Cover Letter - Narrative
correspondence
22 pages
Meeting: portal event 795 (no meeting page on file)
Agenda item: Correspondence — Referral from the Town of Cortlandt regarding a Public Hearing for the property located at 1065 Quaker Bridge Road East.
Correspondence, 22 pages. Attached to agenda item: “Correspondence — Referral from the Town of Cortlandt regarding a Public Hearing for the property located at 1065 Quaker Bridge Road East.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
CrotonReferral.2022-4.Gurdjieff
Scanned.Drawing.Set
SignedPHNotice
Extracted text
.J (845) 298-2000
[li.i (845) 298-2842
.i< info@sdglaw.com
:;;: sdglaw.com
Kenneth M. Stenger
Stephen E. Diamond*
Jessica .J. Glass
Karen E. Hagstrom
Ian C. Lindars
Albert P. Roberts
PARTNER EMERITUS
Mary Kate Ephraim
A.J. luele
Meghan B. Mossey
OF COUNSEL
Joan F. Garrett''
PARALEGALS
Elizabeth Amicucci
Jennifer Arno
Jillian Medina
.ll.lison Secor
February 16, 2022
Chairperson Loretta Taylor
Town of Cortlandt Planning Board
1 Heady Street
Cortlandt Manor, NY 10567
Re:
Gurdjiejf Foundation, Inc.
Dear Chairperson Taylor:
MAIN OFFICE
1136 Route 9
Wappingers Falls
New York 12590
Poughkeepsie Journal Building
85 Civic Center Plaza, Suite 100
Poughkeepsie, NY 12601
By appointment only
Kingston Office
303 Clinton Avenue
Kingston, NY 12401
By appointment only
Please direct all inqui, ies
to the Main Office
We are counsel to The Gurdjieff Foundation Inc. ("Foundation"). The
Foundation is a non-profit foundation incorporated in the State of New York and
recognized as tax exempt under Section 501(c)(3) of the Internal Revenue Code,
as it is organized and operated exclusively for charitable purposes.
The Foundation is under contract to purchase real property located at 1065
Quaker Bridge Road East, Town of Cortlandt, New York ("the Property"), from
the Danish Home for the Aged Inc. The Property is located in the R-80 zoning
district.
The Foundation is applying for site plan and special permit for approval of a non
school curriculum program use of the Property. A detailed description of the
Foundation's proposed use of the Property can be found in the enclosed narrative.
Also enclosed for your review and consideration are the following:
•
Planning Board Application
CLOSING COORDINATORS•
Full Environmental Assessment Form
Maria L. Jones
•
Site Access, Traffic and Parking Summary, prepared by DTS Provident
Sandra A. Turner
f
d b
d
•
Survey o Property prepare
y Ba ey & Watson
'ALSO ADMITTED IN Fl. & MA
.. ALSO ADMITTED IN CT
""ALSO ADMITTED IN NJ
•
Site Plan Application fee in the amount of $1,000 and escrow deposit in the
amount of $5,000
Thank you for your consideration.
STENGER, DIAMOND & GLASS, LLP
. 0 (
JESSICA J. GLASS, ESQ.
The intent of the Gurdjieff Foundation is to preserve and sustain the Danish Home property as an
architectural, environmental and neighborhood asset that can serve as a location for the activities
of its members. To support those activities, the Foundation aims to maintain buildings and
grounds to provide an atmosphere of quiet and contemplation. The Foundation centers its work
on the study of the methods and teachings of G.I. Gurdjieff. He was an author, teacher and
musician, whose ideas were influenced by various ancient cultural and religious sources. Central
to this philosophy is a focus on the individual human being in relation to others and all the
influences of life. The Foundation’s membership consists primarily of adults between the ages
of 45 through 70 years old, generally from professional backgrounds such as doctors, lawyers,
engineers, architects, educators and artists.
The program undertaken by the Foundation includes workshops on the study of these ideas and
practical application, along with the study of movement, creative arts and crafts. The activities
are based on the concepts of self-help and self-awareness to promote a more humane manner of
interacting with oneself and the world.
