Resolution 178-2022 Water Pump
resolution
1 page
Meeting: portal event 810 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $10,956.48 to replace two flow meters within the Village's water distribution system.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $10,956.48 to replace two flow meters within the Village's water distribution system.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Flow meter price quotation
Extracted text
On motion of TRUSTEE_____, seconded by TRUSTEE _____, the following
resolution was adopted by the Board of Trustees of the Village of Croton-on-
Hudson, New York; with the following vote: -.
Resolution #178-2022
WHEREAS, the Village of Croton-on-Hudson utilizes flow meters at its water
distribution pumps to measure the amount of water being pumped through the
distribution system; and
WHEREAS, the existing meters are a minimum of thirty years old, and have
reached the end of their functional life; and
WHEREAS, the Village has received a quote for two new flow meters from Miller
Energy Inc. of South Plainfield, New Jersey for a total cost of $10,956.48; and
WHEREAS, as this emergency expense was unforeseen, funding for this expense
was not included in the 2022-2023 Water Fund budget,
NOW THEREFORE BE IT RESOLVED: that the Village Treasurer is authorized
to transfer $10,956.48 from Water Fund Contingency Account F1990.4000 to the
following account:
F8320.2000 – Supply - Equipment
$10,956.48
Dated: November 21, 2022
Machine-extracted for search and reference — the original PDF is the authoritative version.