croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

WCC DRAFT 9.22.2021

minutes 2 pages
Meeting: portal event 771 (no meeting page on file)
Agenda item: Approval of Minutes — September 22, 2021 Draft Minutes
Minutes, 2 pages. Attached to agenda item: “Approval of Minutes — September 22, 2021 Draft Minutes”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
MINUTES OF WATER CONTROL COMMISSION Wednesday, September 22, 2021 PRESENT: Mr. Stuart Greenbaum, Chairman Mr. Mark Goldfarb Mr. Leo Wiegman Mr. Richard Wetherbee ABSENT: Dr. Merrily Besvinick ALSO PRESENT: Daniel O’Connor, Village Engineer 1. Call to order 2. REFERRAL a) Sol Systems -- Veterans Plaza--Referral from Planning Board to Water Control Commission for review and recommendation of a wetland permit for the Amended Site Plan application for solar canopies and battery entry storage system at the Croton Harmon Train Station Parking Lot. Present: Mr. Colin Duncan, TRC Engineering, (Environmental consultants) Mr. Duncan explained that Sol Systems had received a variance from the Zoning board and are currently in the process of obtaining site plan approval. Part of the solar canopy plan is in the watercourse buffer zone and the Planning Board referred the application to the Water Control Commission for its review and recommendation for a Wetland Activity Permit. The Water Control Commission members asked questions about excavation and removal and disposal of contaminated materials, erosion and sediment control measures during the construction phase, and the impact of the flood levels in the train station parking. In response to the question about contaminated soil, Mr. Duncan stated that there will be no exposed concrete in order to minimize exposure; the train station parking lot is an impervious surface now and will remain impervious. Soil being removed may be additionally tested before it goes to a soil/landfill facility, and standard operating procedure and protocols will be followed. Mr. Duncan stated that the water runoff is currently being reviewed. Erosion and Control measures include a SWPPP that has been submitted to the Planning Board, a plan that has identified areas where temporary catch basin filters will be installed, hay bales and silt fence will be installed to guard against water runoff. There was a discussion about flood water protections to protect the site from 100 year flood events. The Village Engineer stated that the flood elevation is currently 7 but might be going up to 12 with new FEMA calculations. The battery energy storage system is out of the flood plain area. The Village Engineer noted that there was concern about water coming off the panels and hitting the ground and icing and refreezing on the pavement. The village is still in discussion about how to address this issue. The Water Control Commission agreed to make the following recommendations to the Planning Board: 1. That, the contaminated soils be disposed of in accordance with DEC requirements 2. That, Best Management Practices be used for erosion and sediment control during construction. 3. That, the transformers (north and south) be kept above the stipulated FEMA level. The Water Control Commission approved the resolution by a vote of 3 AYES and 1 Recusal (Mr. Wetherbee works for TRC) and 1 Absentee (Dr. Besvinick). The Water Control Commission approved the minutes of the WCC meeting of May 19, 2021, and the July 21, 2021 minutes, by a vote of 3-0 (Mr. Wiegman abstained). There being no further business to come before the Water Control Commission, the meeting was adjourned. Respectfully submitted by, Ronnie L. Rose Secretary to the Water Control Commission

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.