The activities, programs and workshops that the Gurdjieff Foundation anticipate taking place on
the property will mostly be several days in duration. Most weekends would begin on Friday
evening and end mid-day Sunday. Weeklong programs are generally from Saturday to Saturday,
or Sunday to Sunday. There may also be some single day activities, typically from 9:00 in the
morning to 5:00 in the afternoon. These activities would generally have between 20 and 100
participants. That number includes people taking care of cooking, housekeeping and other
necessities. We don’t anticipate having more than 75 people sleeping at the property, exclusive
of residents in the caretaker’s house. We may also have weekday meetings, typically twenty
people or less, generally in the evening.
Foundation events, whether week-long events in the summer or shorter weekend events, usually
follow a similar schedule. Several members will plan the event, decide on a program and
determine who will attend. Participants typically arrive in the late afternoon or early evening.
Some come earlier to help with preparations for the event, which might include cooking and
receiving deliveries from local vendors. Once everyone arrives they will typically share a meal
and a period of meditation before retiring for the night.
Each day usually begins with meditation and breakfast for everyone. After eating, participants
divide into different groups, taking care of practical necessities, caring for the grounds, or
working together on crafts or other activities, such as mind-body exercise, gardening,
philosophical study, or similar activities. Lunch together may be followed by a rest period, and
then a continuation of the group work of the morning. The evening meal is often followed by an
activity for all participants, which could be listening to music, listening to readings, or a meeting.
During some events, there may be classes in dance movement during the day.
The last day of the event often ends in the late morning, after participants have had a meal
together and cleaned up the premises.
Activities that generate noise will be infrequent. Apart from equipment that may be needed for
building maintenance, most equipment will consist of small power tools, some shop equipment
(primarily in the garage) and equipment required to maintain the grounds. The most noise is
likely to be associated with grounds keeping, and likely to be similar to current levels. The
Foundation will not employ the use of any loudspeakers on the grounds of the property, nor will
music from any of the events be audible from outside the building or immediately adjacent
grounds. The main building is more than 400 feet from the nearest neighbor’s buildings, and the
garage is over 1,000 feet away from the nearest building on adjacent properties. The property
has wooded areas along the boundaries with all residential properties. Given the distances and
the protected nature of the property, along with little or no noise in excess of typical residential
levels, noise from Foundation activities is anticipated to have no impact on neighboring
properties.
For many reasons, the Foundation intends to keep traffic into the property at the lowest practical
levels. We intend to take advantage of the proximity to the Croton train station to encourage
members to make use of public transit. Participants driving to the property can pick up others at
the train station to reduce trips. Based on our experience at our New York City property, we
expect that many will carpool from their homes with other members. We may purchase a van to
facilitate pickups from the train station. There may be a few occasions each year when we hire a
bus to bring people from New York City. These would typically be small buses, and would
arrive and leave at the beginning and end of activities (most likely only for some events lasting
four days or more).
QUAKER RIDGE ROAD
QUAKER BRIDGE ROAD EAST
OLD CROTON AQUEDUCT TRAILWAY
VILLAGE OF CROTON-ON-HUDSON
PROPERTY
ENTRANCE
CARETAKER'S
COTTAGE
GARAGE
BARN
MAIN BUILDING
1065 QUAKER BRIDGE
ROAD EAST
CON ED
EMERGENCY ACCESS
TO LAKEWOOD ESTATE
LAKEWOOD
ESTATE
THE GURDJIEFF FOUNDATION
TOWN OF CORTLANDT, NEW YORK
AERIAL PHOTO
FIGURE NO. 1
Sources:
Aerial Photo: Google Earth, Oct 2020
GIS Data: Westchester County GIS
Survey of Property by Badey & Watson, 2022
Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either “Yes” or “No”. If the answer to the initial question is “Yes”, complete the sub-questions that follow. If the
answer to the initial question is “No”, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the
project sponsor to verify that the information
contained in Part 1is accurate and complete.
A. Project and
Sponsor Information.
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
E-Mail:
State:
Project Contact (if not same as sponsor; give name and title/role):
E-Mail:
State:
E-Mail:
State:
FEAF 2019
B. Government Approvals
B. Government Approvals Funding, or Sponsorship. (“Funding” includes grants, loans, tax relief, and any other forms of financial
assistance.)
a. City
Town
,
Yes
No
or Village Board of Trustees
b. City, Town or Village
Yes No
Planning Board or Commission
c. City Town or
Yes No
Village Zoning Board of Appeals
d. Other local agencies
Yes No
e. County agencies
Yes No
f. Regional agencies
Yes No
g. State agencies
Yes No
h. Federal agencies
Yes No
i. Coastal Resources.
