Croton Zoning AKRF Traffic Study Proposal rev 3-21-22
resolution
10 pages
Meeting: portal event 756 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $19,450 for additional services being provided by AKRF for the South Riverside Area Zoning Study.
Resolution, 10 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $19,450 for additional services being provided by AKRF for the South Riverside Area Zoning Study.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Res 43-2022 AKRF Proposal
Extracted text
Environmental, Planning, and Engineering Consultants
34 South Broadway
Suite 300
White Plains, NY 10601
tel: 914 949-7336
fax: 929 284-1085
www.akrf.com
Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut
March 21, 2022
Mr. Bryan Healy
Village Manager
Village of Croton on Hudson
1 Van Wyck Street
Croton on Hudson, NY 10520
Email: bhealy@crotononhudson-ny.gov
Re:
Extra Work Authorization for PO #2200075 (Croton Zoning Study – Traffic)
Dear Mr. Healy:
AKRF, Inc. (“AKRF” or the “Consultant”) is pleased to present this proposal to the Village of Croton-on-
Hudson (“the Village” or the “Client”) to prepare a Traffic Impact Study (TIS) related to the theoretical
maximum buildout projected under the proposed Harmon/South Riverside Gateway (HSRG) Overlay and
Light Industrial (LI) District zoning amendments. For reference, Scenario B of the Traffic task in AKRF’s
contract dated June 16, 2021, noted the potential for a quantified traffic analysis to satisfy State
Environmental Quality Review (SEQR) requirements should the increase in traffic resulting from the
theoretical maximum buildout generate 100 or more vehicle trips during the weekday peak hours.
The preliminary trip generation numbers (summarized in the attached February 25, 2022 memorandum),
indicated the incremental trip generation numbers associated with the theoretical maximum buildout
exceeded the 100 vehicle-trip threshold for any given peak hour. Therefore, this proposal has been prepared
seeking authorization to perform a quantified traffic analysis. It is noted that it is unlikely the entirety of
the Project Area would be fully redeveloped under the parameters of the proposed zoning amendments.
Nevertheless, the quantified analysis would support the requisite “hard look” necessary to assess the
potential for traffic impacts under SEQR as assumed through the conservative buildout calculations.
The Scope of Work for the Traffic Impact Study (“TIS”) is presented below.
TASK 1: DATA COLLECTION
Turning Movement Counts (TMCs) and Vehicle Classification Counts (VCC) would be collected at the
following locations for the weekday AM (6:30 to 9:30 AM) and PM (4:00 to 6:00 PM) periods:
1. Croton Point Ave. and Veterans Plaza (TMC)
2. Croton Point Ave. and Rt. 9/9A Southbound Ramps (TMC/VCC)
3. Croton Point Ave. and Rt. 9/9A Northbound Ramps (TMC/VCC)
4. Croton Point Ave. and S. Riverside Ave. (TMC/VCC)
Mr. Bryan Healy
March 21, 2022
5. S. Riverside Ave. and Benedict Blvd. (TMC)
6. S. Riverside Ave. and Clifton St. (TMC)
Roadway characteristics would be observed including travel lanes by direction, pavement markings,
pavement widths, traffic control devices (e.g. signals, stop signs).
Traffic signal timing plans for the signalized intersections would be obtained from NYSDOT or the
appropriate agency.
TASK 2: TRAFFIC IMPACT STUDY (TIS)
Prior to the commencement of the preparation of the TIS, AKRF would conduct a preliminary screening
analysis to estimate the likelihood of traffic impacts occurring at of any of the intersections proposed for
analysis. This screening would be based on an assessment of the collected traffic volumes and proposed
trip assignments. Based on the results of this screening, the number of intersections analyzed as part of the
TIS may be reduced, thereby potentially reducing the cost of the TIS outlined below. The scope of work
and cost for the TIS outlined below assumes that none of the counted intersections would screen-out and
represents the maximum effort/cost for the TIS. In the event one or more intersections screen-out, the effort
and cost outlined below would be reduced.
