)
• Communities that participate in the Westchester Power program have the decision
about that default supply brought into the community
• Program is approved as an alternative to confusing ESCO offerings
• Cost-effective means of bringing more renewable energy to the community
• Opt-out structure ensures that we are able to fully leverage the buying clout of all
participating municipalities
METRIC TONS OF
CO2 MITIGATED
CARS TAKEN OFF
THE ROAD FOR 1 YEAR
TREE SEEDLINGS
FOR 10 YEARS
=
or
X
County-wide
1,100,000
293,000
18.2 million
WESTCHESTER IS MAKING A HUGE IMPACT!
Croton
13,300
2,913
221,482
RATES / SUPPLY OPTIONS / TERMS
• Current Westchester Power rates residents in Con Ed territory are fixed through June 30, 2022:
• 100% Renewable Supply = 7.41 cents/kWh
• Standard Supply = 6.75 cents/kWh
• Since Con Ed rates are variable month to month and we cannot know what they will be in the future,
the program cannot guarantee savings
• Remember though Con Ed is “mixed supply” that includes fossil fuels, not 100% renewable energy
so comparing the two is a little “apples to oranges”
• Consumer-friendly: opt-out, opt-back in, or switch supplies at any time – fixed rate serves as a cap
RATES TO-DATE
Current Contract Rate Performance
1/1/2021 thru 2/28/2022
Estimated Avg. Charges by Supply
Customer Type
Avg. Monthly
Account Use
Con Edison
WP 100%
Renewable
WP Standard
Residential
615 kWh
$684
$634
$577
Small
Commercial
719 kWh
$771
$714
$649
2022 – WESTCHESTER POWER 2.0, EVOLUTIONARY IMPERATIVES
• Increasing the supplier pool for enhanced
competition
• Building capacity to support longer term contracts
and more flexible supply formats
• Which in turn can lead to long term price stability
and more renewable construction
Expanding Westchester Power capacity for environmental and economic impact
EXPANDED SUPPLIER OPTIONS
In CCA 2.0, services
provided to “sleeve”
wholesale energy supply
makes it look just like
our normal ESCO
contract.
In NYS, relationship with retail
customer is either through
utility, or authorized ESCO
WP 1.0
AUCTION DAY – BOTH RETAIL AND WHOLESALE
• We will run traditional full retail ESCO
auctions and auction for wholesale
energy block on the same day.
• We will then be able to add the
known sleeving service cost to the
wholesale block and compare to the
retail ESCO offers and select the best.
RECOMMENDATION: CONTRACT EXTENSION
• Additional time to organize enhanced auction
• Modified RFP, Sleeving arrangement
• Seeking to move beyond current
high risk & uncertainty premiums
• Up to six months (5 looks best now)
• Market price will be significantly higher
than current contract
TIMELINE / NEXT STEPS
Contract Extension (looking for 5 months)
• Mid April: Contract signing (immediately after all
MOU’s executed)
• Mid April thru Mid May: Prep, Opt-out mailing
• Mid June: end of opt-out period
• July 1: Participants in new extension as of their
meter read date
New Contract Auction via Enhanced Format
• Mid-August: Participation MOUs signed off
• Late August: Auction
• Early September: Contract signing (immediately
after auction award)
• Mid September thru Mid October: Prep, Opt-out
mailing
• Mid November: end of opt-out period
• December 1: Participants in new extension as of
their meter read date
• 3/30 11AM Chief Electeds/Admins mtg to
confirm MOU target price
• Early/Mid April: Participation MOU authorized
by boards and signed
Questions?
Sustainable Westchester General
info@sustainablewestchester.org
Westchester Power
westchesterpower@sustainablewestchester.org
Call us at 914-242-4725
Your action can help your community
build a clean energy future!
Machine-extracted for search and reference — the original PDF is the authoritative version.