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?
Yes
No
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program?
Yes No
iii. Is the project site within a Coastal Erosion Hazard Area?
Yes No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the
Yes
No
only approval(s) which must be granted to enable the proposed action to proceed?
If Yes, complete sections C, F and G.
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site
Yes No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action
Yes No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway
Yes No
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No
or an adopted municipal farmland protection plan?
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.
Yes No
If Yes, what is the zoning classification(s) including any applicable overlay district?
b. Is the use permitted or allowed by a special or conditional use permit?
Yes No
c. Is a zoning change requested as part of the proposed action?
Yes No
If Yes,
i. What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
c. Which fire protection and emergency medical services serve the project site?
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
b. a. Total acreage of the site of the proposed action?
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor?
c. Is the proposed action an expansion of an existing project or use?
Yes No
i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________
Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?
Yes No
If Yes,
i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
Yes No
iii. Number of lots proposed? ________
iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
Yes
No
_____ months
_____
_____ month _____ year
Will
proposed action be constructed in multiple phases?
If No, anticipated period of construction:
If Yes:
Anticipated commencement date of phase 1 (including demolition)
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
N/A
f. Does the project include new residential uses?
Yes
No
If Yes, show numbers of units proposed.
g. Does the proposed action include new non-residential construction (including expansions)?
Yes
No
If Yes,
i. Total number of structures ___________
ii. Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii. Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any
Yes No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment: ________________________________________________________________________________
ii. If a water impoundment, the principal source of the water: Ground water Surface water streams Other specify:
iii. If other than water, identify the type of impounded/contained liquids and their source.
Volume: ____________ million gallons; surface area: ____________ acres
v. Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both?
Yes No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
iv. Will there be onsite dewatering or processing of excavated materials?
Yes No
If yes, describe. ___________________________________________________________________________________________
________________________________________________________________________________________________________
v. What is the total area to be dredged or excavated? _____________________________________acres
vi. What is the maximum area to be worked at any one time? _______________________________ acres
vii. What would be the maximum depth of excavation or dredging? __________________________ feet
viii. Will the excavation require blasting?
Yes No
ix. Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment
Yes No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
Will
proposed action cause or result in disturbance to bottom sediments?
Yes
No
If Yes, describe: __________________________________________________________________________________________
iv. Will
proposed action cause or result in the destruction or removal of aquatic vegetation?
Yes
No
If Yes:
a
of
vegetation proposed to be removed ___________________________________________________________
acreage of aquatic vegetation remaining after project completion ________________________________________
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
proposed method of plant removal: ________________________________________________________________________
if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v. Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water?
Yes No
If Yes:
i. Total anticipated water usage/demand per day: __________________________ gallons/day
ii. Will the proposed action obtain water from an existing public water supply?
Yes No
If Yes:
Does the existing public water supply have capacity to serve the proposal?
Yes No
Is the project site in the existing district?
Yes No
Is expansion of the district needed?
Yes No
Do existing lines serve the project site?
Yes No
iii. Will line extension within an existing district be necessary to supply the project?
Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
Source(s) of supply for the district: ________________________________________________________________________
iv. Is a new water supply district or service area proposed to be formed to serve the project site?
Yes No
If, Yes:
Proposed source(s) of supply for new district: _______________________________________________________________
v. If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private),
maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes?
Yes No
If Yes:
i. Total anticipated liquid waste generation per day: _______________ gallons/day
ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii. Will the proposed action use any existing public wastewater treatment facilities?
Yes No
If Yes:
Name of wastewater treatment plant to be used: _____________________________________________________________
Name of district: ______________________________________________________________________________________
Does the existing wastewater treatment plant have capacity to serve the project?
Yes No
Is the project site in the existing district?
Yes No
Is expansion of the district needed?
Yes No
Existing system (previously approved by Westchester County
Department of Health (WCDOH) and operated by the Danish
Home for the Aged, Inc ) to be further reviewed with WCDOH.