AKRF would complete capacity analyses for six intersections (identified in Task 1) for the Existing and
Build Conditions1 (i.e., at maximum theoretical buildout under the proposed zoning amendments) and
prepare Level of Service (LOS) results for the weekday AM and PM peak periods. The analyses would be
conducted using the latest NYSDOT approved methodology and traffic analysis software.
Trip generation (see attached memorandum) was based on data presented in the Institute of Transportation
Engineers (ITE) Trip Generation Manual, 11th Edition. These data would be used to estimate the potential
increase in traffic as a result of the proposed zoning amendments. Existing traffic data and available parcel
information (theoretical building programs, theoretical site access points) would be used to develop
theoretical buildout-generated trip assignments to the adjacent public roadways. The analyses would
include assumptions regarding potential driveway locations to develop trip assignments for the theoretical
maximum buildout. The driveway locations utilized for the analysis would be determined based
consultation with the Village.
Trips generated by the theoretical maximum buildout would be overlaid onto the Existing volumes to
develop the capacity analysis for the future Build Conditions. Potential traffic impacts resulting from the
theoretical maximum buildout would be identified, and a range of potential mitigation measures would be
recommended.
AKRF would qualitatively assess public transportation, pedestrian, and bicycle conditions in the study area.
AKRF would compare parking requirements and demand for the existing zoning versus the proposed
amendments utilizing the latest version of the ITE Parking Generation Handbook and the Village parking
requirements for each zoning district.
FEE SCHEDULE
AKRF would complete the above referenced scope of work for a not to exceed budget of $19,450 (including
expenses) as shown in Table 1 and in accordance with our Standard Terms and Conditions, included as
Appendix A to our contract dated June 16, 2021. This fee includes one round of team comments that
does not require any additional quantified analysis. A separate scope and fee would be provided to
respond to any comments beyond the one round of team comments indicated above.
1 The Village has agreed that a No Build scenario analysis will not be required as part of the TIS. Therefore, the
analyses would be performed for the Existing and Build conditions.
Mr. Bryan Healy
March 21, 2022
Direct/Out-of-pocket expenses (e.g., travel expenses, copying, overnight delivery, etc.) are not included in
this fee and would be billed separately at cost, in accordance with our contract dated June 16, 2021. The
proposed cost also assumes that there would be no changes to the project that would require AKRF to redo
work already performed.
If this proposal is acceptable, we would request that the $43,000 budget authorized by the Village through
PO# 2200075, which covers the previously authorized (completed) trip generation analysis ($5,000),
meetings/coordination ($13,500), the other SEQRA forms and studies for the zoning amendments
($24,500) be increased to $61,950.
Thank you for the opportunity to submit this proposal and we look forward to continuing to work with you
on this project.
Table 1
Budget by Task Breakdown
Task
Cost
Task 1 – Data Collection
$3,000 (Lump Sum)
Task 2 – Traffic Impact Study
$15,950* (Lump Sum)
Expenses
$500 (Time and Materials)
TOTAL BUDGET
$19,450
Note:
*This is the maximum (not to exceed) TIS budget assuming that none of the six
intersections proposed for analysis would screen-out and all six intersections would be
analyzed.
AKRF, Inc.
Nina Peek, AICP
Vice President, Hudson Valley
Office Director
Aaron Werner, AICP
Technical Director/Project
Manager
Environmental, Planning, and Engineering Consultants
34 South Broadway
Suite 300
White Plains, NY 10601
tel: 914 949-7336
fax: 914 949-7559
www.akrf.com
Offices in New York ● New Jersey ● Pennsylvania ● Maryland ● Connecticut
Memorandum
To:
From:
AKRF, Inc.
Date:
February 25, 2022
Re:
Trip Generation Summary – Proposed HSRG Overlay and LI District Zoning
Amendments
AKRF has completed trip generation calculations for the theoretical maximum buildout projected
under the proposed HSRG Overlay and LI District zoning amendments. The calculations are based
on trip generation rates and data provided in the Institute of Transportation Engineers (ITE) Trip
Generation Manual, 11th Edition (the most recent edition available at this time). The results of the
trip generation calculations are presented in Table 1.
