Memo from Village Manager Bryan Healy re%3A Fire Department input on the 1 Croton Point Avenue development%2C dated November 6%2C 2024

environmental 1 page
Meeting: portal event 997 (no meeting page on file)
Agenda item: Continuation of the EAF Part II Consistency Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.
Environmental review, 1 page. Attached to agenda item: “Continuation of the EAF Part II Consistency Review for the special permit application from WBP Development LLC for the construction of a multifamily development at 1 Croton Point Avenue.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: DRAFT FEAF PART II - 1 Croton Point Ave Incomplete Draft Phase II Environmental Site Assessment Report Environmental Noise Study and Facade Glazing... Insite Preliminary Wastewater Engineering Report dated... Insite Preliminary Water Engineering Report dated July... Insite Stormwater Pollution Prevention Plan dated July... Insite engineering and landscape architecture plans... LWRP Lot A - Last Revised 10.16.24 Letter from Kimley Horn dated September 16%2C 2024... Letter from NYSDOT consenting to the Board of Trustees... Letter from the Division for Historic Preservation... Memo from AKRF dated November 4%2C 2024
To: From: Date: November 6, 2024 Re: 1 Croton Point Avenue Development On October 2, 2024, a meeting with WBP Development and a number of Village officials was held to discuss the fire department’s response to the 1 Croton Point Avenue development plans. In attendance were Mayor Brian Pugh, Village Engineer Dan O’Connor, Fire Chief Joshua Karpoff and myself from the Village, along with John Bainlardi from WBP, Michael Bevivino from Arketekcher and Rich Williams from Insite Engineering. At the meeting, we discussed the preference of the fire department to have a machine room hydraulic elevator to ensure access to the necessary equipment in case of elevator rescues. It was also discussed that a condition be added to require the bike storage room have a 3-hour fire rating due to the increasing amount of lithium-ion battery fires. The fire apparatus turning plan was reviewed and determined to be acceptable based on the example apparatus used. The vehicle height clearance for the garage was discussed to see if any potential changes could be made to allow some smaller FD vehicles access. The fire department has requested that an additional hydrant be installed in front of the building which will be accommodated. The location of standpipes in the building to maximize access was also discussed. The building is being designed to be solar-ready, which the fire department is prepared to handle; however, solar panels may not be installed immediately as there may be some system capacity issues in the area. Mayor Brian Pugh Trustees Nora Moriarty Nicholson Ian Murtaugh Cara Politi Len Simon Village Manager Bryan T. Healy Village Treasurer Daniel Tucker Village Clerk Pauline DiSanto Village of Croton-on-Hudson New York Stanley H. Kellerhouse Municipal Building One Van Wyck Street Croton-on-Hudson, NY 10520-2501