Existing system to be further reviewed with
Westchester County Department of Health
Yes No
Do existing sewer lines serve the project site?
Will
line extension within an existing district be necessary to serve the project?
Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?
Yes No
If Yes:
What is the receiving water for the wastewater discharge? __________________________________________________
v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
vi. Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point
Yes No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii. Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Will stormwater runoff flow to adjacent properties?
Yes No
iv. Does
proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?
Yes No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel
Yes No
combustion, waste incineration, or other processes or operations?
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
iii. Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit,
Yes No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet
Yes No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application, the project will generate:
___________Tons/year (
) of Carbon Dioxide (CO2)
___________Tons/year (
) of Nitrous Oxide (N2 )
___________Tons/year (
) of Perfluorocarbons (PFCs)
___________Tons/year (
) of Sulfur Hexafluoride (SF6)
___________Tons/year (
) of Carbon Dioxide equivalent of Hydroflo rocarbons (H
)
___________Tons/year (
) of Hazardous Air Pollutants (HAPs)
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants,
Yes No
landfills, composting facilities)?
If Yes:
i. Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as
Yes No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial
Yes No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected (Check all that apply):
Morning
Evening
Weekend
Randomly between hours of __________ to ________.
ii. For commercial activities only, projected number of truck trips/day
v.
Existing _____________
Proposed ___________
Net increase/decrease _____________
Yes No
vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric
Yes No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing
Yes No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand
Yes No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
iii. Will the proposed action require a new, or an upgrade to an existing substation?
Yes No
l. Hours of operation. Answer all items which apply.
N/A
Refer to project narrative
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,
Yes No
operation, or both?
If yes:
i. Provide details including sources, time of day and duration:
ii. Will
proposed action remove existing natural barriers that could act as a noise barrier or screen?
Yes No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
n. W
th
ill
prop
e
os
actio
ed
hav
n
e outd
ligh
oor
ting?
Yes No
If yes:
i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?
Yes No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
o. Does the proposed action have the potential to produce odors for more than one hour per day?
Yes No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p.
Yes No
Will the proposed action include any bulk storage of petroleum (
over 1,100 gallons)
or chemical products
?
If Yes:
Product(s) to be stored ______________________________________________________________________________________
Volume(s) ______
per unit time ___________ (e.g., month, year)
Generally describe
proposed storage facilities ________________________________________________________________
________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides,
Yes No
insecticides) during construction or operation?
If Yes:
ii. Will the proposed action use Integrated Pest Management Practices?
Yes No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal
Yes No
of solid waste (excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s) to be generated during construction or operation of the facility:
Construction: ____________________ tons per ________________ (unit of time)
Operation : ____________________ tons per ________________ (unit of time)
ii. Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
iii. Proposed disposal methods/facilities for solid waste generated on-site:
No new tanks proposed
N/A
N/A
s. Does the proposed action include construction or modification of a solid waste management facility?
Yes No
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii. Anticipated rate of disposal/processing:
________ Tons/month, if transfer or other non-combustion/thermal treatment, or
________ Tons/hour, if combustion or thermal treatment
iii. If landfill, anticipated site life: ________________________________ years
t. Will
proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous
Yes No
waste?
If Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii. Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv. Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility?
Yes No
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
Urban Industrial Commercial Residential (suburban) Rural (non-farm)
Forest Agriculture Aquatic
Other (specify): ____________________________________
ii. If mix of uses, generally describe:
b. Land uses and covertypes on the project site.
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
Other
Describe: _______________________________
________________________________________
c. Is the project site presently used by members of the community for public recreation?
Yes No
i. If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed
Yes No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i. Identify Facilities:
e. Does the project site contain an existing dam?
Yes No
If Yes:
ii. Dam s existing hazard classification: _________________________________________________________________________
iii. Provide date and summarize results of last inspection:
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility,
Yes No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
Yes No
If yes, cite sources/documentation: _______________________________________________________________________
ii. Describe the location of the project site relative to the boundaries of the solid waste management facility:
iii. Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin
Yes No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any
Yes No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site
Yes No
Remediation database? Check all that apply:
Yes – Spills Incidents database
Provide DEC ID number(s): ________________________________
Yes – Environmental Site Remediation database
Provide DEC ID number(s): ________________________________
Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database?