To generate a theoretical maximum buildout scenario for the HSRG Overlay area, it was assumed
that all parcels within the existing HSRG Overlay district and proposed expansion area would be
redeveloped with multifamily residential buildings with a floor area ratio (FAR) of 0.8, a
maximum height of three stories/35 feet, and compliance with on-site (off-street) parking
requirements as per the proposed zoning amendments. The theoretical maximum buildout scenario
for the HSRG Overlay resulted in a total of 383 residential units and 583 off-street parking spaces.
To generate a theoretical maximum buildout scenario for the LI district parcels, the calculations
assumed that each of the three parcels (48, 49, and 50) would be redeveloped with a 1.2 FAR
mixed-use building containing ground floor commercial space with residential space above, at a
maximum height of five stories, while also meeting the on-site parking requirements as per the
proposed zoning amendments. The theoretical maximum buildout scenario for the LI district
parcels resulted in a total of 87 residential units, 21,831 square feet of ground floor commercial
space, and 142 off-street parking spaces (55 spaces for commercial uses and 87 spaces for
residential uses).
Off-street parking requirements for any new multifamily residential uses in the HSRG Overlay
area are expected to be the same as what is currently permitted for mixed-use buildings through
Section 230-20.3(d) of the Village Zoning Code (one parking space per unit, plus one additional
parking space for each bedroom in the unit in excess of one bedroom). However, because the
buildout calculations did not account for bedrooms and assumed each residential unit would be
Village of Croton-on-Hudson
February 25, 2022
1,000 square feet in area, a ratio of 1.5 parking spaces per projected unit was applied for the HSRG
Overlay, which is considered conservative. Due to the Village’s desire to introduce a Transit-
Oriented Development (TOD) concept to the LI district parcels included in the study, which are
within close proximity to public transit and municipal parking lots, off-street parking requirements
for mixed-use development on the three LI district parcels was assumed to be 1 parking space per
residential unit and 1 parking space per 400 square feet of commercial floor area. For context, the
Village's C-2 (General Commercial) district currently permits the greater of 1 space per 300 square
feet of office floor area or 1 space per 250 square feet of retail/service area.
For both the HSRG Overlay and LI district parcels included in the study, projected uses were
assumed to be accommodated within one building per parcel, with the projected amount of
required parking accommodated on each parcel as well. The area calculation for the required
number of parking spaces assumed that one space requires 325 sf. This was calculated by adding
the area of a typical parking space (10 ft. x 20 ft. = 200 sf) to the area equal to half the circulation
aisle (10 ft. x 12.5 ft = 125 sf).
The complete lists of assumptions utilized to complete the buildout and parking calculations,
which have been vetted through the Village, will be included in the FEAF Part 3 Supplemental
Narrative being prepared by AKRF.
Trip generation calculations were performed for the Weekday AM, Weekday PM, and Saturday
Midday peak hours. Credits were taken account for internal trips between the land uses (i.e.,
pedestrian trips between land uses that would not generate additional vehicle trips) within the
Project Area, and for mass transit usage. In addition, pass-by trip1 credits were taken for the retail
and restaurant land uses. As shown in Table 1, the total trip generation numbers would be 165,
241, and 216 trips for the Weekday AM, Weekday PM, and Saturday Midday peak hours.
Since the number of trips for each peak hour examined exceeds 100 trips, it is anticipated that a
quantified analysis at key intersections will be required. The quantified analysis would assist the
Village in assessing the potential for traffic impacts, in the unlikely event that the entirety of the
Project Area is fully redeveloped under the parameters of the proposed zoning amendments, as
assumed through the conservative buildout calculations. Selection of any intersections to be
included in the analysis would be determined based on consultation with the Village.
