Probing location for pricing flat
resolution
2 pages
Meeting: portal event 761 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept a proposal from Antonucci & Associates of Pelham, New York, for the preparation of bid documents and special inspections of the engine room floor at the Grand Street Firehouse at a cost not to exceed $30,000.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept a proposal from Antonucci & Associates of Pelham, New York, for the preparation of bid documents and special inspections of the engine room floor ”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2022-04-04 Proposal- Main Engine Room Floor Structural...
Fire House village of Croton Proposal 8.24.2021
Res 144-2021 Grand St. Firehouse
Res 51-2022 Grand St. Firehouse
Extracted text
CORE #1
AT LOW POINT
CORE #3
AT HIGH POINT
CORE #2
AT MID POINT
PROBES NOTE:
CONTRACTOR TO PROVIDE CONCRETE CORING
MACHINE.
CORES DIAMETER SHALL BE 3 INCH AND PERFORMED
THROUGH THE FULL DEPTH OF THE SLAB.
USE PACHOMETER TO DETECT AND AVOID
REINFORCEMENT DURING DRILLING OPERATION.
PROBE SHALL BE RESTORED AS REQUIRED AFTER
COMPLETION OF WORK.
CONTRACTOR MUST COORDINATE WORK WITH THE
ENGINEER AND THE VILLAGE OF CROTON.
2 FT
PROBE #4.
SAWCUT PERIMETER OF THE PROBE
AREA (2FT X 2 FT) AND REMOVE
CONCRETE TO EXPOSE TOP
REINFORCEMENT FOR ENGINEER
INSPECTION. CONCRETE SHALL BE
REMOVED 3/4" BEYOND EXISTING
REINFORCEMENT. RESTORE PROBE AS
REUIRED AFTER COMPLETION.
2 FT
2 FT
2 FT
PROBE #5.
SAWCUT PERIMETER OF THE PROBE
AREA (2FT X 2 FT) AND REMOVE
CONCRETE TO EXPOSE BOTTOM
REINFORCEMENT FOR ENGINEER
INSPECTION. CONCRETE SHALL BE
REMOVED 3/4" BEYOND EXISTING
REINFORCEMENT.
CONTRACTOR SHALL RESTORE THE
PROBE AS REQUIRED AFTER
COMPLETION.