Yes No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv. If yes to (i), (ii) or (iii) above, describe current status of site(s):
v. Is the project site subject to an institutional control limiting property uses?
Yes No
If yes, DEC site ID number: ____________________________________________________________________________
Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
Describe any use limitations: ___________________________________________________________________________
Describe any engineering controls: _______________________________________________________________________
Will the project affect the institutional or engineering controls in place?
Yes No
Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?
b. Are there bedrock outcroppings on the project site?
Yes No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: Well Drained:
_____% of ite
Moderately Well Drained:
Poorly Drained
_____% of ite
f. Approximate proportion of proposed action site with slopes:
0-10%:
10-15%:
15% or greater:
g. Are there any unique geologic features on the project site?
Yes No
If Yes, describe: _____________________________________________________________________________________________
________________________________________________________________________________________________________
h. Surface water features.
i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,
Yes No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site?
Yes No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,
Yes No
state or local agency?
iv. For each identified
wetland and waterbody on the project site, provide the following information
Streams:
Lakes or Ponds:
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired
Yes No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floodway?
Yes No
j. Is the project site in the 100 year Floodplain?
Yes No
k. Is the project site in the 500 year Floodplain?
Yes No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer?
Yes No
If Yes:
(ChB, ChC, ChD)
(CsD. CrC)
(CtC, CuD, HrF)
m. Identify the predominant wildlife species that occupy or use the project site:
n. Does the project site contain a designated significant natural community?
Yes No
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii. Source(s) of description or evaluation: ________________________________________________________________________
iii. Extent of community/habitat:
Following completion of project as proposed: _____________________ acres
Gain or loss (indicate + or -):
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as
Yes No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of
Yes No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing?
Yes No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to
Yes No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present?
Yes No
i. If Yes: acreage(s) on project site? ___________________________________________________________________________
ii. Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National
Yes No
Natural Landmark?
If Yes:
Biological Community
Geological Feature
ii. Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area?
Yes No
If Yes:
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district
Yes No
which is listed on
of Historic P
of Historic Places?
If Yes:
i. Nature of historic/archaeological resource: Archaeological Site
Historic Building or District
ii. Name: _________________________________________________________________________________________________
iii. Brief description of attributes on which listing is based:
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
Yes No
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site?
Yes No
If Yes:
i. Describe possible resource(s): _______________________________________________________________________________
ii. Basis for identification: ___________________________________________________________________________________
h.
Yes No
the project site
any officially designated and publicly accessible federal, state, or local
scenic or aesthetic resource?
If Yes:
i. Identify resource: _________________________________________________________________________________________
ii. Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
etc.): ___________________________________________________________________________________________________
iii. Distance between project and resource: _____________________ miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers
Yes No
Program 6 NYCRR 666?
If Yes:
i. Identify the name of the river and its designation: ________________________________________________________________
ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666?
Yes No
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name ___________________________________ Date_______________________________________
Signature________________________________________________ Title_______________________________________
Site Access, Traffic and Parking
The proposed Project is located at 1065 Quaker Bridge Road East in the Town of Cortlandt (the
“Property”). The proposed Project will convert the existing nursing home facility, formerly the Danish
Home, to a facility for the Foundation. The following section discusses the Site Access, Traffic and
Parking aspects for the Project,
Site Access
A full movement driveway currently provides access to the Property, forming an unsignalized three-
legged intersection with Quaker Bridge Road East, just west of Quaker Ridge Road. The driveway
then extends into the Property for approximately 0.4 miles, with the main building approximately a
quarter mile from Quaker Bridge Road East. Con Edison also utilizes this driveway approximately
four-six times a year to access their power line transmission towers to the north of the Site. The
driveway also provided access for fuel trucks, sanitation trucks, as well as tour buses for the Danish
Home. These trucks have had no issues accessing or traveling through the Site. Deliveries for the
Project would be generally less than those for the Danish Home which require more frequent food
deliveries. Loading for the Site would generally be performed along the driveway on the southern side
of the main building, serving the small garage and kitchen areas, similar to what was done with the
Danish Home.