Figure 1 shows the nine intersections proposed for quantified analysis and also illustrates the
general trip distribution pattern percentages to and from the Project Area. Figures 2, 3, and 4
illustrate the estimated net trips (i.e., less any trip credits such as pass-by or transit credits) that
would be distributed across the roadway network based on the percentages shown in Figure 1. It
is important to note that the illustrated study area intersections, trip distribution patterns, and trip
assignments are for preliminary discussion purposes only and are subject to modification based on
consultation with the Village and any traffic data that would be collected in support of the
quantified analysis (e.g., traffic counts).
1 A pass-by trip is a trip already present in the traffic stream and is made as an intermediate stop on the way from an
origin to a separate primary trip destination without a route diversion. Pass-by trips are not considered as new trips to
the overall roadway network.
Code #
Land Use
In
Out
Total
In
Out
Total
In
Out
Total
HSRG
Multifamily Housing
(3 story max.)
Multifamily Housing (Low-Rise) - Not
Close to Rail Transit (1)
383 Units
LI TOD
Multifamily Housing
(5 story max.)
Multifamily Housing (Mid-Rise) - Not
Close to Rail Transit(2)
87 Units
470 Units
-4
-13
-17
-14
-8
-22
-10
-9
-19
-4
-11
-15
-12
-8
-20
-9
-8
-17
470 Units
7.423 kSF (8)
-1
-1
-1
-1
-2
-1
-1
-1
-1
7.859 kSF (8)
-1
-1
-2
-3
-2
-5
-3
-2
-5
-1
-1
-2
-2
-3
-5
-2
-3
-5
Pass-by Trips (9)
-2
-1
-7
-7
-14
-6
-5
-11
6.549 kSF (6)
-1
-1
-3
-2
-5
-4
-3
-7
-3
-2
-5
-4
-2
-6
Pass-by Trips (10)
-1
-1
-12
-6
-18
-19
-14
-32
21.831 kSF
Notes:
(1) ITE equation T = 0.31(X) + 22.85 (24% entering, 76% exiting) was used for the Weekday AM Peak Hour
ITE equation T = 0.43(X) + 20.55 (63% entering, 37% exiting) was used for the Weekday PM Peak Hour
ITE rate of 0.41 trips/dwelling unit (50% entering, 50% exiting) was used for the Saturday Midday Peak Hour.
(2) ITE equation T = 0.44(X) - 11.61 (23% entering, 77% exiting) was used for the Weekday AM Peak Hour
ITE equation T = 0.39(X) + 0.34 (61% entering, 39% exiting) was used for the Weekday PM Peak Hour
ITE Equation Ln(T) = 1.00 Ln(x) - 0.91 (51% entering, 49% exiting) was used for the Saturday Midday Peak Hour.
(3) ITE rate of 1.67 trips/1,000 SF (82% entering, 18% exiting) was used for the Weekday AM Peak Hour
ITE rate of 2.16 trips/1,000 SF (34% entering, 66% exiting) was used for the Weekday PM Peak Hour
ITE rate of 0.53 trips/1,000 SF (54% entering, 46% exiting) was used for the Saturday Midday Peak Hour. ITE Rates unavailable for the "Small Office Building" land use for the
Saturday Midday Peak Hour, therefore, "General Office Building" land use rates were utilized instead.
(4) ITE rate of 2.36 trips/1,000 SF (60% entering, 40% exiting) was used for the Weekday AM Peak Hour
ITE rate of 6.59 trips/1,000 SF (50% entering, 50% exiting) was used for the Weekday PM Peak Hour
ITE rate of 6.57 trips/1,000 SF (51% entering, 49% exiting) was used for the Saturday Midday Peak Hour
(5) ITE rate of 0.73 trips/1,000 SF (50% entering, 50% exiting) was used for the Weekday AM Peak Hour
ITE rate of 7.80 trips/1,000 SF (67% entering, 33% exiting) was used for the Weekday PM Peak Hour
ITE rate of 10.68 trips/1,000 SF (59% entering, 41% exiting) was used for the Saturday Midday Peak Hour
(6) Internal trips calculated utilizing an internal trip credit of 10%.
