Half Moon Bay Bridge Additional Scope3
resolution
3 pages
From the meeting:
Board Of Trustees — 2026-08-19
· our coverage →
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering in the amount of $32,230 for additional scopes of work required by the New York State Dept. of Transportation for the Half Moon Bay Bridge Rehabilitation Project.
Resolution, 3 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering in the amount of $32,230 for additional scopes of work required by the New York State Dept. of Transportati”
Retrieved 2026-08-18 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Resolution 198-2026 HMB Bridge Additional Work Proposal
Extracted text
1 Van Wyck Street,
Croton-on-Hudson, N.Y. 10520
ATTN: Bryan T. Healy, Village Manager
July 29, 2026
VIA EMAIL (bhealy@crotononhudson
-ny.gov)
RE:
Half Moon Bay Bridge (BIN 2270050)
Rehabilitation
Village of Croton-on-Hudson, Westchester County, NY
Proposal for Professional Services - Additional Scope 3
Dear Mr. Healy:
In accordance with our recent work progress and coordination, Tectonic Engineering Consultants,
Geologists & Land Surveyors, D.P.C.
is pleased to submit our
proposal for the additional scope of the Half
Moon Bay Bridge (BIN 2270050) Rehabilitation
project, Village of Croton-on-Hudson, NY.
These services shall be performed for the
Village of Croton-on-Hudson, herein referred to as Client.
1.0
SCOPE OF SERVICES
During the detailed design phase, in accordance with the coordination, directions and review
comments provided by
NYSDOT, additional scope
s of work were performed for the project
. These
additional scopes of work were
performed so that the project can be progressed timely to fit in the
design deadline of the project per NYSDOT.
Pier Column Repair Design
Per directions during multiple meetings with NYSDOT, design the structural repair for the existing
steel pier columns at both piers. Per the latest DOT inspection, there are section lo
sses at the
column bases due to corrosion. This task consists of review of inspection report and existing
condition, investigations on possible repair methods, structural repair design
based on restoring
original capacity of the columns and drafting repair details. It requires additional efforts under
section 6 detailed design stage.
Load Rating of Steel Substructures
– Pier Cap Beams and Pier Columns
Per directions during multiple meetings with NYSDOT, prepare level 1 load rating of the existing
steel substructures of the bridge
– pier cap beams and pier columns. For the pier cap beams, this
task consists of further load calculations for load rating pu
rposes, evaluation of load rating factors,
prepare load rating report and address 1 round of future review comments. For the pier columns,
this task consists of detailed load calculations from the superstructure, detailed capacity
calculations in axial, flexure and P&M interaction, evaluation of load rating factors, prepare load
rating report and address 1 round of future review comments. It requires additional efforts under
section 6 detailed design stage.
2.0
FEES AND PAYMENTS
Tectonic will perform the scope and quantity of work outlined in Section 1.0 above, based on the
following fees.
Task Description
Estimated
Additional Fee
Section 6 Detailed Design
$32,230.00
Estimated Total
$32,230.00
Please have an authorized representative complete and sign the attached Authorization Form to
indicate acceptance of this agreement. Please return to Tectonic one signed copy of the completed
Authorization Form.
If you have any questions or
comments related to this proposal, please do not hesitate to contact
the undersigned directly at (860
) 563.2341.
TECTONIC ENGINEERING CONSULTANTS, GEOLOGISTS & LAND SURVEYORS, D.P.C.
____ Man Hou Sit____
Man Hou (Albert) Sit
Project Manager
Tectonic Engineering
CC:
, Village of Croton-on-Hudson
Jeff Scala, P.E., Senior Vice President, Tectonic Engineering
G:\Rocky Hill\Marketing\Proposals - Outstanding\23\PN23-1226 LDSA-Croton on Hudson Bridge Repl RFQ for Preliminary Design
- PIN
8763.05\Scope & Cost proposal_addl scope 2025 04\Half Moon Bay Bridge Additional Scope.docx
WORK AUTHORIZATION AND PROPOSAL ACCEPTANCE FORM
Proposal No: 23-1226
Date: 07/29/2026
Retainer Amount Required: $0.00
Project Name & Location:
Half Moon Bay Bridge (BIN 2270050) Rehabilitation
, Village of Croton-on-Hudson,
Westchester County, NY
Proposed Services: Bridge Design – Additional Scope
Proposal Acceptance
Acceptance (Signature):
Date:
Printed Name:
Title:
Company or Organization Name:
Client Contact Information (All of the following information about the person responsible for the identifie
tasks must be provided prior to starting work)
Scheduling Work and
Receipt of
Deliverables
Name:
Phone:
Email:
Receipt of Invoices
(Original)
Name:
Phone:
Email:
Receipt of Invoices
(Copies)
Name:
Phone:
Email:
Issuing Payments of
Invoices
Name:
Phone:
Email:
Machine-extracted for search and reference — the original PDF is the authoritative version.