WAC Memo for generator 2022
memo
1 page
Meeting: portal event 761 (no meeting page on file)
Agenda item: LWRP Consistency Review for the installation of a generator at Symphony Knoll (15 Mount Airy Road).
Memo, 1 page. Attached to agenda item: “LWRP Consistency Review for the installation of a generator at Symphony Knoll (15 Mount Airy Road).”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
F-2022-0196-LWRP Memo
LWRP Generator
Extracted text
ANN GALLELLI
Members
STUART GREENBAUM
LEN SIMON
Attorney
LINDA WHITEHEAD
Village Engineer
DANIEL O’CONNOR, P.E.
TO: Mayor Brian Pugh and the Village Board of Trustees
FROM: Chairman Gallelli, Waterfront Advisory Committee
RE: Referral from the Village Board regarding Letter from NY State Department of State
requesting a LWRP Consistency Review for federal funding to build a 4x8 concrete
slab and a five-foot-wide trench to house the gas and electric pipes for a new
generator adjacent to the existing senior residential facility at 15 Mt. Airy Road, Croton
on Hudson, NY
DATE: April 8, 2022
On April 7th, 2022, the Waterfront Advisory Committee (WAC) reviewed the above-referenced
referral for consistency with the Village’s Local Waterfront Revitalization Program (LWRP).
Based on the review of the application documents, the WAC made a recommendation of
consistency with the LWRP. The vote was 3-0.
The WAC evaluated this application for consistency in accordance with the LWRP policy
standards and conditions set forth in section 225-6(J) of the Village Code, which are further
explained and described in Section III of the LWRP. The WAC members reviewed the policies
in the LWRP and believe that the policies listed below are applicable to this application:
POLICY 11A: Erosion and sediment control measures shall be undertaken in order to
safeguard persons, protect property, prevent damage to the environment, and promote
the public welfare by guiding, regulating and controlling the design, construction, use
and maintenance of any development or other activity which disturbs or breaks the
topsoil or results in earth movement.
POLICY 30B: Storage and disposal of all materials shall be monitored by the state to
assure there will be no discharge or leaching of materials into coastal waters.
The installation of the concrete slab, gas piping and electrical conduit will require soil
excavation. Sediment and erosion control best management practices should be used during
construction to prevent soil transplant to the storm drain system and waterways.