(7) Mass Transit credit calculated utilizing a 10% mass transit credit.
(8) The commercial square footage was assumed to be 34% office, 36% retail, and 30% restaurant.
(9) Pass-by trip percentage of 34% utilized for the Weekday PM peak hour and 26% utilized for the Saturday Midday peak hour, based on average of pass-by trip percentages presented in the Institute of
Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition for ITE Land Use Code 820 "Shopping Center". ITE Pass-by trip percentage unavailable for Land Use 820 for the
Weekday AM peak hour and was developed from the ratio of Weekday AM to Weekday PM peak hour trips yielding a pass-by trip percentage of 20%.
(10) Pass-by trip percentage of 44% utilized for the Weekday PM peak hour, based on average of pass-by trip percentages presented in the Institute of
Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition for ITE Land Use Code 931 "Quality Restaurant". ITE Pass-by trip percentages unavailable for Land Use 931 for the
Weekday AM and Saturday Midday peak hours and were developed from the ratio of Weekday AM and Saturday Midday to Weekday PM peak hour trips yielding pass-by trip percentages of
24% and 57% for the Weekday AM and Saturday Midday peak hours, respectively.
*Source: ITE Trip Generation Manual, 11th Edition
Total Commercial
TOTAL TRIP GENERATION
Strip Retail Plaza (<40k)(4)
Internal Trips (6)
Mass Transit Credit (7)
Total Retail
Restaurant
Fine Dining Restaurant(5)
Internal Trips (6)
Mass Transit Credit (7)
Total Restaurant
Commercial
LI TOD
Office
712 / 710
Small Office Building (AM, PM) /
General Office Building (Sat.)(3)
Internal Trips (6)
Mass Transit Credit (7)
Total Office
Retail
Weekday PM Peak Hour
Saturday Midday Peak Hour
Residential
Subtotal Residential
Internal Trips (6)
Mass Transit Credit (7)
Total Residential
Table 1
Trip Generation*
Croton Zoning Study
Building
Component
Zoning
Component
Land Use
Description
ITE Land Use
Size
Weekday AM Peak Hour
5%
10%
15%
10%
15%
5%
35%
20%
70%
Exiting Trip Distribution Percentages
(Reverse for entering trips)
15%
General Project Area
Outline
PROPOSED STUDY AREA
INTERSECTIONS AND TRIP
DISTRIBUTION PERCENTAGES
Proposed Study Area Intersections
1. Croton Point Ave. and Veterans Plaza
2. Croton Point Ave. and Rt. 9/9A Southbound Ramps
3. Croton Point Ave. and Rt. 9/9A Northbound Ramps
4. Croton Point Ave. and S. Riverside Ave.
5. S. Riverside Ave. and Shopping Center Driveway
6. S. Riverside Ave. and Benedict Blvd.
7. S. Riverside Ave. and Clifton St.
8. S. Riverside Ave. and Oneida Ave.
9. Benedict Blvd. and Wayne St.
Proposed Turning Movement Count (TMC) Time Periods
Weekday AM: 7:00 AM - 10:00 AM
Weekday PM: 4:00 PM - 7:00 PM
Saturday Midday: 11:00 AM - 2:00 PM
Estimated Two-Way Project Generated Traffic
Volumes
Estimated One-Way Project Generated Traffic
Volumes
General Project Area
Outline
ESTIMATED NET TRIP
ASSIGNMENT VOLUMES -
WEEKDAY AM PEAK HOUR
Estimated Two-Way Project Generated Traffic
Volumes
Estimated One-Way Project Generated Traffic
Volumes
General Project Area
Outline
ESTIMATED NET TRIP
ASSIGNMENT VOLUMES -
WEEKDAY PM PEAK HOUR
Estimated Two-Way Project Generated Traffic
Volumes
Estimated One-Way Project Generated Traffic
Volumes
General Project Area
Outline
ESTIMATED NET TRIP
ASSIGNMENT VOLUMES -
SATURDAY PEAK HOUR