There is also an access road connecting the Site with Lakewood Estate. This road was not used for the
Danish Home and is not projected to be utilized by the Foundation. This access road is only used for
emergency access for the Lakewood Estates. It also provides truck access to Lakewood Estates for
trucks that cannot travel under the stone archway entrance/exit for Lakewood Estates along Quaker
Ridge Road.
Traffic
The Danish Home provided 24 beds for the nursing home residents and had a full staff of nurses, food
service, custodial, caretakers, and administration, etc. In addition, the Danish Home also held various
events on-site including some for approximately 500 people, with an estimated 250 vehicles. There
was one special event that had approximately 3,000 people.
The Foundation anticipates holding activities, programs and workshops on the Property that will
mostly be several days in duration. It is projected that these would occur on approximately 10-15
weekends per year and for 6-7 full weeks during the summer months. Most weekends would begin on
Friday evening and end mid-day Sunday. Weeklong programs are generally from Saturday to
Saturday, or Sunday to Sunday. There may also be some single day activities, typically from 9:00 in
the morning to 5:00 in the afternoon. These activities would generally have 20 participants, although
some will have up to 100 participants. That number includes people taking care of cooking,
housekeeping and other necessities, as there is no staff. At the events with 100 people, it is not
anticipated having more than 75 people sleeping at the property, exclusive of residents in the caretaker’s
house. There may also be some weekday meetings, typically twenty people or less, generally in the
evening.
Foundation events, whether week-long events in the summer or shorter weekend events, usually follow
a similar schedule. Several members will plan the event, decide on a program and determine who will
attend. Participants typically arrive in the late afternoon or early evening. Some come earlier to help
with preparations for the event, which might include cooking and receiving deliveries from local
vendors. Once everyone arrives, they will typically share a meal and a period of meditation before
retiring for the night. The last day of the event often ends in the late morning after a meal and clean up.
For many reasons, the Foundation intends to keep traffic into the property at the lowest practical
levels. The Foundation will take advantage of the proximity to the Croton train station to encourage
members to make use of public transit. Participants driving to the property can pick up others at the
train station to reduce trips. Based on the Foundation’s experience at their New York City property, it
is expected that many will carpool from their homes with other members. The Foundation may
purchase a van to facilitate pickups from the train station. There may be a few occasions each year
when the Foundation hires a bus to bring people from New York City or another location. These
would typically be small buses and would arrive and leave at the beginning and end of activities (most
likely only for some events lasting four days or more).
Overall, traffic generated by the Foundation would generally be similar to that of the Danish Home,
with less daily traffic. As described above, the traffic generated by the Foundation is expected to be
limited to the arriving and departure periods of guests. As the retreat takes place, there will be very
minimal traffic in and out of the property. This will be further mitigated by guests using the Croton-
Harmon Train Station and by carpooling. Thus, the Foundation traffic is not projected to adversely
impact the adjacent roadways.
Since many guests will be arriving from New York City, it is expected that many will be using the
Croton-Harmon Metro North Railroad Station. From the train station to the property, it is
approximately a 10-minute drive. The expected route for the shuttles from the train station is to take
NYS Route 9 southbound and turn left at Old Albany Post Road. Old Albany Post Road then
becomes Quaker Ridge Road and vehicles would then turn right onto Quaker Ridge Road. The
shuttle would travel on Quaker Ridge Road for approximately 1.25 miles and then turn left onto
Quaker Bridge Road East, where they will turn right into the Site driveway. Other guests would
mainly come from Rockland or Westchester County and would utilize either NYS Route 9 or the
Taconic State Parkway to reach the Site.
Parking
Parking is currently provided at the Property and consists of approximately 30 paved parking spaces.
Thirteen parking spaces are located in front of the main building and seventeen parking spaces are
located at the garage. Additional parking can be provided in the interior courtyard which is fully
paved. When the Danish Home held their 500-person events with approximately 250 vehicles, they
had no issue accommodating the vehicles parking on the site. This was accomplished by using the on-
site grass areas as land banked parking spaces. The roadway was left clear for circulation and
emergency access.
The Project is expected to generate minimal parking demand since many guests are expected to use
public transit or carpool to get to the property. Additional parking, if necessary, will be provided on
the grass areas.
Machine-extracted for search and reference — the original PDF is the authoritative version.