Updated Visual Analysis %E2%80%93 Site Cross Sections by Insite Engineering dated September 5%2C 2024
environmental
1 page
Meeting: portal event 997 (no meeting page on file)
Agenda item: Continuation of the EAF Part II Consistency Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Environmental review, 1 page. Attached to agenda item: “Continuation of the EAF Part II Consistency Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
DRAFT FEAF PART II - 1 Croton Point Ave Incomplete
Draft Phase II Environmental Site Assessment Report
Environmental Noise Study and Facade Glazing...
Insite Preliminary Wastewater Engineering Report dated...
Insite Preliminary Water Engineering Report dated July...
Insite Stormwater Pollution Prevention Plan dated July...
Insite engineering and landscape architecture plans...
LWRP Lot A - Last Revised 10.16.24
Letter from Kimley Horn dated September 16%2C 2024...
Letter from NYSDOT consenting to the Board of Trustees...
Letter from the Division for Historic Preservation...
Memo from AKRF dated November 4%2C 2024
Extracted text
Z:\E\24154100 WBP Croton Point Ave\Misc Drawing Files\Sections\CS-1.dwg, 9/5/2024 2:13:16 PM, tmills, 1:1
Machine-extracted for search and reference — the original PDF is the authoritative version.