Res 95-2022 Capital Projects Closeout
resolution
2 pages
From the meeting:
Board Of Trustees — 2022-06-21
Agenda item: Proposed Resolutions — Consider authorizing the Village Treasurer to close certain capital accounts associated with various projects.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Treasurer to close certain capital accounts associated with various projects.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Extracted text
On motion of TRUSTEE _________, seconded by TRUSTEE __________, the
following resolution was adopted by the Board of Trustees of the Village of
Croton-on-Hudson, New York:
Resolution #95-2022
WHEREAS, there are a number of capital projects that have been completed; and
WHEREAS, the Village Treasurer recommends closing the capital accounts
associated with these projects as follow:
PROJECT #
PROJECT BALANCE
Grand Street FH Apron Replacement
55,780.20
South Riverside
(15,370.33)
TEP Grant – Bicycle Ped Improvement
353,999.15
Half Moon Bay Bridge Rehab
27,297.54
Sprinkler System – WEFH
22,011.35
Sanitation Truck
0.00
Washington Engine Central A/C
2,094.30
Washington Engine Fire Generator
4,851.16
Grand Street Upgrades
5,591.70
Computers and Software Upgrade
0.22
DPW Vehicles 2016/17
65.36
Engineers Vehicle
1,759.47
LPR System PD
98.80
DPW Equipment
(184.31)
Demolition of Existing DPW
25,174.68
Engineering Design Parking Lot
2,298.81
Police Replacement Vehicle
0.00
Triple Combination Pumper
0.00
SCBA Replacement Plan
54.29
Police Electric Hybrid Vehicle
1,956.77
DPW Vehicles
0.11
Electric Hybrid Vehicle
257.02
Computers for Vehicles
0.00
Hessian Hills Upgrade
1.33
NOW, THEREFORE BE IT RESOLVED: that the Board of Trustees authorizes
the Village Treasurer to close the above listed accounts as of May 31, 2022, and
return $384,879.92 to the Debt Service Fund and $14,188.26 to the General Fund;
AND BE IT FURTHER RESOLVED: that $61,371.90 shall be deposited into the
capital account 23444 for continued use at the Grand Street Firehouse;
AND BE IT FURTHER RESOLVED: that $27,297.54 shall be deposited into the
capital account 15287 for future rehabilitation work of the Half Moon Bay Bridge.
Dated: June 21, 2022
Machine-extracted for search and reference — the original PDF is the authoritative version.